Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Question: As chief cargo-door engineer for a major aircraft manufacturer, you are responsible for redesigning the door to prevent further accidents. In order to have the new cargo doors installed as soon as possible, you are considering whether to redesign the door prior to knowing the official findings of the accident investigation team. You do know that the possible causes of failure have been reduced to either a failure in the latch or a failure in the electric motors that close the door. You estimate that there is a 60% probability that a latch failure will be identified as the cause of the accident and a 35% probability that the motors will be blamed. The four options you are considering are (a) redesign the latch now at a cost of $35,000; (b) redesign the motor now at a cost of $30,000; (c) redesign both now at a cost of $25,000; and (d) wait for the results of the accident investigation before deciding which component to redesign.
If you choose either (a) or (b) and the component which you did not redesign is determined to be the cause of failure, it will cost you an additional $30,000 for an accelerated redesign of the latch and an additional $50,000 for an accelerated redesign of the motor. Also, if you choose (d), your design costs are thus associated with an accelerated schedule. Which option has the lowest expected cost?
Create a project schedule and align resources, Analyze project schedule and resource allocation
Write a report on Managerial Roles and Gap Analysis
Questionaire on Project Management
Describe the market growth rate for product and service.
Design an online system for the human resources department to manage available job positions.
How does a project risk management approach pro-vide an early warning signal for impending problems or issues
Calculate the payoff and the profits for investments
Describe the features or characteristics of your product or service.
Write paper on Inventory Management System.
Analysis of the overall project risk
Evaluate the usefulness of ROCE
Distribution strategy and project management
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd