1. Data collection regarding existing loads, forecast of expected loads, operating conditions, and etc. from Grid substation up to consumer level.
2. Mapping of existing system.
3. Analysis of existing system.
(Voltage regulation, T&D losses in existing system, Adequacy of backup system)
4. Load forecast.
5. Plan for upgrading the network.
6. Technology options involving integration of characteristics for modernization of system.
7. Evaluation of several alternatives for least cost optimal solution.
8. Firming up of scope of works.
9. Preparation of cost estimates.
10. Phasing of their cost and works.
11. Financial analysis.
Draw the state diagram for the state machine described by Table 7.5 in the text. Note, the table shows the transition to the next state S* from the current state S for the next set
I want project ideas.
Checking at Site - Testing of Meter The routine testing of meters should be carried out once in 3 years. Further, surprise checks should be conducted at the consumer's install
One battery having of eight cells in parallel. Emf and internal resistance of every cells is 1.5V and 0.4Ω. Find the value of current if an external resistance of 5Ω is connected t
Q. Given that V 0 = 10 V, determine IS in the circuit drawn in Figure.
Selection of Right- Flex : It is also important that the flex we choose is appropriate to the appliance used. Like fuses, the cables and flexes are also rated according to their
Decoders and multiplexers are termed, medium scale integration (MSI) devices; this term implies that the device is complex in construction and usually its operation as well. Below
state applications of split phase motor
For zero flag RZ ( Return on Zero) and RNZ ( Return on no zero) Instructions RZ returns from the subroutine to the calling program, if zero flag is set (Z= 1). The
derived expression for reluctant torque in rotating electrical machine
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd