Activities to preparing long-term plans, Electrical Engineering

Assignment Help:

Activities to Preparing Long-term Plans

1. Data collection regarding existing loads, forecast of expected loads, operating conditions, and etc. from Grid substation up to consumer level.

2. Mapping of existing system.

3. Analysis   of   existing   system.

(Voltage regulation, T&D losses in existing system, Adequacy of backup system)

4. Load forecast.

5. Plan for upgrading the network.

6. Technology options involving integration of characteristics for modernization of system.

7. Evaluation of several alternatives for least cost optimal solution.

8. Firming up of scope of works.

9. Preparation of cost estimates.

10. Phasing of their cost and works.

11. Financial analysis.


Related Discussions:- Activities to preparing long-term plans

CST162_hw5, Draw the state diagram for the state machine described by Table...

Draw the state diagram for the state machine described by Table 7.5 in the text. Note, the table shows the transition to the next state S* from the current state S for the next set

Projects, I want project ideas.

I want project ideas.

Checking at site - testing of meter, Checking at Site - Testing of Meter ...

Checking at Site - Testing of Meter The routine testing of meters should be carried out once in 3 years. Further, surprise checks should be conducted at the consumer's install

Value of current if resistance connected to the battery, One battery having...

One battery having of eight cells in parallel. Emf and internal resistance of every cells is 1.5V and 0.4Ω. Find the value of current if an external resistance of 5Ω is connected t

Determine IS in the given circuit, Q. Given that V 0 = 10 V, determine IS ...

Q. Given that V 0 = 10 V, determine IS in the circuit drawn in Figure.

Selection of right- flex in electricity and gas hazards, Selection of Right...

Selection of Right- Flex : It is also important that the flex we choose is appropriate to the appliance used. Like fuses, the cables and flexes are also rated according to their

Multiplexers and flip flops, Decoders and multiplexers are termed, medium s...

Decoders and multiplexers are termed, medium scale integration (MSI) devices; this term implies that the device is complex in construction and usually its operation as well. Below

For zero flag - return instructions, For zero flag  RZ ( Return on Z...

For zero flag  RZ ( Return on Zero) and RNZ ( Return on no zero) Instructions RZ  returns from the subroutine to the  calling  program, if zero flag  is set  (Z= 1). The

Electromechanical energy conversion, derived expression for reluctant torqu...

derived expression for reluctant torque in rotating electrical machine

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd