Why does attempt at project partnering appear to be failing

Assignment Help Project Management
Reference no: EM133850861 , Length: Words Count:2000

Assignment:

Carefully read the case and consider its context in relation to readings and concepts learned in this course. The case includes situational information, which should be used to perform the required analysis and make the appropriate recommendations. You are required to address all of the following questions within your case analysis.

Submission Instructions

  • Read the appropriate materials (1500 to 2000 words, +/- 10%) case analysis report
  • Each report should include an introduction and conclusion.
  • Follow APA style in both organization and referencing.

Case Study: The Accounting Software Installation Project

Description

Sitting in her office, Karin Chung is reviewing the past four months of the large corporate accounting software installation project she has been managing. Everything seemed so well planned before the project started. Each company division had a task force that provided input into the proposed installation along with potential problems. All the different divisions had been trained and briefed on exactly how their division would interface and use the forthcoming accounting software. All six contractors, which included one of the Big Five consulting companies, assisted in developing the work breakdown structure-costs, specifications, time.

Karin hired a consultant to conduct a one-day "partnering" workshop attended by the major accounting heads, a member of each task force group, and key representatives from each of the contractors. During the workshop, several different team-building exercises were used to illustrate the importance of collaboration and effective communication. Everyone laughed when Karin fell into an imaginary acid pit during a human bridge-building exercise. The workshop ended on an upbeat note with everyone signing a partnering charter that expressed their commitment to working together as partners to complete the project.

TWO MONTHS LATER

One task force member came to Karin to complain that the contractor dealing with billing would not listen to his concerns about problems that could occur in the Virginia division when billings are consolidated. The contractor had told him, the task force member, that he had bigger problems than consolidation of billing in the Virginia division. Karin replied, "You can settle the problem with the contractor. Go to him and explain how serious your problem is and that it will have to be settled before the project is completed. "Later in the week in the lunchroom she overheard one consulting contractor bad-mouthing the work of another- "never on time, interface coding not tested." In the hallway the same day an accounting department supervisor told her that tests showed the new software will never be compatible with the Georgia division's accounting practices. While concerned, Karin considered these problems typical of the kind she had encountered on other smaller software projects.

FOUR MONTHS LATER

The project seemed to be falling apart. What happened to the positive attitude fostered at the team-building workshop? One contractor wrote a formal letter complaining that another contractor was sitting on a coding decision that was delaying their work. The letter went on: "We cannot be held responsible or liable for delays caused by others." The project was already two months behind, so problems were becoming very real and serious. Karin finally decided to call a meeting of all parties to the project and partnering agreement. She began by asking for problems people were encountering while working on the project. Although participants were reluctant to be first for fear of being perceived as a complainer, it was not long before accusations and tempers flared out of control. It was always some group complaining about another group.

Several participants complained that others were sitting on decisions that resulted in their work being held up. One consultant said, "It is impossible to tell who's in charge of what." Another participant complained that although the group met separately on small problems, it never met as a total group to assess new risk situations that developed. Karin felt the meeting had degenerated into an unrecoverable situation. Commitment to the project and partnering appeared to be waning. She quickly decided to stop the meeting and cool things down.

She spoke to the project stakeholders: "It is clear that we have some serious problems, and the project is in jeopardy. The project must get back on track, and the backbiting must stop. I want each of us to come to a meeting Friday morning with concrete suggestions of what it will take to get the project back on track and specific actions of how we can make it happen. We need to recognize our mutual interdependence and bring our relationships with each other back to a win/win environment. When we do get things back on track, we need to figure out how to stay on track."

Case Questions

  1. Why does this attempt at project partnering appear to be failing?
  2. If you were Karin, what actions would you take to get this project back on track?
  3. To what extent do you think there was a clear scope statement and work breakdown structure for this project. Based on the information that is available in this case, draft your own scope statement and work breakdown structure for this project.

Reference no: EM133850861

Questions Cloud

Which activity occurs during the management review : Which activity occurs during the management review and problem solving meeting at the end of the first day of PI Planning?
Who do you think are the stakeholders : Consider your campus bookstore. Who do you think are the stakeholders? What do you think are its critical success factors?
Are these personal crises or work-related problems : Are these personal crises or work-related problems? Are other employees are having the same issues?
Develop a competing stem program : How would you suggest Bayside deal with concerns regarding current employees leaving Bayside to work at competing schools to develop a competing STEM program?
Why does attempt at project partnering appear to be failing : Why does this attempt at project partnering appear to be failing? If you were Karin, what actions would you take to get this project back on track?
Write a conclusion based on emerging trends : Write a conclusion based on emerging trends - transformational leadership, gender barrier in leadership and use of technology in communication.
Would you build upon existing system-completely overhaul it : Explain how you would approach the redesign. Would you build upon the existing system or completely overhaul it?
Define the strategic planning process : Define the strategic planning process and benefits of the process. What are the steps of strategic planning?
Exploring machine learning strategies to guide : As a quantitative analyst in a financial firm, you are exploring machine learning strategies to guide trading decisions.

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd