Would you decide to build an energy storage system

Assignment Help Mechanical Engineering
Reference no: EM131231148

Supposing you own some land next to a 50 MW wind farm located on Colorado's Front Range. Your land has a fantastic cliff/ridgeline with an elevation difference of 250 m. Evaluate whether or not you can make money by building an energy storage system on your land that interfaces with the wind farm. Your plan is to capture excess energy from the wind farm or buy energy from the wind farm when electricity prices are low and sell that energy back to the grid when electricity prices are high (assume that the utility that owns the grid will grant you a fair contract). You find that a good power rating for your storage system is 50% of the rated wind farm output, or 25 MW. Also your storage system should be able to generate electricity at rated power for 8 h. The first step in this problem is to evaluate the technical design of candidate energy storage systems.

a. Pumped hydroelectric. Determine the flow rate and reservoir size needed to accomplish the required power output and energy capacity. Pumped hydroelectric plants generally run at 80%-90% generating efficiency, depending on the size of the machinery. Suggest a reasonable surface area and depth for your two reservoirs.

b. Pulley and weight. You have a feeling that a simpler energy storage system is possible. What if you use a weight and a pulley that stores energy as the weight is lifted (using an electric motor) and energy is released when the weight falls (with an electric generator). You need to dig a shaft. Find the value of weight you would use, and the depth and diameter of the shaft. Is this viable?

c. Propose a new energy storage method. Be creative. Examples may be large springs, thermal storage, steam cycles, batteries, etc. Perform a simple analysis to size the system and say whether or not your creative idea is viable. The second step is to evaluate the financial aspects of installing and operating your energy storage system to determine whether you could make money.

a. Pumped hydroelectric costs about $500 per kW to install your turbomachinery and penstocks, plus $2 per cubic yard to build reservoirs. Calculate the initial capital cost of your pumped hydroelectric system.

b. Suppose you can buy energy from the wind farm at $0.035/kWh between the hours of 10:00 pm and 8:00 am to charge your storage and sell energy between 1:00 pm and 9:00 pm back to the grid at $0.1/kWh. Select a reasonable simple payback period that would motivate you to invest in energy storage. Calculate the maximum capital cost expenditure on your energy storage system that would allow this payback period.

c. Would you decide to build an energy storage system? Why or why not?

Reference no: EM131231148

Questions Cloud

Design a compressed air energy storage system : Design a compressed air energy storage system for a wind turbine. Assume that a cavity in an abandoned salt mine was available adjacent to the wind turbine. Use all the power generated above 5 kW to drive a compressor, which can compress the ambie..
Determine the hydrogen mass flow rate : A hydrogen/oxygen fuel cell stack produces 100 kW of DC power at an efficiency of 60% with water vapor as the product. Determine the hydrogen mass flow rate in g/s and the required cell voltage.
Derive an expression for the electric energy generation : Derive an expression for the electric energy generation per unit of air volume stored in a cavity for a CAES system. Assume that there are two expansion stages and express the work output as the sum of the output from the two stages. The system op..
Identify potential services you would suggest for company : The HR and executives' departments will need dedicated access and it is preferred to be mobile. Identify what type of assets you would choose to fulfill the company's needs. Identify potential services you would suggest for the company. There a..
Would you decide to build an energy storage system : Pumped hydroelectric costs about $500 per kW to install your turbomachinery and penstocks, plus $2 per cubic yard to build reservoirs. Calculate the initial capital cost of your pumped hydroelectric system.
Estimate the number of plants required : The total initial capital investment (if the cost of a nuclear plant is estimated at $6000 per kW and that of a fuel cell at $2100 per kW) [18].
What were the challenges with the decision : Do you get the impression that GE was concerned about the fact that they had infringed Fonar's patents? Why - what were two or three "take home" messages for you about the importance of patents?
Explain how you have categorized each given example : Explain how you have categorized each example. Explain how using each kind of rhetorical appeal (refer to your specific examples) helps King make his argument.
Discuss one of items on your preliminary hazards list : Discuss one of the items on your Preliminary Hazards List and explain your reasoning for hazard determination.

Reviews

Write a Review

Mechanical Engineering Questions & Answers

  Package design

Package Design Brief: Assume you are the packaging engineer for a large consumer products company. In this company, the Packaging Design Briefs are initiated by the marketing group and forwarded to the Package Engineering group.

  Mechanical engineering questions

Define dynamic viscosity, Determine the centroid, Pressure due to the height of liquid, Advantage of changing the liquid, Calculate the total moment about the hinge of the seal gate.

  Automatic control

DOF system and Find the differential equation describing the system

  Write a paper on boyle''s law

Write a paper on Boyle's law and describe Compression and Combustion stroke . Also explain Charles's law and illustrate SI engine and CI engine.

  Verify the law for parallelogram of forces

To Verify the law for parallelogram of forces, law for triangle of forces and law of polygon of forces. These laws are very useful to calculate unknown forces in very short time.

  Discharge pressure of the compressor

What is the discharge revised discharge pressure of the compressor.

  The Case for Global Accounting Standards

The role of IFRS in both developing and developed capital markets.

  Wind turbine

Wind turbines are becoming more and more common as a method of energy production, wind turbines by their very nature are dynamic and are subject to and create their own internal and external kinematics and kinetics.

  Advanced design methodologies

8 x product engineering and design review (week 2 – 12), ~3 pages per item which must contain a brief description of the product then delve into concepts such as materials selection, manufacturing methods, life cycle analysis, recyclability and overa..

  Design of absorption column and the cooler

Design of absorption column and the cooler. Process design of other units should be completed along with pipe sizes.

  Determine the maximum total bending moment

Determine maximum total bending moment (static plus dynamic) of the beam under steady-state conditions.

  Force of the water on the gate

Determine the magnitude of the horizontal and vertical components of the force of the water on the gate.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd