Capacity Planning of Computer Systems and Networks, Operation Management

Assignment Help:
Problem:- 1
A system containing one CPU and a disk is serving database transactions. A transaction gets service from CPU and then from the main memory before leaving this system. In case, the access to the main memory is a miss, the transaction moves to receive service from a disk. In case of a miss, the CPU needs to process the transaction again. (We are assuming simple system here, real systems are complex).
CPU processing time for each visit by a transaction = 0.03 sec
Disk access time = 0.02 sec
No. of disk access generated by each transaction visit to disk mean that after each access it goes back to CPU)
Memory access time = 0.001 sec
Miss from the main memory = 10 %
= 10 (note this doesn’t
Transaction range = 10-50 transactions/sec (Check for 10,20...50)
Part 1:- Calculate the service demand and the utilization of all the resources. Determine which resource is the bottleneck for the system with throughput bounds analysis to show the feasibility of the system for the given range of transactions.
(5 marks) Part 2:- The system is not feasible for the complete range of the transactions. Following
three upgrades can be applied to the system:
a) Add two more CPUs, each CPU gets 1/3rd of the transactions
b) Double the main memory size, (half the number of misses).
c) Double the number of disks, each disk gets half of the transactions
d) Replace the disk with a faster disk of access time 0.015 sec.
Calculate the utilization of each resource and their throughput for the following combinations of upgrades, also point out which device is the bottleneck in each case (if any). Consider the transaction rate as 50/sec
1) a
2) a + b
3) a+ b + c
4) a+ b + d
(8 Marks)
CS9334 Assignment 1, March 28, 2013, 4:03 PM, Page 1
Part-3 (Bonus Marks) :- Another transaction type is to be introduced to the system that takes 5 disk accesses and CPU processing time of 0.1 sec. The combined transaction rate is 50 transactions/sec. With the modified system of the part2 (Option - 3) ( with upgrades of a+b+c), calculate the highest number of new transactions that the system can support. What is the impact of introducing this new transaction type?
(5 Marks)
Problem 2:-
Two sets of analysts working on a marine project require access to a database server. Set A and B include 4 and 5 analysts respectively. Set A analyst queries require 10 records to be read from the DB server’s disk on average, and require CPU processing time of 20 msec. Set B analyst queries require 5 records to be read from the DB server’s disk on average, and CPU time of 70 msec. The disk read time per record is 10msec. If only one set of analysts is allowed to access the DB server at any time, calculate the throughput of the DB system for both set of analysts.
(12 Marks)
Note: Numbers without explanation will receive poor marks.

Related Discussions:- Capacity Planning of Computer Systems and Networks

Explain loosening the constraints, Which of the following actions would exp...

Which of the following actions would expand the feasible region of an LP model? A.Loosening the constraints. B.Tightening the constraints. C.Multiplying each constraint by

Explain why do firms segment consumer markets, Why do firms segment consume...

Why do firms segment consumer markets? Enumerate the major segmentation variables and provide real-life examples of segmentation done by firms for their products/services.

Explain customer relationship management marketing, Describe the four-step ...

Describe the four-step framework for one-to-one marketing that can be adapted to CUSTOMER RELATIONSHIP MANAGEMENT marketing?

Explain what happens to throughput and cycle time, Consider a production sy...

Consider a production system that consists of a single station with a production rate of 1 part per minute and a process variability given by Ce=1. a) Suppose the system is run

Line balencing, What do you understand by “line balancing”? What happens if...

What do you understand by “line balancing”? What happens if balance doesn’t exist?

Determine whether ability and motivation is more important, Determine wheth...

Determine whether ability or motivation is more important in selecting the right person for the right job. Explain your rationale.

Describe linear programming problem, Swearingen and McDonald, a small furni...

Swearingen and McDonald, a small furniture manufacturer, produces fine hardwood tables and chairs. Each product must go through three stages in the manufacturing process - assembly

Explain how many hours would the average laborer, In December, general moto...

In December, general motors produced 7,200 customized vans at its plant in Detroit. The labor productivity at this plant is known to have been 0.10 vans per labor hour during that

Explain what is the expected project length, Task time estimates for the mo...

Task time estimates for the modification of an assembly line at Jim Goodale's Carbondale, Illinois, factory are as follows- a) 6.0 - b) 7.2 - c) 5.0 a d) 6.0 b,c e)

Explain the bargaining unit as technical workers, Jack is a 2nd level manag...

Jack is a 2nd level manager at Johnson Controls. His department includes 2 supervisors, 5 night shift security guards, 5 technical workers, 10 janitorial staff, and 25 manufacturin

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd