coursework (commercial management), Civil Engineering

Assignment Help:
Ask que1. Identify the risks involved in this project related to cost in the perspective of the customer and analyse the probability of acceptance of such a project by customers.
2. Applying modern techniques to reduce the risks related to delay of the project from inception to completion and handover.
3. Identify analyse the risks involved in providing the support to the customers up to one year after the completion of the project and handover. stion #Minimum 100 words accepted#

Related Discussions:- coursework (commercial management)

Surveying, what is the trignomerty leveling

what is the trignomerty leveling

Simply-supported beam, A simply-supported beam (AB) with an overhang (BC) i...

A simply-supported beam (AB) with an overhang (BC) is illustrated in Figure 1(a), with the cross-sectional details given in Figure 1(b). The dead load comprises self weight only; f

Dissimilarity between open stirrups and closed stirrups, Question What is d...

Question What is dissimilarity in request between open stirrups and closed stirrups in Concrete beams? Answer Open stirrups are supplied principally to oppose shear forces in

Explain the surface water treatment methods, Explain the Surface Water Trea...

Explain the Surface Water Treatment Methods A. Physical Unit Operations change in water quality is brought about through the application of physical forces screenin

Survey, how can find forebearing

how can find forebearing

Steel and timber structures, design a tension member subjected to a pull of...

design a tension member subjected to a pull of 300KN using a channel section. the length of a joint available is only 400mm.check the condition of using lug angle for end connecti

Calculate the specific gravity of the soil particles, A piece of clay taken...

A piece of clay taken from a sampling tube has a wet weight of 1.553 N and volume of 95.3 cm 3 . After drying in an oven for 24 hours at 105°C, its weight 1.087 N. Suppose the spec

Pumping for concreting works, Question What are the key problems if use pu...

Question What are the key problems if use pumping for concreting works ? Answer In pumping operation , force exerted by pumps have to overcome friction involving concrete an

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd