Witness modelling and process improvement

Assignment Help Mechanical Engineering
Reference no: EM132877667

MOD002610 Modelling & Simulation for Operations Management - Anglia Ruskin University

Assignment case study for Witness modelling and process improvement. Drive shaft manufacture

You have been employed as a member of a production improvement task force for a Drive Shaft Manufacturing Company (DSMC). DSMC has been experiencing a severe backlog in sales orders due to antiquated machinery and poor production planning. The Company has just received an unprecedented contract to supply 450 drive shafts by the process given below. However, finances at present are tight and only £250,000 can be invested. Some of the order can be sub-contracted. Your task is to determine the maximum capacity of the current production line after the investment of the £250,000 hence how many parts must be made by the sub-contractor. The cost list of potential capital improvements is given on next page.

The current output of the line averages 180 shafts on the two 38-hour shift system.

Process:

The drive shaft manufacture starts with a bar of 0.3 metres long that is cut into three parts (blocks). The operations are as follows (one machine at each operation unless stated otherwise):

1. The bar arrives based on vendor's supply schedule in lots of 3, every 30 minutes. The bar stock buffer can hold only 10 bars.

2. In the Saw machine, the time to cut the bar into 3 blocks is 6 minutes. Blade A is replaced every 40 operation and blade B every 30 operations. Set-up time is uniformly distributed between 10 and 15 minutes. Time between failures is NEGEXP with mean of 100, and the repair time follows triangular distribution with min 10, mode 25 and max 30. An operator is required to run this machine.

3. After sawing the blocks go to a Fixed conveyor with index time = 0.25 min, length 20 parts.

4. Once sawed the blocks must be coated for protection. The Coating machine takes 6 parts per cycle and has a cycle time of 60 minutes. Every 10 cycles, the machine is set-up for 5 minutes.

5. Once coated, the blocks are placed in a staging buffer of capacity 10 part, adjacent to the Inspector.

6. The Inspector draws from the staging area one block at a time and checks the quality of the block's coating. The cycle time = 20 min, set-up = 1min per part. If the coating is bad, the Inspector puts the rejected block into a Rework buffer of capacity 10. The reject rate is 20%, and rejects are returned to be recoated.

7. Parts are cured on an individual basis on a chain conveyor (Hardener) of capacity 10 parts through a furnace, a process on a first in first out basis. Heat-treat time is 60 min.

8. The hardened parts go for Gear cutting: cycle time 2 minutes + 1 minute load and unload that is manual, 2 machines, tool change every 100 parts for 10 minutes. Breakdowns mean time to failure 5000 minutes NegExp, repair time normal mean 80 minutes σ = 10. One operator runs two machines and changes cutter.

9. Four parts are Loaded into a special fixture in 4 minutes before entering for grinding; 10 fixtures are available in the system and are stored in a Fixture buffer if not used.

10. The 4 parts and the fixture are loaded to the Grinders (2 machines): cycle times M/c 1 = 35 min, M/c 2 = 40 min; Time between failures is normal distribution with mean = 75 min, SD = 15. The repair time is NEGEXP of mean 15 min and is repaired by the Saw operator.

11. Once ground, the fixture is Unloaded in 4 minutes. The fixture returns to the Fixture buffer and the parts go to two buffers of capacity 10 parts each.

12. The parts are then cleaned in the Wash machine, a multi stage machine with 5 stations, 1 part per station, cycle time = 15. Time between failures NEGEXP of mean 120 min, the repair follows Erlang distribution with mean = 20 min, K = 3. The machine is set-up every 100 operations, time 5 min. Set-up and repair are carried out by the Saw operator.

13. The Plating process follows and takes 36 parts per cycle, cycle time 36 minutes, buffers on machine 72 parts both before and after process. Due to chemical change on Monday morning, 4 hours are lost. An operator is required.

14. The parts are then washed with a Wash machine identical to 12.

15. The finished parts are Packed in Pack cycle time of 1.25 min. Packed into flat pack boxes one drive shaft per box. Boxes arrive in batches of 1000, frequency of deliveries to be determined by model. One operator required.

16. The boxes are finally shipped.

Attachment:- Assignment case study.rar

Reference no: EM132877667

Questions Cloud

Determine optimal capital structure : How would a financial manager determine optimal capital structure? How this would fit in with the company's capital expenditures, growth plans and operating
How hr managers can develop a high level of professionalism : How HR managers can develop a high level of professionalism and competency in IHRM to meet these challenges - rite a 2-page paper that synthesizes your research
Work-life balance family support commute productivity : Work-life balance Family support Commute Productivity Technology Social interaction Organizational culture Pay Collaboration At least one APA style reference
Building a simple mobile web responsive application : You are tasked with building a simple mobile web responsive application that will display Vehicle Registration information for a user.
Witness modelling and process improvement : Witness modelling and process improvement - determine the maximum capacity of the current production line after the investment of the £250,000
Incorporating the pest analysis tool : If you were the chief executive officer (CEO) of your company, how would you feel about incorporating the PEST (political, economic, social, and technological)
Factors influencing productivity positively for employees : Although working from home practice has become more common in many countries due to various benefits, organizations still have reluctancy to adopt this form
Prepare Mr Johnson Ferrarmo personal tax return : Dentist visits (June 15, 2020) $725. Prepare Mr. Johnson Ferrarmo's T1 personal tax return for 2020 with minimum taxes payable
Calculate the present value of the expected cash flow : 3. When valuing the shares of the company, I calculate the present value of the expected cash flow to shareholders and I add to the results obtained cash

Reviews

Write a Review

Mechanical Engineering Questions & Answers

  Package design

Package Design Brief: Assume you are the packaging engineer for a large consumer products company. In this company, the Packaging Design Briefs are initiated by the marketing group and forwarded to the Package Engineering group.

  Mechanical engineering questions

Define dynamic viscosity, Determine the centroid, Pressure due to the height of liquid, Advantage of changing the liquid, Calculate the total moment about the hinge of the seal gate.

  Automatic control

DOF system and Find the differential equation describing the system

  Write a paper on boyle''s law

Write a paper on Boyle's law and describe Compression and Combustion stroke . Also explain Charles's law and illustrate SI engine and CI engine.

  Verify the law for parallelogram of forces

To Verify the law for parallelogram of forces, law for triangle of forces and law of polygon of forces. These laws are very useful to calculate unknown forces in very short time.

  Discharge pressure of the compressor

What is the discharge revised discharge pressure of the compressor.

  The Case for Global Accounting Standards

The role of IFRS in both developing and developed capital markets.

  Wind turbine

Wind turbines are becoming more and more common as a method of energy production, wind turbines by their very nature are dynamic and are subject to and create their own internal and external kinematics and kinetics.

  Advanced design methodologies

8 x product engineering and design review (week 2 – 12), ~3 pages per item which must contain a brief description of the product then delve into concepts such as materials selection, manufacturing methods, life cycle analysis, recyclability and overa..

  Design of absorption column and the cooler

Design of absorption column and the cooler. Process design of other units should be completed along with pipe sizes.

  Determine the maximum total bending moment

Determine maximum total bending moment (static plus dynamic) of the beam under steady-state conditions.

  Force of the water on the gate

Determine the magnitude of the horizontal and vertical components of the force of the water on the gate.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd