Why is the ‘time value of money' important for the evaluation of engineering projects? Provide at least one practical example to support your view (max 2 pages)
The probability that a new car battery functions for over 10,000 miles is .8, the probability that it functions for over 20,000 miles is .4, and the probability that it functions over 30,000 miles is .1. If a new battery is still working after 10,..
Determine the minimum necessary clearance height of the overpass and the resultant elevation of the bottom of the overpass over the PVI. (ignore the cross-sectional width of the overpass)
What is the design storage and water surface elevation at the peak outflow rate and estimate the long-term average reduction (EPA, 1986) in particulates under dynamic conditions.
Determine the horizontal reaction that is developed on the gate at C.
The total dissolved inorganic carbon (TIC) of a sample of groundwater is 8.33 mM. The temperature of the aquifer is 15C, the pH is 7.5, and the ionic strength is 0.05 M. What is the H2CO3, HCO3-, CO3 2-, and the partial pressure of CO2? [Use activ..
What are the effects of water pollution on the components of the hydrologic cycle?
The forces F1, F2, and F3, all of which act on point A of the bracket, arespecified in three different ways. Determine the x and y scalar components of each of the three forces.
Land is extremely valuable in this area therefore to win this job you need to consider innovative approach to reduce the waste areas
The casting has a mass of 3 Mg. Suspended in a vertical position and initially at rest, it is given an upward speed of V mm/s in 0.3s using a crane hook H. Determine the tension in cables AC and AB during this time interval if the acceleration is ..
Compute the ratio of the nominal flexural strength of the beam to the maximum service load moment, and compare your findings to the ACI load factors and strength reduction factor.
Determine the minimum distance from the diversion that a road sign should be located informing drivers of the temporary change on the highway. The letter height on the road sign is 5 inches.
The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd