Write down the speed-density and flow-density equations

Assignment Help Civil Engineering
Reference no: EM13561534

Assuming a linear speed-density relationship, the mean free speed is observed to be 60 mph near zero density, and the corresponding jam density is 140 veh/mi.

a)      Write down the speed-density and flow-density equations.

b)      Sketch the v-k, v-q, and q-k diagrams indicating the critical values.

c)      Compute speed and density corresponding to a flow of 1000 veh/hr

Note: 5,280 ft = 1 mile.

Reference no: EM13561534

Questions Cloud

Determine the clean filter head loss in a filter bed compose : Determine the clean filter head loss in a filter bed composed of 0.3 m of uniform anthracite (with an average size of 1.6 mm) placed over 0.3 m of uniform sand ( with an average size of 0.5 mm)
What is the rate of leakage in gallons per day : Evaporation from a nearby lake was 8 in. during June. It is estimated that 25 percent more will evaporate from the pool than the lake. On July 1, the pool is 5 inches below the top. Does the pool have a leak? If so, what is the rate of leakage in gal..
Develop a strategy for communicating high expectations : Develop a strategy for communicating high expectations
Determine the magnitude of the car : If the car passes point A with a speed of 20m/s and begins to increase its speed at a constant rate of At=0.5m/s^2, determine the magnitude of the car's acceleration when s=100m and x=0.
Write down the speed-density and flow-density equations : Assuming a linear speed-density relationship, the mean free speed is observed to be 60 mph near zero density, and the corresponding jam density is 140 veh/mi.
Portfolio project management : Portfolio project management
How will the concentration of solute change in the water : Some organisms live in shallow ponds, where much of the water will evaporate during the warm, sunny, summer months. How will the concentration of solute change in the water druing this time? Will this create problems for the organims in the pond wate..
Name at least five reasons why new product or service : Name at least five reasons why new product or service
How you think the distribution system : how you think the distribution system, The Hartley-Davis motorcycle dealer in the Minneapolis- St. Paul area wants to be able to forecast accurately the demand for the Roadhog Super motorcycle during the next month.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate the maximum weight that can be sustained

A heavy Machine is lowered into a pt by means of a rope wrapped around an 8" diameter stationary pole placed horizontally across the top of the pit. The coefficient of static friction for the rope on the pole is 0.35.

  Determine flow on the road and space mean speed

Data obtained from aerial photography showed six vehicles on a 600 ft long section of road. Traffic data collected at the same time indicated an average time headway of 3.6 sec.

  Problem related to aerial photograph

The distance covered by an aerial photograph is determined by both the focal length of the camera and the tilt of the camera. Although the tilt is usually small, both archaeological and Canadian photographs often use larger tilts.

  Calculate the friction head loss per meter of pipe

When fluid of specific weight 8.2 KN/m^3 flows in a 150-mm-diameter pipe, the frictional stress between the fluid and the pipe wall is 25 N/m^2. Calculate the friction head loss per meter of pipe. If the flow rate is 42 L/s, how much power is lose pe..

  Determine the maximum allowable value of p

The compound bar carries the axial forces P and 2P. Find the maximum allowable value of P if the working stresses are 40 ksi for steel and 20 ksi for aluminum, and the total elongation of the bar is not to exceed 0.2 in.

  Compute the percent change n in the normal forces at a and b

During an engine test on the ground, a propeller thrust T = 4000 N is generated on the 1500 kg airplane with mass center at G. The main wheels at B are locked and do not skid; the small tail wheel at A has no brake.

  Determine the head loss caused by the piers

A bridge has cylindrical piers 1 m in diameter and spaced 15 m apart. Downstream of the bridge where the flow disturbance from the piers is no longer present, the flow depth is 2.9 m and the mean velocity is 2.5 m/s.

  Prepare and tabulate the design aid for partial flow

Prepare and tabulate the design aid for partial flow as per the equations for interpolation of velocity and diameter for corresponding flows.

  What is loss in truck operating cost for the logging company

The performance functions of these three routes are: t1=50+0.2v1, t2=80+0.1v2, t3=120 + 0.05v3 t1, t2, t3 and are travel times in minutes; v1, v2, v3 are flows in number of trucks per day.

  Why the highest head of the water in the excavation

why the highest head of the water in the excavation is mathematically guaranteed to occur on the edge of the excavation. explain in mathematical and/or physical.

  How large could the plant be without having the ground level

A 35 percent-efficient coal-fired power plant with effective height of 100 m emits SO2 at a rate of 0.6 lb/10^6 Btu into the plant. If winds are assumed to be 4 m/s at the stack height and just over 3 m/s at 10 m

  What is the weight density of the mortar sample

A sample of mortar fills a900 ml beaker. The mortar and beaker combined weighs 3 lb and theempty beaker weighs 2 oz. What is the weight density of this mortar sample

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd