Work done when the volume of the balloon doubles

Assignment Help Civil Engineering
Reference no: EM131031581

Reconsider Prob.4-116E. Using the integration feature of the EES software, determine the work done. Compare the result with your "hand calculated" result.

Prob.4-116E

A spherical balloon contains 10 lbm of air at 30 psia and 800 R. The balloon material is such that the pressure inside is always proportional to the square of the diameter. Determine the work done when the volume of the balloon doubles as a result of heat transfer.

Reference no: EM131031581

Questions Cloud

Forecast-budget and control : Identify how you will create a percentage of overall revenue you will devout to your marketing effort. A “break down” of that percentage figure, based on the types of promotion you will use. The budget for the staff needed to carry out your plan. And..
Develop a java networked database project : Develop a java networked database project called myTicTacToe to have a server based database accessible by multiple users. The database should hold information on users (names, usernames, and passwords).
Problem regarding the withstand a stress : (i) What percent of these bolts will withstand a stress of 90 ksi without breaking? (ii) What range covers the middle 50% of breaking strengths for these bolts?
Determine the initial and final temperatures : Determine (a) the initial and final temperatures, (b) the mass of liquid water when the piston first starts moving, and (c) the work done during this process. Also, show the process on a P-v diagram.
Work done when the volume of the balloon doubles : A spherical balloon contains 10 lbm of air at 30 psia and 800 R. The balloon material is such that the pressure inside is always proportional to the square of the diameter. Determine the work done when the volume of the balloon doubles as a result..
Determine risk score and a recommended time frame : It is estimated to cost over $50,000 to replace the machine; however the hazard will be reduced by about 90%, since there is the remote possibility that a new machine might leak. Use the William Fine Method to determine Risk score and a recommend..
Problem regarding the units of measurement : Problem: For a biology project, you measure the tail length in centimeters and weight in grams of 12 mice of the same variety. What units of measurement do each of the following have?
Define the volume occupied by the refrigerant initially : Show the process on a P-v diagram with respect to saturation lines. Determine (a) the volume occupied by the refrigerant initially, (b) the work done, and (c) the total heat transfer.
New idea for treating advanced melanoma : Genetic engineering for cancer treatment. Here's a new idea for treating advanced melanoma, the most serious kind of skin cancer.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine minimum distance from diversion that a road signs

A temporary diversion has been constructed on a highway of +4 percent gradient due to major repairs that are being undertaken on a bridge. The maximum speed allowed on the diversion is 10 mph

  Calculate the chohesion of the clay in the natural states

A vane, 10 cm long and 8 cm in diameter, was pressed into soft clay at the bottom of a bore hole. Torque was applied and gradually increased 45 N-m when failure took place. Subsequently the vane rotated rapidly so as to completely remould the soil..

  1 introductionthe groundwater level has risen and now is

1. introductionthe groundwater level has risen and now is present in the cut. answer the following questions. show

  Write a program which will ask user for quantity and price

Then calculate a 6% tax on the total and display the total amount owed (including the tax) Round your answer to two decimal points and include the dollar sign in your display as appropriate.

  Determine the current that passes through resistance heater

The pressure is held constant during the process, while the volume is doubled. Determine the current that passes through the resistance heater.

  Determine annual volume of lanfill comsumed in meter

A MSW landfill is being designed to handle solid waste generated by Binford at a rate of 50 Mg/d. It is expected that the waste will be delivered by compactor truck on a 5d/week basis.

  Existing equal tangent sag curve

An overpass is being built over the PVI of an existing equal tangent sag curve. The sag curve has a 70 mi/h design speed, and G1 = -6%, G2 = +3%.

  Which alternative would be better if the equipment

A firm is deciding wheter to buy or rent equipment. How many days would they need to use the equipment each year to justify purchasing the equipment? To purchase equipmet/ Buy at $60,000

  Determine the maximum stress in the beam

A 280 KN.m couple is applied to a wooden beam, of rectangular cross section 38mm by 90mm ,in a plane forming an angle of 30 degree with the vertical, determine the maximum stress in the beam.

  What is the resultant force on one side of a 25cm diameter

What is the resultant force on one side of a 25cm diameter circular plate standing at the bottom of 3m of pool water

  What are the recorded values of r dot

At the bottom of a loop in the vertical plane an airplane has a horizontal velocity of 315 mi/h and is speeding up at a rate of of 10ft/s^2. The radius of curvature of the loop is 1mi

  Determine the maximum water hammer pressure if the initial

A 1000ft long steel pipe carries water from areservoir with a water elevation at 826ft. The pipe has a diameterof 12in. with a wall thickness of 0.5in.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd