BOEING 787 DREAMLINER

The first Boeing 787 Dreamliner was delivered to Japan's ANA in the third quarter of 2011, more than three years after the initial planned delivery date. Its complicated, unique design (including a one-piece fuselage that eliminated the need for 1,500 aluminum sheets and 50,000 fasteners and reduced the resulting weight of the plane proportionally), promise of 20% increase in fuel economy and reduction in ‘out of service' maintenance time, and problems with early testing of the new design all contributed to the giant project's troubles.

Delivery of Boeing's 787 Dreamliner project was delayed, in part, because of their global supply chain network, which was touted to reduce cost and development time. In reality, this turned out to be a major cause for problems. Boeing decided to change the rules of the way large passenger aircraft were developed through its Dreamliner program; rather than simply relying on technological know-how, it decided to use collaboration as a competitive tool embedded into a new global supply chain process.

With the Dreamliner project, Boeing not only attempted to create a new aircraft through the innovative design and new material, but it also radically changed the production process. It built an incredibly complex supply chain involving over fifty partners scattered in 103 locations all over the world. The goal was to reduce the financial risks involved in a $10 billion-plus project for designing and developing a new aircraft and reduce the new product development cycle time. It tapped expertise of various firms in different areas such as composite materials, aerodynamics, and IT infrastructure to create a network in which partners' skills complement each other.

This changed the basis of competition to skill set rather than the traditional basis of low cost. In addition, this was the first time Boeing had outsourced the production on the two most critical parts of the plane- the wings and the fuselage. The first sign of problems showed up just six months into the trial production. Engineers discovered unexpected bubbles in the skin of the fuselage during baking of the composite material. This delayed the project a month. Boeing officials insisted that they made up the time and all things were under control.

But next to fail was the test version of the nose section. This time a problem was found in the software programs, which were designed by various manufacturers. They failed to communicate with each other, leading to a breakdown in the integrated supply chain. Then problems popped up in the integration of electronics. The Dreamliner program entered the danger zone when Boeing declared that it was having trouble getting enough permanent titanium fasteners to hold together various parts of the aircraft.

The global supply network did not integrate well for Boeing and left it highly dependent on a few suppliers. This case clearly underscores the hazards in relying on an extensive supply chain in which information exchange problems may create extended problems and seriously compromise a company's ability to carry out business as planned. Creating a radically different process can mean encountering unexpected problems.

In some cases, it would put a company so far behind their competition that they were doomed to fail. However, in this case, the major competitor to the Dreamliner, the Airbus 380 program, was also using a global supply-chain model, and its program was delayed by a couple of years. The result for Boeing was a much-anticipated plane with fuel economy and outstanding design that made the wait worth it, but the resulting design, a plane that holds up to 250 passengers, compared to the A380, which has a seating capacity between 525 and 853, was a major compromise.

Discussion Questions

1. Why did Boeing adopt the radical change approach for designing and developing the 787 Dreamliner? What were the risks? In your opinion, was it a good move? Defend your choice.

2. Using the Silo Perspective versus Business Process Perspective, analyze the Dreamliner program.

3. What are your conclusions about the design of the integrated supply chain? Give some specific ideas about what could have been done to integrate it better.

4. If you were the program manager, what would you have done differently to avoid the problems faced by the Dreamliner program?

Reference no: EM131956048

Questions Cloud

Calculate parsleys loss per share for year ended december : Parsley Corporation had 150,000 shares of common stock and 4,000 shares of 9%. Calculate Parsley's loss per share for the year ended December 31, 2016.
What outside factors had to come together for santa cruz : What, in your opinion, was the key factor in Santa Cruz Bicycles' successful process redesign? Why was that factor the key?
What is the spring constant of this scale : What is the spring constant of this scale, in newtons/meter? The spring constant for this spring is __________ N/m.
Compute the cost transferred out to finished goods : Compute the equivalent units of production for each input. Compute cost transferred out to finished goods. Compute the ending work in process inventory balance.
What would you have done differently to avoid the problems : Why did Boeing adopt the radical change approach for designing and developing the 787 Dreamliner? What were the risks?
Charges accelerated and then subject to b-field : (a). A proton is given kinetic energy of 0.200 keV. (i). What potential difference was required to accelerate the proton from rest to 0.200 keV?
Discuss what financial compensation you offer Jocelyn : LST5CCL Company and Commercial Law Assessment. Discuss what assistance/ financial compensation you would offer Jocelyn
Think about a company you know well : Think about a company you know well. What would be an example of IT architecture at that company? An example of the IT infrastructure?
How much of a price change for the portfolio : Citibank has determined that its bond portfolio has a duration of 9.5 years and a prevailing yield to maturity of 4.0 percent.

Reviews

Write a Review

Case Study Questions & Answers

  From the scenario, prioritize the attributes of golds reling

From the scenario, prioritize the attributes of Golds Reling's brand from the brand map presented in the scenario according to the attributes that you believe would be most important to the new tablet's target market. Provide support for your respons..

  Discuss critically infosys current and future strategy

Discuss critically Infosys current and future strategy. What advice would you give Kris Gopalakrishnan and KShop has resulted in information overload among staff. What operational measures would you suggest to overcome such challenges?

  Review tarmac business case for diversity

Review Tarmac's Business Case for Diversity and the Learning Resources. Think about Tarmac's approach to managing diversity and how it relates to organisational behaviour concepts and human resource processes.

  Enron case shared activity

Enron was the first nationwide natural gas pipeline network in the United States. As the company grew, executives shifted the company's primary focus from energy delivery and infrastructure to investing in the stock market.

  Ebay inc internet success or fairy tale

Read the case study "eBay Inc.: Internet Success or Fairy Tale? "and answer the question below,   Use the 2002 financial statement data to replicate the Meyer's report calculations that illustrate the conclusion based on the 2001 data reached in the ..

  Mintendo game girl case study

Which option delivers the maximum profit for the supply chain: Sandra's plan, Bill's plan, or no promotion plan at all? How does the answer change if a discount of $10 must be given to reach the same level of impact that the $5 discount received?

  Splash soft drinks case study

Splash Soft Drinks Inc. (SSD) has recently achieved sales that exceeded its expectations after it introduced a new beverage that was greatly welcomed by their customers. The company is currently considering opening a new plant to which some of the pr..

  Details of the task using tesco plc

Details of the task Using Tesco plc (www.tesco.com) as a case study, prepare a report of no more than 2,500 words that:

  What are the common manifestations of alcoholic cirrhosis

What are the common manifestations of alcoholic cirrhosis? Which of these are secondary to hepatocellular failure? Which are secondary to portal hypertension?

  Judge the extent to which the marketing plan at just us

From the case study, judge the extent to which the marketing plan at Just Us! is outdated. Propose two (2) ways that Just Us! could improve the customer experience and thus sustain future growth.

  Read natasha kingery case and answer the questions

Read the DATA CASE on pages 126-127 about Natasha Kingery who is considering furthering her education and is seeking financial advice. Determine the interest rate she is currently earning on her inheritance by going to Yahoo!

  Identify the relevant facts of the case study

Imagine you are the financial controller of XYZ Ltd a corporation that is a very large donor to HOHO. You have recently become aware that its TV advertising has resulted in the charity violating the 25% expenditure ratio for its charity drive.    Id..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd