You work for mit consulting a leading it project consulting

Assignment Help Computer Engineering
Reference no: EM13374754

You work for MIT Consulting, a leading IT project consulting company. Your expertise is in project management, scoping a project in terms of feasibility and providing an overview plan for board approval, negotiating with vendors and managing implementations. You work for a negotiated fixed project fee, or on a time and materials basis for open ended assignments.

You have been hired by the Client to provide a preliminary Project Plan for an important internal project. Client staff support the project and have secured Board approval for MIT Consulting to take the project to the next phase. 

Requirements defined:

A major international airline (of your choice) wants to upgrade its rostering tool, which has had many upgrades and still used some manual input.

  • More efficient scheduling of  crews, such that % utilisation of human capital improves significantly
  • Reduced costs as more  efficient use of home crews is used (crews go home over their shift,  rather than stay in an overseas hotel)
  • More dynamic rescheduling  based on staff requests (preferences, holidays, sick leave etc.)
  • Better staff morale and staff  retention rates based on a more dynamic, responsive and fairer rostering  system.
  • Adherence to all internal and  externally imposed staff rostering rules.
  • Effective and more efficient  seat assignments.
  • Efficient air fares.
  • Scheduling of time table for  flights.
  • Efficient routing of the flights.
  • Selection of airplanes (this  is with regards to the size of the airplanes) and decision should be based  on efficient fuel consumption. For example: Only one type of aircraft  (Boeing 737) making maintenance/ training cheaper and easier and spare  part inventories lower.
  • Lowest non fuel CASM (cost per  available seat mile) among airline.
  • Happy work force -highest paid  in industry Happy work force-highest paid in industry.

The report needs to have the following details: The number of pages for the report should not exceed more than 17 pages excluding appendix, references and table of contents.

  • MIT  Consultants needs to justify its substantial fee in providing this  overview project management plan.
  • After  summarising the business case, the Client wants to hear your  recommendations on the benefits realisation strategy. How can benefits be measured? How will the customer know the project  has been successful from a business perspective?
  • What  process model for the project do you recommend? Give a diagram. If necessary, start with an overview and  then drill down to more detail.  What is your rationale?
  • What  are the major context specific risks?  Can these risks be mitigated?  Are the treatment strategies cost effective?
  • How  do the Consultants feel about this project? In your experience, how would they rate  the project in terms of priority for the Client? Do you recommend against the project? Why?

Your brief is to objectively assess the project and address the following issues in your report to the Board:

Section

Description

A. Executive Summary

Summarise the project background, benefits, additional research required, suggested process model and treatment of major risks.

Conclude with overall recommendation as to the project's priority.

B. Business Case

Background for the project

Financial and/or strategic justification

Project success criteria.

How will the client know the project was successful?
How can the client ensure that the expected benefits are realised?

C. Process Model

What additional studies are necessary? 

e.g. Vendor selection, prototype to elicit detailed requirements with users, proof of concept to confirm technology, tools or platform etc.

What is the suggested project process model? 

Clear diagrams are essential.

D. Risk Management Plan

Client wants to see ONLY 'project specific' risks. They are aware of the generic risks that affect virtually all IT projects.

Tables should include each major risk identifying the source, event, consequence, probability, existing control(s) and initial risk rating.

Another table should include the risk treatment plan for each risk with an unacceptable rating including the cost justification and effectiveness (e.g. residual risk rating). 

E. Conclusion

In the Consultant's opinion how does this project rate for the client?

Should the client focus on other opportunities that have a better return on investment or a lower overall risk?

If this project is highly recommended, what are the key factors which have persuaded the Consultant?

Reference no: EM13374754

Questions Cloud

Identify the ip rights that are owned by an organization : identify the ip rights that are owned by an organization you currently or formerly have worked at. next explain which
Dan and cheryl are married file a joint return and have no : dan and cheryl are married file a joint return and have no children. dan age 45 is a pharmaceutial salesman and
How would you describe the discoveries of benjamin franklin : how would you describe the discoveries of benjamin franklin robert millikan cgarles-augastin de coulomb and ernest
I want to know how to draw bending moment diagram for this : i want to know how to draw bending moment diagram for this shape and the value of the moment in critical sections
You work for mit consulting a leading it project consulting : you work for mit consulting a leading it project consulting company. your expertise is in project management scoping a
This assignment requires a considerable amount of computer : this assignment requires a considerable amount of computer work and written comment. you may need to seek guidance from
Mining and metallurgy assignment metallurgyyou need to : mining and metallurgy assignment metallurgyyou need to assess the viability of an ore classification algorithm to be
Topics to cover in your written reportbull lan bull wan : topics to cover in your written reportbull lan bull wan bull leased circuits private business circuits rented from a
The distribution of knowledge that you detailed in your : the distribution of knowledge that you detailed in your initial posting. this concept tells us that the solutions to

Reviews

Write a Review

Computer Engineering Questions & Answers

  Mathematics in computing

Binary search tree, and postorder and preorder traversal Determine the shortest path in Graph

  Ict governance

ICT is defined as the term of Information and communication technologies, it is diverse set of technical tools and resources used by the government agencies to communicate and produce, circulate, store, and manage all information.

  Implementation of memory management

Assignment covers the following eight topics and explore the implementation of memory management, processes and threads.

  Realize business and organizational data storage

Realize business and organizational data storage and fast access times are much more important than they have ever been. Compare and contrast magnetic tapes, magnetic disks, optical discs

  What is the protocol overhead

What are the advantages of using a compiled language over an interpreted one? Under what circumstances would you select to use an interpreted language?

  Implementation of memory management

Paper describes about memory management. How memory is used in executing programs and its critical support for applications.

  Define open and closed loop control systems

Define open and closed loop cotrol systems.Explain difference between time varying and time invariant control system wth suitable example.

  Prepare a proposal to deploy windows server

Prepare a proposal to deploy Windows Server onto an existing network based on the provided scenario.

  Security policy document project

Analyze security requirements and develop a security policy

  Write a procedure that produces independent stack objects

Write a procedure (make-stack) that produces independent stack objects, using a message-passing style, e.g.

  Define a suitable functional unit

Define a suitable functional unit for a comparative study between two different types of paint.

  Calculate yield to maturity and bond prices

Calculate yield to maturity (YTM) and bond prices

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd