An electric power plant consumes 2.5 million gallons per day of cooling water. To control bacterial growth (slime), 2.0 mg/L of chlorine (measured as Cl2) is injected into the make-up water fed to the system. If the specific gravity of liquid chlorine is 3.21, what volume of liquid chlorine must be stored in order to maintain a 30-day supply?

If the plant uses sodium hypochlorite instead, what volume of NaOCl will be needed? Assume that the dry density of NaOCl is 1.2 kg/L and that 1 mg/L of dissolved NaOCl is equivalent to 1 mg/L of dissolved Cl2.

Note: 1 gal = 3.78 LYou have a contaminated air stream containing 1000 ppmV of toluene and you decided to incinerate to a DRE of 99.9%. You are using butane as fuel to reach the temperature and consider the lean toluene has no heating value. Determine how much butane would you need to burn 1000 cft of contaminated air steam. Consider no heat loss in the incinarator. (b) Show that presence of toluene does not improve fuel efficiency for any practical purpose.  

Reference no: EM13563746

Questions Cloud

How long will it take to concentrate the solution : 150,000 mol of aqueous phosphoric acid (H3PO4) solution contains 5.00% H3PO4 by moles. The solution is concentrated by adding pure H3PO4 at a rate of 20.0 L/min.
Calculate the pressure and mole fractions in the vapor : Water is used in a heat exchange to cool 5 kg/s of air from 400 C to 200 C. Calculate (a) the minimum mass flux (kg/s) of the water and (b) the quantity of heat transferred (MJ) to the water each second. The water enters at 20 C and leave at 30 C.
Balance the latitudes and departures by using the compass : A four-sided closed field traverse has the following angles. A = 81 degrees 22%u201930%u201D, B = 72 degrees 32%u201930%u201D, C = 89 degrees 39%u201930%u201D, D =116 degrees 23%u201930%u201D.
Determine the maximum velocity that the skier will achieve : A person with a mass of 200kg wearing snow skis is gliding down a long slope at an angle of 20 degrees. Each ski is 200cm long and 5 cm wide. The pressure of the skis on the snow melts a thin layer of water so that a .1mm layer of water exists under ..
What volume of naocl will be needed : If the plant uses sodium hypochlorite instead, what volume of NaOCl will be needed? Assume that the dry density of NaOCl is 1.2 kg/L and that 1 mg/L of dissolved NaOCl is equivalent to 1 mg/L of dissolved Cl2.
Derive an equation that would allow for direct calculation : A closed system of 0.123kg undergoes a frictionless, quasi-static process along the path PV=C from 100kpa to a final state where the volume is twice the initial volume. During the process 8140 N-m of work is done by the system. What is the final spec..
How long would you figure the soil will take to reach : An oil storage area, abandoned 10 years ago, had spilled oil on the ground and saturated the soil at a concentration of perhaps 400 mg/kg of soil. A fast food chain wants to build a restaurant there, and samples the soil for contaminants.
What is the minimum chain length for the application : A motorcycle sprocket on the rear wheel has a diameter of 24 cm, and trhe driver sprocket has a diameter of 4.0 cm. The driver sprocket shaft and rear axle are 60 cm apart. What is the minimum chain length for the application.
Determine the number of truck loads required to obtain : For construction of an embankment, the soil is transported from a borrowed area using a truck which carries 5.5 m^3 of soil at a time, with the following details: For the Borrowed Pit: bulk unit weight= 16 KN/m^3

Reviews

Write a Review

Civil Engineering Questions & Answers

  Solve for dv by dx and v using differential equations

Consider a simply supported beam with a uniformly distributed load q AND a concentrated load P at midspan. Solve for dv/dx and v using differential equations.

  Determine minimum resale price needed to make the challenger

A lumber company that cuts fine woods for cabinetry is evaluating if it should retain the current bleaching system or replace it with the new one. The relevant costs of each system are known or estimated.

  What is the tension in the string from

A 0.4 kg mass m is rotating on a horizontal, frictionless surface, its motion constrained by a massless, inextensible string. The distance from the string's attachment point

  Determine what would be the maximum possible percent

Engineers at the General Electric turbine division are trying to improve an existing adiabatic steam turbine that receives 100 kg/s superheated steam at 10 MPa and 800 oC and after expansion and producing power, the spent steam exits the turbine at 1..

  Determine the allowable moment about the horizontal neutral

Determine the allowable moment about the horizontal neutral axis that a timber beam with nominal size 50 X 100 can resist without exceeding the allowable stress of 10 MPa. The dressed size is 38.1 X 88.9 mm, I = 0.00000223m^4, and S = 0.0000502 m^3.

  Discuss how the nec3 form of contract provides stimulus

Discuss how the NEC3 form of contract provides stimulus to good management and compare and contrast this where possible with other forms of contract.

  Determine whether the discharge of the towns wastewater

The Big Bear town council has asked that you determine whether the discharge of the town's wastewater into the Salmon River will reduce the DO below the state standard of 5.00 mg/L at Little Bear, 5.79 km downstream.

  What percentage area of the basin was contributing runoff

The ordinate of a5-hr unit hydrograph of a basin is determined equal to 300 cfs at atime 4 hours after the beginning of net rainfall. What would be therunoff rate after 4 hours if a storm of uniform intensity

  Structure project design in civil engineering

Land is extremely valuable in this area therefore to win this job you need to consider innovative approach to reduce the waste areas

  How many milligrams of co2 were released to the atmosphere

You open a 16 oz (1 pint) bottle of a carbonated soft drink that has a temperature of 5°C, then you get distracted and forget to drink it. You come back quite some time later and find that it has gone "flat," and that it has gotten warm (20°C).

  The change in length of the cable when the beam is under

A 4-m-long rigid beam is supported by a pinned connection and cable. the beam weighs 2.0 kn and hangs horizontally when unloaded When the beam is not loaded the solid cable is 4.00 m long and has a solid area of 175 mm1

  Find the steady-state concentration of pollution in the lake

A lake with constant volume 10X10^6 m^3 is fed by a pollution-free stream with flow rate 50 m^3/s. A factory dumps 5m^3/s of a neoconservative waste with concentration 100 mg/L into the lake.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd