Soil is excavated from a borrow to construct an embankment with a net volume of 50,000 cy with 95% of Modified Proctor maximum dry density of 110 pcf with a Modified Proctor optimum water content of 8%. Dry density of soil in borrow 114 pcf. Soil specific gravity 2.35. Water content in borrow 16.5%. What would be the minimum number of truckloads required to transport the soil from the borrow? Each truck holds 8.2 cy of soil with void ratio of 1.12.

Reference no: EM13562664

Questions Cloud

Calculate the wet unit weight in pounds per cubic feet : A gray silty clay (CL) is sampled from a depth of 12.5 feet. The "moist" soil was extruded ffrom a 6-inch high brass liner with an inside diameter of 2.83 inches and weighed 777 grams.
Find the height and the width of the triangular soil bank : A ditch having a cross-sectional area of 50 square feet is being excavated in common earth. The soil’s angle of repose is 35° and its swell is 25%. Find the height and the width of the triangular soil bank that will result from the trench excavation
What is the volume of the required soil excavated : Soil is excavated from a borrow to construct an embankment with a net volume of 50,000 cy. This is performed by compacting 12-in layers of the soil to a dry weight of 110 pcf at a moisture content of 18%.
What is the pulling force in lbs to be applied for one of : Two steel plates were constructed in warm weather. Due to temperature change, a 1/32" hole mismatching occurred. What is the pulling force, in lbs, to be applied for one of the plates to match the two holes The plate length is 3 ft (from the left end..
What would be the minimum number of truckloads required : Soil is excavated from a borrow to construct an embankment with a net volume of 50,000 cy with 95% of Modified Proctor maximum dry density of 110 pcf with a Modified Proctor optimum water content of 8%.
What is the maximum price per ton the company : A company uses a 50% solution of NaOH to maintain the pH of water circulated in one of its furnace exhaust scrubbers.  The cost of the solution is $200 per ton f.o.b. (free-on-board).
In which water is sprayed directly into the exhaust duct : The exhaust from a rotary kiln hazardous waste incinerator must be cooled from 1200 degrees C to 300 degrees C before entering a spray dryer for acid gas removal.
How far in advance of the curve must the sign be located : Drivers must slow down from 65 miles per hour to 55 miles per hour to negotiate a severe curve on a rural highway.  A warning sign for the curve is clearly visible for a distance of 110 feet.
Determine in the rate of carbon 14 : In dating using radiocarbon, the amount of C^14 remaining at the time of measurement is expresed as a percentage of modern carbon.  For example that the 30% modern carbon

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find the max speed of the bicycle

A bicyclist travels on a level path. The frontal area of tje cyclist and the bicycle is 2 ft^2 and the drag coefficient is .8. The specific weight of aire is .075 lb/ft^3

  Negate friction at the gate hinge and the pulley

A 1-m diameter cylindrical mass, M, is connected to a 2-m widerectangular gate. The gate is to open when the water level,h, drops below 2.5 m. Determine the required value forM. Negate friction at the gate hinge and the pulley.

  Determine void ratio and unit dry weight of soil particles

A 110 cm^3 sample of wet soil has a mass of 106 g and a degree saturation of 100%. When oven-dried, the mass is 81 g. Determine the 1) water content, 2) specific gravity, 3) void ratio, and unit dry weight of soil particles.

  Determine the reduction of capillary rise if the contact

Determine the reduction of capillary rise if the contact angle representing the adhesion between water and soilmaterial is increased from 30 degrees to 60degrees.

  Determine the cars velocity and position

A canal cut in rock (n= 0.030 is trapezoidal in section with the bottom width of 6.10m and side slopes of 1 on 1. The allowable average velocity is 0.76 m/s. What slope will produce 5.66 m^3/s

  Explain how to compute the energy input to the motor

Compute the motor size required to pump 28.3 cms through a 3,050 m long, 3.66 m diameter pipeline to an upper reservoir 610 m above the lower reservoir. Use a friction facter of 0.02 and a pump efficiency of 80 percent.

  Provide the velocity distribution for steady flow case

An infinite, long, solid, vertical cylinder of radius R is located in infinite mass of compressible liquid. Provide the velocity distribution for steady flow case

  Describe water surface profiles at various parts of channel

A long wide rectangular channel carries a steady flow rate of 35 m2s-1 (flow per unit width) and passes through an abrupt change in slope from 0.005 (upstream of the change) to 0.003 (downstream).

  What conclusions can be drawn about viability of approach

One accident mitigation procedure is called emergency material transfer, in which the material is transported away from the accident site before it becomes involved. We plan on mitigating a crude oil tank fire scenario by pumping the tank empty in..

  Determine the flow rate

A heat pump operates between 250K and 300K. The cooling rate is 3.6 kW while the work input rate is 1.2 kW. The COP for the heating achieved is? Provide full details of work to receive good rating.

  What is the concentration of the chemical in the water

25 mg chemical Y (log kow = 2.88) is added to a microcosm (i.e., tank) that contains 1 kg soil, 20 L water. Chemical Y has negligible volatility (very low partitioning to air). The soil is mized with water for several days until equilibrium (between ..

  Determine the inlet and exit tempertures and exit quality

A steady flow of refrigerant 134a enters a throttling valve in a refrigeration unit as a satrurated liquid with a pressure of 150 psia. The refrigerant is discharged with a pressure of 40 psia.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd