What total load will steel shore be able to carry

Assignment Help Other Engineering
Reference no: EM131043997

Design of Temporary Structures Assignment 1-

Problem No. 1 - What total load will a AS 550 steel shore be able to carry if the outside diameter is 2.5 inches and a wall thickness of 0.154 inches? The unsupported length of the shore is 10 feet. Solve for both ASD and LRFD criteria. (Assume Fy = 50,000 psi and E = 29000)

Problem No. 2 - Assuming that the manufacturer's specification for the shore in Problem No. 1 is 9400 pounds and all other criteria (i.e., OD and ID) are the same, and assuming a factor of safety of 3, what is the actual strength of the steel.

Problem No. 3 - Referring to sample Problem 8.4 on page 8-7, if the depth of the slab is increased to 12 inches, is this still an acceptable solution?

Problem No. 4 - Referring to sample Problem 8.4 on page 8-7, if the depth of the slab is increased to 12 inches and the shoring frames are increased to 6 feet in width, is this still an acceptable solution?

Assignment 2-

Problem Statement: Here's a little problem that has been sitting on my desk. The East Wall of the Elizabeth River is beginning to fail and needs to be replaced. The masonry wall (the East Wall) has deteriorated and is to be replaced with the concrete wall that is shown on the attached. As part of this project, the low flow channel (the half pipe in the middle of the channel) is to be replaced with a 36" RCP that will be basically cut in two and used as the low flow channel. The 6 inch thick concrete channel on the east side is to be replaced as well as the wall. The section is 500 feet long. Therefore, your assignment is:

1. Design the formwork for the East Wall. A control joint is to be placed every 25 feet. The construction of the wall will require 2 pours; one for the foundation of the wall with a key way and a second pour for the vertical section of the wall. The forms will be wood (Doug Fir) and may be reused if you wish. You will need designs for both sections. You may assume that the existing wall has been removed and that you have unlimited access to the both sides of the wall (i.e., the channel side and the road side) and are not responsible for excavation or backfill.

2. Provide a narrative for your construction sequence for building this project. This should include the order of construction, how you will do the entire project (including the channel and the low flow channel) and how you expect to construct the entire project. You have 40 working days to complete the entire project. A schedule summarizing the construction sequence for the complete project should be attached. You may assume a S day week and 40 hours per week. Also, you may assume no weather delays. The project will be constructed during June and July.

3. Provide a set of plans for your formwork. These plans should be done in AutoCAD and must be your original work. You may not use a manufacturer's drawing that you have downloaded. Also, the plans should be done in a professional manner as though were supplying these as a submittal to the Engineer.

Attachment:- Assignment.rar

Reference no: EM131043997

Questions Cloud

Compare the cost of the truck to the cash flow records : Explain how Stephanie should convince her mother that it is inappropriate to call the bank manager and his wife for assistance in getting the loan approval?
Formulate a lp model for problem : Formulate a LP model for this problem. Show your answer in below. Implement your model in a spreadsheet and solve it. Submit your answer along with the spreadsheet which indicating the optimal solution. In your own words, what's your recommendation ..
Following trig function indicatng range and period : GRAPHS: Sketch the following trig function indicatng range and period T= 2π/freq
Describe the product or service offering : Evaluate the potential growth rate. Look for information on similar products or services to come up with a growth rate over three years; this may be adjusted in later revisions.
What total load will steel shore be able to carry : What total load will a AS 550 steel shore be able to carry if the outside diameter is 2.5 inches and a wall thickness of 0.154 inches
Comprehensive essay to a group of business people : Because price has such a profound impact on a firm's success, finding the right pricing strategy is crucial. Assume you are a marketing consultant write a comprehensive essay to a group of business people in the US Virgin Islands interested in kno..
Calculate the pv of this project using real cash flows : Calculate the PV of this project using nominal cash flows. You should get the same present value. (Hint: This is a growing annuity. Either look up a formula for that, or recognise the growing annuity is the difference between two growing perpetuti..
Introduction to business consulting : Answer the following question with not less than 100 words. References should be provided. 1. The following is a quote from the textbook "You can be very profitable and still go out of business".  Do you agree with this quote?  Why or why not?  Ex..
How does change potentially impact a project : How does change potentially impact a project? Describe the role of the Project Manager in controlling change?Provide examples where you have experienced scope creep on a project you worked on or managed.

Reviews

Write a Review

Other Engineering Questions & Answers

  Point of application on plate

The point of application on the plate of the smallest force F that is equivalent to the given system, The magnitude and direction of F.

  The following describes a mineral deposit

The following describes a mineral deposit. For the deposit the candidate is required to select a suitable mining method for the deposit based on the information given and to describe the mining system in detail. The candidate should include in their ..

  What bias current iq will serve to limit the variation

A class AB output stage, such as that in Fig, drives a load resistance RL of 100Ω. What bias current IQ will serve to limit the variation in the small-signal voltage gain to 5% as iL changes from 0 to 50 mA?

  Determine the average time in system

Determine the average time in system, number of passengers completing check-in, and the time-average length of the check-in queue. Put a text box in your model with the numerical results requested.

  Determine the largest number of crates

The 3-Mg rear-wheel-drive skid loader has a center of mass at G. Determine the largest number of crates that can be pushed by the loader if each crate has a mass of 500 kg.

  What technology would you miss the most

Have you ever thought what it would be like to be without today's current technology? What technology would you miss the most? What would you do to replace it if "new tech" was not an option?

  Design a mine ventilation network

Draw in a decline from the surface (at -100) with nodes placed at every sub level to allow the break-offs to be established. Two ways are recommended to draw horizontal airways between levels.

  Scale on the vertical axis

A small solid ball is released from rest while fully submerged in a liquid and then its kinetic energy is measured when it has moved 4.0 cm in the liquid. Figure gives the results after many liquids are used: The kinetic energy K is plotted versus..

  Design a coal overburden throw

Design a coal overburden throw/cast blast for the situation - Blast length 900 m

  Demonstrate knowledge of it structures

Radio Frequency Identification Tags (RFIDs) are being used in ever greater numbers for an increasing diverse number of applications, from libraries to retail shops to Oyster cards.

  Determine the minimum cable force t and critical angle

Determine the minimum cable force T and critical angle ? which will cause the tow truck to start tipping, i.e., for the normal reaction at A to be zero. Assume that the truck is braked and will not slip at B. The truck has a total mass of 4 Mg and..

  Defining hypertension in a local population issues

What is the proportion of patients suffering from hypertension?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd