Write a report of scope management plan

Assignment Help Project Management
Reference no: EM132514909 , Length: word count:2000

This assessment is designed to assess your technical skills in planning and communicating a project effectively. You required to work individually, select a project case (either from the provided links to the real-life projects or a project case from an organisation of your selection). The project should be in final stage of initial process, with either a signed off project charter or in the stage of getting the approval of the project charter.

You are required to write a report of scope management plan, schedule management plan and cost management plan. This report should include an introduction to the project case, a stakeholders' register, a brief project charter, project Scope management that includes: project justification, inscope and out-of-scope, constraints, Limits, assumptions, technical requirements, statement of work (SOW) and priority matrix (use the provided template). WBS structure (minimum of three levels), WBS dictionary, work packages and linking WBS to OBS, scope verification and validation methods, scope change control, and designing the change control boards (CCB) and roles and responsibilities.

You are required to continue working with your group on the selected project and develop and write a schedule management plan that includes processes, tools and techniques to be used and documents to be developed as per your client's requirements, define activities (activity list, proper activity logic, activities identification), milestones list, activities sequence, relationships (F_S, S_S, S_F, F_F), Lags, leading times, project network and critical path(s), estimates of activity duration (basics of estimation, durations, resources estimation and allocation), roles and responsibilities in scheduling, and monitoring and controlling schedule (EVA relevant to project schedule)

Just provide a description of the methods and tools. Since we are moving to online teaching and you don't have access to MS Project at APIC Lab, you are required to develop schedule plan, and develop schedule baseline using the Technique of Gantt Chart you learned in class, and to develop resources plan (resource sheet and allocation for each activity) using tables and figures by using MS Word.

You also require to develop and write project cost management plan that includes: plan cost management (identify processes, tools and techniques to be used and project documents to be developed as per your client's requirements), define cost elements (labour, material, variable cost), identify types of cost (direct, indirect, fixed, variable), determine the estimating method (s): (top-down, bottom-up), use estimating techniques (analogous, parametric, three-point method) to estimate budget (creation): establish time-phased budget, provide a discussion on monitoring and controlling cost (EVA relevant to project cost including forecasting and variances), and establish a cost baseline. This all can be done in MS word.

1- Don't spend too much effort in writing the project charter in detail

2- Don't spend too much effort in writing about the stakeholders register, you only need to add small table of main stakeholders, meeting frequency, responsibility, contact method, just for main stakeholders

3- for the WBS dictionary, you don't need to do this for all work packages, one prepackage dictionary is enough as long as you put your WBS components (main deliverable, sub, and activities) in a table and explain the work of each component, and you can add column of main resources or main responsible..etc

4- it is your option to select the tool you want to present your graphs, charts and tables, I mean you can use the excel sheets I provided or if you prefer using word is up to you, as long as all presented in clear way

5- remember this assessment is technical document and does not require literature review, it is mainly application of the knowledge and skills

Reference no: EM132514909

Questions Cloud

Pack resembling the new weight-loss pill pack : A team of physicians is studying a weight-loss pill. They recruited volunteers for a study. The volunteers were in the age group of 30 to 35 and were more
How much cash did r collect : Total sales during 2015 (all sales were on a credit basis) were $870,000. On the basis of the above, how much cash did R collect from its ARs during 2015
Student wanted to study the ages of couples : A student wanted to study the ages of couples applying for marriage licenses in his county. He studied a sample of 94 marriage licenses and found
Critically appraise the role of an ethical auditor : Critically appraise the role of an ethical auditor in providing confidence in a company and discuss whether the move to a new profession - the Corporate Auditor
Write a report of scope management plan : Write a report of scope management plan, schedule management plan and cost management plan. This report should include an introduction to the project case
Confidence interval for the mean weight of babies : What is a 95% confidence interval for the mean weight of babies whose mothers take vitamin supplements
What proportion of values would fall between 14 and 62 : Some numbers are not normally distributed. If the mean of the numbers is 38 and the standard deviation is 6, what proportion of values would fall between 26 and
What profits will if joe soup plant accepts the offer : If Joe's Soup plant accepts the offer, profits will? Joe's Soup plant has just received a special order to produce 400 cases of mushroom noodle soup
what is meant by objectivity in the IFAC Code of Ethics : Discuss what the procedures outlined in ISQC 1 Acceptance and Continuance of Client Relationships should ensure in respect of audit and assurance engagements

Reviews

Write a Review

Project Management Questions & Answers

  Generate a unit demand forecast for a product

As a consultant you have been asked to generate a unit demand forecast for a product for Year 2014 using exponential smoothing.

  Describe the functions of packaging of a disposable camera

How are changes in the company's product mix necessitating changes to the way managers market Kodak's offerings?

  Select a tool for project planning

Select a tool for project planning and scheduling from various tools available in the market

  Success of the project to understand the critical path

Why is it critical to the success of the project to understand the critical path and Can there be more than one critical path in a given project schedule?

  What is the normal project length in weeks

Bragg's Bakery is building a new automated bakery in downtown Sandusky. Here are the activities that need to be completed to get the new bakery built.

  What are the challenges of different status report

What are the challenges of different status report and what are the difference between status reports provided for teams, sponsors and steering commitee.

  Calculate product yield of file cabinetsthe colonial house

calculate product yield of file cabinetsthe colonial house furniture company manufactures two-drawer oak file cabinets

  What factors and risks may affect the schedule

What are some of the risks that must be considered in preparing a schedule? What factors and risks may affect the schedule?

  Execution of the project

In Project management the PM leads the initiation, planning, and execution of the project and the PMO

  How does the concept of activity late starts aid approach

What are the steps that CCPM employs to resolve resource conflicts on a project? How does the concept of activity late starts aid this approach?

  How inisope can sell their product online

How Inisope can sell their product online. This will tie into other process areas, such as using employee directory information to route customer inquiries.

  System consists of two components

A system consists of two components A and B that are connected in parallel. If the lifetime of A is exponentially distributed with a mean

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd