Work breakdown structures

Assignment Help Accounting Basics
Reference no: EM131041202

Assessment TitleWork breakdownTask Description Assignment Overview
This assessment item requires you to consider:-

• work breakdown structures (WBS),
• WBS dictionaries, and
• work packets
...you must then develop both for a selected case study. The case studies, WBS, WBS dictionary and work packet templates will be supplied for a range of project domains:-
• Engineering and construction domain,
• Telecommunications and IT domain,
• Software development domain,
• Financial and business services domain,
• Welfare domain.

The WBS, WBS dictionary and work packets must meet the minimum requirement outlined in the PMBOK (2013) and conform to the requirements outlined in Directing Successful Projects with PRINCE2 (2009).
You are encouraged to use assignment outputs that you may have developed from previous assignments.

Task

Your task is to consider the overview above and write WBS, WBS dictionary and work packets using the templates that will supplied during the course.
You will be graded upon how well your WBS, WBS dictionary items, and work packets have been completed and reflect the case studies.

Purpose

The primary purpose of this assessment item is to help you to develop skills in the contents and compilation of WBS, WBS dictionary items and work packets.

The secondary purpose of this assignment is to give you the opportunity to consider the role of WBS, WBS dictionary items and work packets within a project life cycle.

The assignment will also give you the opportunity to enhance your analysis and written communication skills; particularly in the areas of structured assignment writing.

Structure

Your submission should be made using the supplied templates. You should complete all of the required parts in as complete manner as you deem appropriate. The instruction sections in the templates that state they should be deleted must be deleted.Weighting20%Assessment Criteria Your assignment will be assessed on the extent and quality to which it meets each of the following criteria.

1 A complete WBS is supplied? (15%)
2 A complete WBS dictionary is supplied? (15%)
3 A complete set of work packets is supplied? (20%)
4 A complete WBS is an accurate reflection of the case study? (10%)
5 A complete WBS dictionary is an accurate reflection of the case study? (10%)
6 A complete set of work packets is an accurate reflection of the case study? (10%)
7 Appropriate and well structured, concise and clear expression of project management requirements in response to the assessment task? (10%)
8 Clarity of expression, grammar and spelling? (10%)Referencing StyleHarvard (author-date)

Reference no: EM131041202

Questions Cloud

Potential losses and profits from the position : What should you do and verify the potential losses and profits from the position.
Calculate the maximum power delivered to the inductor : A coil of wire having negligible resistance and an inductance of 0.248 henry is connected to a 117-volt 50-cycle source.
How have issues of diversity influenced social change : How have issues of diversity influenced social change? In other words, how have problems associated with diversity necessitated or encouraged some sort of change in society?
What bones protect the spinal cord : What bones protect the spinal cord? Small canals that connect osteocytes in their lacunae to the central canal are known as ________. Cube-shaped bones that contain mostly spongy bone are called ________ bones.
Work breakdown structures : Assessment TitleWork breakdownTask Description Assignment Overview. This assessment item requires you to consider:-
What is the ping command used for and how does it work : What is the ping command used for and how does it work and what is the difference between IPSec, SSL, and GRE VPNs?
Earnings per share and return on equity : What is the expected earnings per share (EPS) and return on equity (ROE) at next year's expected level of EBIT if the firm remains 100% equity financed?
Problem regarding the triangle arbitrage : The exchange rates in New York for $1 are C$1.2675 and £0.6882. A dealer is offering the following quote: C$1 will buy £0.8722. What is the profit you can earn on $19,632 using triangle arbitrage?
Which impairs the exchange of materials within the tissues : Excess accumulation of fluid, which impairs the exchange of materials within the tissues, is called ________. The ________ duct drains lymph from the right arm and the right side of the head and thorax.

Reviews

Write a Review

Accounting Basics Questions & Answers

  How much control does fed have over this longer real rate

Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest.   How much control does the Fed have over this longer real rate?

  Coures:- fundamental accounting principles

Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.

  Accounting problems

Accounting problems,  Draw a detailed timeline incorporating the dividends, calculate    the exact Payback Period  b)   the discounted Payback Period. the IRR,  the NPV, the Profitability Index.

  Write a report on internal controls

Write a report on Internal Controls

  Prepare the bank reconciliation for company

Prepare the bank reconciliation for company.

  Cost-benefit analysis

Create a cost-benefit analysis to evaluate the project

  Theory of interest

Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR

  Liquidity and profitability

Distinguish between liquidity and profitability.

  What is the expected risk premium on the portfolio

Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.

  Simple interest and compound interest

Simple Interest, Compound interest, discount rate, force of interest, AV, PV

  Capm and venture capital

CAPM and Venture Capital

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd