Capacity Planning of Computer Systems and Networks, Operation Management

Assignment Help:
Problem:- 1
A system containing one CPU and a disk is serving database transactions. A transaction gets service from CPU and then from the main memory before leaving this system. In case, the access to the main memory is a miss, the transaction moves to receive service from a disk. In case of a miss, the CPU needs to process the transaction again. (We are assuming simple system here, real systems are complex).
CPU processing time for each visit by a transaction = 0.03 sec
Disk access time = 0.02 sec
No. of disk access generated by each transaction visit to disk mean that after each access it goes back to CPU)
Memory access time = 0.001 sec
Miss from the main memory = 10 %
= 10 (note this doesn’t
Transaction range = 10-50 transactions/sec (Check for 10,20...50)
Part 1:- Calculate the service demand and the utilization of all the resources. Determine which resource is the bottleneck for the system with throughput bounds analysis to show the feasibility of the system for the given range of transactions.
(5 marks) Part 2:- The system is not feasible for the complete range of the transactions. Following
three upgrades can be applied to the system:
a) Add two more CPUs, each CPU gets 1/3rd of the transactions
b) Double the main memory size, (half the number of misses).
c) Double the number of disks, each disk gets half of the transactions
d) Replace the disk with a faster disk of access time 0.015 sec.
Calculate the utilization of each resource and their throughput for the following combinations of upgrades, also point out which device is the bottleneck in each case (if any). Consider the transaction rate as 50/sec
1) a
2) a + b
3) a+ b + c
4) a+ b + d
(8 Marks)
CS9334 Assignment 1, March 28, 2013, 4:03 PM, Page 1
Part-3 (Bonus Marks) :- Another transaction type is to be introduced to the system that takes 5 disk accesses and CPU processing time of 0.1 sec. The combined transaction rate is 50 transactions/sec. With the modified system of the part2 (Option - 3) ( with upgrades of a+b+c), calculate the highest number of new transactions that the system can support. What is the impact of introducing this new transaction type?
(5 Marks)
Problem 2:-
Two sets of analysts working on a marine project require access to a database server. Set A and B include 4 and 5 analysts respectively. Set A analyst queries require 10 records to be read from the DB server’s disk on average, and require CPU processing time of 20 msec. Set B analyst queries require 5 records to be read from the DB server’s disk on average, and CPU time of 70 msec. The disk read time per record is 10msec. If only one set of analysts is allowed to access the DB server at any time, calculate the throughput of the DB system for both set of analysts.
(12 Marks)
Note: Numbers without explanation will receive poor marks.

Related Discussions:- Capacity Planning of Computer Systems and Networks

Explain comparison of processes with a direct adversary, 1. A simulation mo...

1. A simulation model goes one step further than possible with analysis tools, because it can show how the process performs ____________ over time. 2. A(n) ____________ is a met

Explain what steps can ford motor take, The United Auto Workers union enter...

The United Auto Workers union enters into contract negotiations with the Ford Motor Company in Michigan. What are the three main subject areas the UAW can negotiate with Ford? Prov

Process configurations - products, Process configurations - products ...

Process configurations - products The categorisation of production systems according to volume of output was discussed: project, job shop, batch and continuous. The Hayes and

Product layout, how to identify layout ex holidays resort

how to identify layout ex holidays resort

Describe what is the expected value of perfect information, Director of leg...

Director of legal services of ABC Company must decide whether to hire another full-time lawyer or to hire part-time lawyers. Anticipated costs for the two options under three possi

Why is the eoq model important, 1. The annual demand for university student...

1. The annual demand for university students style note pads is 10,000 units. The supplier operates the business 300 days per year and delivers over five working days. Calculate th

Explain acronym ltpd, Explain acronym LTPD. Ans: The acronym LTPD is...

Explain acronym LTPD. Ans: The acronym LTPD is Lot Tolerance Percent Defective.

Method which benefit from standardization of ihrm activities, Examine two i...

Examine two issues of standardization and localization in general for MNEs. Determine two ways in which an organization would benefit from standardization of IHRM activities and tw

Describe detect the presence of assignable causes, If the time order of pro...

If the time order of production has not been recorded in a set of data from a process is it possible to detect the presence of assignable causes?

How to compute capacity utilization rate last of a month, 1. A manufacturin...

1. A manufacturing shop is designed to operate most efficiently at an output of 550 units per day. In the past month the plant produced 490 units. What was its capacity utilization

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd