Reference no: EM131156696
Assignment 3: VoIP Part 1 (Work Breakdown Structure)
This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.
Overview
As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company's campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.
Deliverable 1: Summary (MS Word or open source equivalent)
1. Write a one to two (1-2) page summary document in which you:
a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).
b. Define a work breakdown structure and describe the methodology behind constructing one.
Deliverable 2: WBS (MS Project or open source equivalent)
2. Use Microsoft Project to create a WBS which:
a. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.
b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.
c. Contains Work Breakdown Structure Code for each task.
d. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.
Deliverable one (1) of your assignment must follow these formatting requirements:
- Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format.
- Include a cover page containing the title of the assignment. The cover page and the reference page are not included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
- Identify how project management improves the success of information technology projects.
- Explain the relationship of the scope of a project to the work breakdown structure.
- Use technology and information resources to research issues in IT project management.
- Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.
Independent student reading and research
: The Global Security Policy Assignment Preparation: Activities include independent student reading and research. Assignment: Write a 3-to 4-page paper describing the some of the issues you might face when maintaining security in a company that has o..
|
What is your process for assessing the risks
: How will you manage the group? What is your process for assessing the risks? What techniques will you use
|
What is the temperature inside the cooker
: An eight-liter pressure cooker contains a mixture of steam and liquid water at 2 bar. Through a level indicator we can see that the liquid occupies 25% of the volume inside the cooker.
|
Compare and contrast an nap and a mae
: Compare and contrast an NAP and a MAE. Name a few examples of each please?
|
Work breakdown structure
: This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.
|
How the economics of four different industries is changing
: Discuss how the economics of four different industries is changing, and how these changes will alter how firms within these industries relate to their customers. Be sure to include factors such as technology, competition, and input prices in your ana..
|
What is positive correlation means
: According to the results of Durkheim's suicide study, which of the following statements is not true? A sociologist is designing a study to see if poverty causes crime. In this study poverty is the __________ variable.
|
List how each type of property is treated under the law
: List how each type of property is treated under the law. Explain why it is in the best interest of society to treat these types of property the same or differently
|
Journalize the issuance of the stock
: On May 10, Paige Corporation issues 2,500 shares of $5 par value common stock for cash at $13 per share.Journalize the issuance of the stock.
|