Advantages of process layout, Operation Management

Assignment Help:

Advantages of Process Layout

  • Lower Capital Investment: Less capital is needed for this layout because production apparatus is applied to maximum capacity with minimum duplication. The designed volume of production can be turned out without the need for duplication of machines. Since the equipment is not passed on to any set sequence of operations, variety of product in required quantities can be produced with the same general machines and tools arranged department wise. With comparatively less investment more output can be turned out.
  • Greater Flexibility: Each machine can perform a wide range of similar kinds of operations. The same layout can be adopted for enlarged or revised operations without disturbing the departmental set up. There is flexibility in planning production with job scheduling for each department. Furthermore, it is possible to operate additional work on short notice undue dislocation of normal schedule and routine.
  • Specialization: Since the principle of specialization is followed in department allocation of work there will be fuller utilization of the kill of the employees.
  • Effective Supervision: More effective use of specialized abilities of supervision in one of the main merits of this type of layout. Each foreman supervises only a limited range of machine operations in the respective department( foreman welding department foreman machine department etc,) obviously his supervisory efforts or skill tend to more intensive. He becomes highly proficient in time and with practice". In planning direction, control, maintenance of the operations assigned to his department.
  • No Disruption in Work Schedules: Since each department has a back of machines and tools; breakdown of one machine does not necessarily upset the production schedule. It can be transferred to another machine in the department.
  • Lower Overhead costs: since the initial capital investment is relatively low risks of investment are reduced. Production equipment is more flexible and hence less subject to obsolescence and losses resulting from shifts in market demand. Hence overhead costs per unit will tend to be lower.

Related Discussions:- Advantages of process layout

Explain minimize the cost of completing the survey, For a telephone survey,...

For a telephone survey, a marketing research group needs to contact at least 150 wives, 120 husbands, 100 single adult males, and 110 single adult females. It costs $2 to make a da

Make to order - types of operation system, Make to order - Operations Syste...

Make to order - Operations Systems In this case, manufacture of the product does not commence until an order has been placed by the customer. In the best restaurants food is

Draw a schematic layout, The flow of materials through eight departments. E...

The flow of materials through eight departments. Even though the table shows flows into and out of the different departments, assume that the direction of flow is not important. In

Explain what are the most important criteria, In selecting outside advisors...

In selecting outside advisors, a board, consultants, and the like, what are the most important criteria?

Explain optimization technique and a heuristic to solve, What is the differ...

What is the difference between using an exact optimization technique and a heuristic to solve a problem?

Explain companies choose not to tie resources to their job, Some companies ...

Some companies choose not to tie resources to their projects. In what ways does this benefit a project? In what ways does this hinder a project?

What kind of transmission path does a fixed wireless signal, What type of t...

What type of transmission path does a fixed wireless signal require?

Explain rapidly changing business landscape, In the light of a rapidly chan...

In the light of a rapidly changing business landscape, it is imperative for firms to monitor the six major environmental forces: demographic, economic, social-cultural, natural, te

Define activity a can be finished and not delay any activity, Using the dat...

Using the data in Table 13-4, determine the latest time activity A can be finished and not delay any activity? Table 13-4 The following represents a project with known activity tim

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd