Reference no: EM131457423
Assignment: Material Planning
The forecasting department, traditionally reporting to the sale manager, has historically seen a forecast accuracy of about 60%, and this in turn causes problems for the following departments:
• Purchasing: What should we buy and how much?
• Production: What should we really build?
• Inventory management: We keep building the wrong thing.
The sales manager asked you to write her a memo, specifically addressing the following:
• How could you suggest that your new system would achieve any better levels of forecast accuracy?
• Why is forecast accuracy itself not as important under traditional methods?
• Create a chart or timeline that includes all of the following:
o Which purchase orders have to be placed, and when
o When manufacturing needs to begin, to have products delivered to a customer
o Approximate dates for all of the following:
- When the product must be shipped to meet the customer's due date
- When the application of the cover and packaging must take place to meet the customer's due date
- When the manufacturing of the widget must begin and end
- When the raw material for the widget must be ordered
- When the plastic cover must be ordered
- When the cardboard box must be ordered
o Includes notes explain your timing calculation
o Assumes all of the following conditions:
- The factory has two departments: manufacturing and packaging
- Product X consists of 3 components
- a widget manufactured in the factory with a total manufacturing lead time of 1 week
- a plastic cover purchased from vendor A with a procurement lead time of 3 weeks
- a cardboard shipping box purchased from vendor B with a procurement lead time of 4 weeks
- The widget itself is made from steel (whose lead time from vendor C is 4 weeks).
- It takes 1 day for the cover to be applied to the product and for the product to be inserted in the box in the packaging department.
- The shipping time to this customer is in 3 weeks, and you do not want it to be late or early.
- Assume you received the customer order on 1/1/20XX.
- Ignore any holidays
- Assume a 5-day work week.
What work must be done who will do the work
: Planning and Organizing an Annual Conference- What work must be done? Who will do the work? How long will it take? What resources are required?
|
What is the best recommended course of action for client
: What potential effects would themes such as the client's culture, ethnicity, family, education, and gender have on the situation and recommendation(s)?
|
Constitute the majority of the report
: Prepare at least a 10 page research paper in 12 pt. font with double spacing Graphs, tables, text, and images may be included as part of the final research.
|
What is the purpose of the specialized interview
: What is the purpose of the specialized interview? How will you plan the assessment? Whom will you interview and why?
|
What should we buy and how much
: What should we buy and how much? How could you suggest that your new system would achieve any better levels of forecast accuracy?
|
What is the shipment plan and what are the associated costs
: Consider a transportation problem with two origins (warehouses) and three destinations (customers). The supplies at the warehouses are 60 and 80 units.
|
Human resources payroll information
: Answer the questions in straight to the point short answers. please answer them as they are numbered. shouldn't be more than 500 words
|
How many ways can you assign the ribbons
: You need to assign first, second, and third place ribbons. If there are 17 students who participated, how many ways can you assign the ribbons?
|
Describe the worst interface you have ever worked
: Describe the worst interface you have ever worked with and the best interface you have ever worked with.
|