Reference no: EM132863123
Question - The controller for BEC Events Inc. uses activity-based-costing and has established the following overhead cost pools and cost drivers.
BEC Events received an order requires 5 trips, 10 tent set-ups, 15 equipment set-ups, 10 inspections, and 40 labor hours.
1. What is the cost driver rate for Equipment set-ups?
2. What is the cost driver rate for Inspections?
3. What is the total overhead assigned to this order?
4. If the controller were to use a single, predetermined overhead rate based on labor hours, what is the rate ($)?
5. If the controller were to use a single, predetermined overhead rate based on labor hours, what would be the total overheadassigned to this order?