Why its necessary to require conditions-sand cement ratio

Assignment Help Civil Engineering
Reference no: EM13305232

1. why is it important to test the specimens on (i.e. apply the load to) one of the sides that was cast against the polyethylene mold? What would be the likely result if the upper or free face of the specimen was used as one of the loaded faces during the compression test?

2. Compare the test results for the different curing conditions. Were the results as expected when compared to the standard curing conditions?

3. Refer to the results of the 7-day compression test using the standard curing conditions. Does your cement meet the specification requirements as stated in- table 2?

4. Why is it necessary to require such conditions-sand cement ratio, w/c ratio and type of sand? A graded sand is specified for use in the mortar cube test. What would be the likely results if a one-sized sand was used instead of a graded sand? Would the strength of the mortar be increased or decreased is a one-sized sand was used?

5. A standard tamping procedure is specified for preparing the specimens. Why is this necessary? If the cement was not consolidated in accordance with the scheme specified in the ASTM standard would the strength of the mortar be likely decreased or increased? Hint: consider how poor consolidation - voids trapped in the mortar - might affect strength.

6. Is the degree of mixing important in determining the strength of the mortar? Explain what might happen if care was not taken to ensure that the cement, sand, and water are thoroughly blended.

7. The ASTM standard specifies the rate at which the load is applied to the test specimens. Would you expect the strength of the specimens to increase or decrease if the load was applied rapidly? If the load was applied very slowly?

Reference no: EM13305232

Questions Cloud

Find what is the pressure on the soil if theta is 45 degrees : A pipe is to be installed under the ground on a bed of aggregate 6 in. thick. The entire weight on the aggregate from pipe and soil above the pipe is 1800 lbs. per linear foot of pipe. What is the pressure on the soil if theta is 45 degrees
Compute the wavelength of the light that falls on the slits : Coherent light from a sodium-vapor lamp is passed through a filter that blocks everything except for light of a single wavelength. compute the wavelength of the light that falls on the slits
Calculate the compacted cubic yards per hour over 10-inch : Calculate the compacted cubic yards per hour if a compactor with a 5-ft drum width travels at 3 mph over a 10-in. lift of aggregate base course with 4 passes required to meet density specifications under average operating conditions.
Obtain the self-induced emf in the solenoid : A 0.10 m long solenoid has a radius of 0.05 m and 15000 turns. The current in the solenoid changes at a rate of 6.0 A/s. Determine the self-induced emf in the solenoid
Why its necessary to require conditions-sand cement ratio : Why is it necessary to require such conditions-sand cement ratio, w/c ratio and type of sand. A graded sand is specified for use in the mortar cube test. What would be the likely results if a one-sized sand was used instead of a graded sand.
What is the cost of common equity for whitewall : If Whitewall is expected to increase its annual dividend by 3.90 percent per year into the foreseeable future and the current price of Whitewall's common shares is $13.32, then what is the cost of common equity for Whitewall?
What is the percent difference in net working capital : Suppose marking-to-market reveals that the market value of the firm's inventory is 61 percent below its book value and its receivables are 71 percent below its book value. The market value of its current liabilities is identical to the book value.
What would you push to see happen in the derivative market : Given what you currently konw of derivatives...If you were a regulatory what would you push to see happen in the derivative market?
What minimum force in the pole : A 0.873-kg block is held up against a ceiling by a pole that makes an angle of 21 degree with respect to the vertical; What minimum force in the pole is necessary to get the block moving

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd