What transmitter powers are needed at each transmitters

Assignment Help Electrical Engineering
Reference no: EM13227291

Stevens was recently engaged in a project to provide a wireless link for the NY/NJ Port Authority from their location in Jersey City to a off-site backup facility in western NJ, using a station on top of the Howe Center as a relay site for the first link and a tower in West Orange, NJ as a relay site for the second link. One approach considered was to operate the link in the 5 GHz ISM band. Here are some potential parameters for this option:
RF bandwidth: 11 MHz
Jersey City-Hoboken antenna gain: 24 dBi
Path length from Jersey City to Hoboken: 1.4 miles
Howe Center-Jersey City antenna gain: 24 dBi
Howe Center receiver noise figure: 6 dB
Howe Center-West Orange antenna gain: 33 dBi
Path length from Howe Center to West Orange: 12 miles
West Orange to Howe Center antenna gain: 26 dBi (lower due to tower mount)
West Orange receiver noise figure: 6 dB

Assuming a 24 dB link margin is needed to account for fading and loss due to heavy rainfall on the longest link, while 12 dB link margin is sufficient for the shorter link, what transmitter powers are needed at each of the four transmitters (JCHowe,Howe-JC, Howe-WO, WO-Howe)? Since this is a line-of-sight link,assume free space propagation loss.

Reference no: EM13227291

Questions Cloud

What kind of project risks exists : What kind of project risks exists? Why is risk identification important in a project?
Compute the fourier coefficients for the harmonics : Compute the power levels of the 2nd, 3rd, and 4th harmonics relative to the fundamental output signal for the Class C amplifier. compute the Fourier coefficients for the harmonics of the clipped sinusoid that results from the partial conduction an..
What are consolidated sales and cost of goods sold for 2011 : There were no sales from Pot to Skillet.Intra-entity sales had the same markup as sales to outsiders. Pot still had40% of the intra-entity sales as inventory at the end of 2011. What areconsolidated sales and cost of goods sold for 2011?
How does risk differ from uncertainty : What is risk? How does risk differ from uncertainty? How does it impact a business?
What transmitter powers are needed at each transmitters : Assuming a 24 dB link margin is needed to account for fading and loss due to heavy rainfall on the longest link, while 12 dB link margin is sufficient for the shorter link, what transmitter powers are needed at each of the four transmitters
Briefly describe the business and what industry it is in : Briefly describe the business and what industry it is in. Explain what works well and what could be better. If you were the owner(s), what would you change? From a customer perspective, what would you like to see different with the business?
Determine how you would leverage the support provided : determine how you would leverage the support provided by the U.S. Small Business Administration in planning and starting your own business. Provide specific examples to support your response.
Analyze the steps involved in developing a strategic plan : Analyze the steps involved in developing a strategic plan for a company and determine which step is the most difficult to get right. Explain your rationale.
What is the filter attenuation at a frequency : You are designing a PCS base station that operates at 1800 MHz. The receiver is co-located on a tower with UHF police and business radio systems that operate at 450 MHz. Since the the 4th harmonic from the UHF system is directly in the PCS band

Reviews

Write a Review

Electrical Engineering Questions & Answers

  Lithium ion battery technology

The paper includes Lithium ion battery technology with its advantages and disadvantages. The paper discusses about the Lithium air battery in which detailed reactions of Lithium with air including nonaqueous as well as aqueous are given.

  Power transformers and tariffs

Construction of different types of power transformer, significant energy savings

  Paper on orthogonal frequency-division multiplexing

This document is shown a paper on Orthogonal frequency-division multiplexing with advantages, disadvantages and uses.

  Function of the hmi in a scada system

This assignment contains electronics engineering questions like State the commonly found components of a SCADA (Supervisory control and data acquisition) system. and decribe the function of the HMI in a SCADA system.

  Resultant waveform of the odd harmonic series

Prepare an Excel graph showing the individual components and summated resultant waveform of the odd harmonic series resulting in an approximate square wave.

  Explain scada system

Explain the function of the HMI in a SCADA system.

  Design a 2-digit 24 second shot-clock

Design a 2-digit 24 second "shot-clock" countdown timer with pushbutton controller.

  Model a discrete-time system

To understand di erent signal models To be able to model a discrete-time system and design simple signal processing algorithms.

  Draw a relay construction diagram

Draw a relay construction diagram and briefly explain the operation of a relay.

  Frequency division multiplexing

Write a short technical report on Frequency Division Multiplexing

  Impact of electron energy

Briefly discuss the impact of electron energy, electron current and target on the Bremsstrahlung generated.

  Traffic light controller

The schematic of the traffic light controller

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd