Activities to Preparing Long-term Plans
1. Data collection regarding existing loads, forecast of expected loads, operating conditions, and etc. from Grid substation up to consumer level.
2. Mapping of existing system.
3. Analysis of existing system.
(Voltage regulation, T&D losses in existing system, Adequacy of backup system)
4. Load forecast.
5. Plan for upgrading the network.
6. Technology options involving integration of characteristics for modernization of system.
7. Evaluation of several alternatives for least cost optimal solution.
8. Firming up of scope of works.
9. Preparation of cost estimates.
10. Phasing of their cost and works.
11. Financial analysis.
I need help to build a circuit diagram for home energy management.It includes load controllers,a central system in which we should programme all of the control commands,and a two w
Phasor relation between different voltages and currents: In the capacitive circuit of Figure, find 1. Impedance, 2. Resultant current, 3. Power factor,
When sizing wire, one of the most difficult tasks is to calculate the electrical load that will be present on the conductors. How do you decide what size wire to use? What two fact
Explain temperature dependence of electrical conductivity and resistivity in conductors. When the temperature is increased, there is a greater thermal motion in atoms that redu
Determine the total energy loss: Two capacitors C 1 = 50 μF and C 2 = 100 μF are connected in parallel across 250 V supply. Determine the total energy loss. Figure
Q. Illustrate Inductance with example? An ideal inductor is also an energy-storage circuit element (with no loss associated with it) like a capacitor, but representing the magn
a) What do you mean by assembly procedures in FEM, discuss by taking suitable example of your choice. b) Write the potential energy equation for particular FE analysis of a prob
asdadsjas
In this Project you will simulate a Security Alarm system using the Quick flash board. A switch is placed as shown in the figure below. The main goal of this project is: Task 1:
Q. What do you mean by diversifiability of total risk? Traditional finance theory assets that the rate of return on risk assets depends on the size of business risk, financial
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd