Reference no: EM13120922
Choose a project from your organisation. Where you do not have a current project either use a project you have worked on previously or create a project.
Senior Management have authorised the initiation of the project and you have been appointed as the Project Manager. Your Project Board have asked for a Project Plan so that it can be used as a baseline against which to monitor project progress and cost stage by stage.
For your chosen project you must provide:
1) A project overview giving a brief background to the project, the project objectives, the project scope and exclusions, the project deliverables and desired outcomes and project constraints
2) A Work Breakdown Structure which is broken down by sub-activity to the level of work packages
3) For one work package chosen from (2), you should provide an estimate of resources using appropriate techniques
4) For one work package chosen from (2), you should provide a schedule for each activity using appropriate techniques
5) For one work package chosen from (2), you should provide a budget detailing the costs of associated with delivering this work package
6) For one work package chosen from (2), provide a risk register using risk identification techniques, risk assessment techniques , filtering techniques
7) For one risk chosen from (6), develop a risk mitigation action plan
You should use the same work package in sections 3, 4, 5 and 6.
Consider the word limits and assessment requirements before choosing the complexity level of the project.
Projects can be concealed to protect the confidentiality of your organisation - you will not be penalised where specific confidential details are withheld, however areas of restricted information should be highlighted where appropriate.
|
Estimate a baseline level for the metrics
: At most times the metrics are low but they rise drastically when a child feels stress. The researcher wants to estimate a baseline level for the metrics.
|
|
Geometric sequence-population growth
: A population that starts at 100 and doubles in growth every eight years: The expression would give the population t years after the growth starts.
|
|
What is the probability that two groups of students
: A random sample of size 25 is taken from a normal population having a mean of 80 and a standard deviation of 5. A second random sample of size 36 is taken from a different normal population having a mean of 75 and a standard deviation of 3.
|
|
Conclude half of hispanic female drivers wear seat belts
: 68 of these drivers were wearing seat belts. We wish to find if these data give good reason to conclude that more than half of Hispanic female drivers in Boston wear seat belts.
|
|
Work breakdown structure
: Choose a project from your organisation. Where you do not have a current project either use a project you have worked on previously or create a project.
|
|
Review and aging of accounts receivable
: As a result of a review and aging of accounts receivable, it has been determined that the Allowance for Doubtful Accounts should show a balance of $2,100 at December 31,2010.
|
|
Computer this machines payback period
: Elite Company is planning to add a new product to its line. To manufacture this product, the company needs to buy a new machine at a $300,000 cost with an expected 4 year life and a $20,000 salvage value.
|
|
Graphing systems of inequalities
: Solve the following system of linear inequalities by graphing.
|
|
Why does a defined benefit plan present far more
: Distinguish between a defined benefit plan and a defined contribution plan. Why does a defined benefit plan present far more complex accounting issues than a defined contribution plan?
|