What volume of water is needed for backwashing plus rinsing

Assignment Help Civil Engineering
Reference no: EM13560338

A rapid sand filter has a loading rate of 8.00 m/h, surface dimension of 10m x 8m, an effective filtration rate of 7.70 m/h, and a production efficiency of 96 percent. A complete filter cycle duration in 52h and the filter rinses for 20 minutes at the start of each cycle.

(a) What flow rate (m^3/s) does the filter handle during production?

(b) What volume of water is needed for backwashing plus rinsing the filter in each filter cycle?

Reference no: EM13560338

Questions Cloud

Analyze the existing business strategies : 1. Analyze the existing business strategies, domestic and global environments, industry, and internal capabilities for both Apple and Samsung. Assess the significant manner in which each company's mission and vision align with the long-terms goals an..
Determine all reactions and draw the shear and moment : Analyze the frame by moment distribution. Determine all reactions and draw the shear and moment diagrams, locating points of inflection and labeling max and min shear and moment values.
New product plan for mm is a success : What will you measure to determine whether or not your new product plan for MM is a success?
The wbfk transport company operates throughout mainland : The WBFK Transport Company operates throughout mainland Australia
What volume of water is needed for backwashing plus rinsing : A rapid sand filter has a loading rate of 8.00 m/h, surface dimension of 10m x 8m, an effective filtration rate of 7.70 m/h, and a production efficiency of 96 percent. A complete filter cycle duration in 52h and the filter rinses for 20 minutes at th..
Introduction to integrated marketing communications : Introduction to Integrated Marketing Communications
What would be the temperature rise of the water as it leaves : A 4 X 8-ft solar collector has water circulating through it at the rate of 1.0 gallon per minute (gpm) while exposed to sunlight with intensity 300 Btu/ft2-hr.
What is the minimum number of filters required by plant : A conventional water treatment plant treats 2.40m^3*s^-1 of river water. The filters in the plant are 8.0x8.0m surface area and operate on the following schedule. A filter is cleaned once in each 24-hr period
Business goals and objectives : Business Goals and Objectives

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd