Reference no: EM13856971
Write a Work Breakdown Strucure. the topic is Sales Promotion- Second Hand.
https://www.projectmanagementdocs.com/project-planning-templates/work-breakdown-structure-wbs.html#axzz3oxL9nHyP
Glossary of Terms
It's important that you provide a glossary of terms as some of the terms are not understood by persons without a project management background. For instance what the PMI Practice Standard for Work Breakdown Structures refers to as the WBS Code is commonly referred to as the WBS number.
Level of Effort: Level of Effort (LOE) is how much work is required to complete a task.
WBS Code: A unique identifier assigned to each element in a Work Breakdown Structure for the purpose of designating the elements hierarchical location within the WBS.
Work Package: A Work Package is a deliverable or work component at the lowest level of its WBS branch.
WBS Component: A component of a WBS which is located at any level. It can be a Work Package or a WBS Element as there's no restriction on what a WBS Component is.
WBS Element: A WBS Element is a single Work Breakdown Structure component and its associated attributes located anywhere within a
WBS. A WBS Element can contain work, or it can contain other WBS Elements or Work Packages.