Problem: Toledo Custom Manufacturing (TCM), located in Toledo, Ohio, makes metal parts to customer specifications. They have a variety of machines including lathes, numerically controlled (NC) machines, grinders and drilling machines. They can make any metal parts that require use of these machines. TCM employs 65 workers, supervisors, and managers in its facility. TCM is very customer-oriented and prides itself on quality control. They take a Total Quality Management systems approach including use of control charts, ISO 9000 certification, employee training, and teams for continuous improvement of quality. TCM also selects its suppliers based on their ability to provide quality metal blanks and parts that are purchased.

THE PRECISE STEEL ROD ORDER

TCM recently received an order to machine 5000 push rods to be used in the production of hydraulic cylinders. The push rod is a precise steel rod that runs inside of a hydraulic cylinder to build pressure when activated. The push rod has very tight specifications to insure that hydraulic leaks do not occur. The particular rod ordered is 6" long and must be .500 inches in diameter (see Exhibit 1 for an illustration). The specifications call for ±.005" (5 onethousands of an inch) tolerance. Therefore all rods must be machined to a diameter between .495" and .505" to meet the specification and to be acceptable to the customer. In order to meet the customer's delivery schedule, TCM will utilize two machines, each with its own operator. The machines are similar, but operator 1 has more experience than operator 2. TCM must also insure that the supplier of blank steel rods will provide consistently good material for machining.

QUALITY CONTROL CHARTS

In order to prepare for the order, TCM has decided to make 30 parts on each operator-machine combination. Each operator-machine will run samples of 5 parts and make a total of six samples for 30 parts. Separate control charts will then be constructed using the samples to calculate the grand average and average range for each operator. These averages will be used to construct an upper control limit, center line and lower control limit for each of the operators. Then the six samples will be compared to these limits to see if the process is in-control or if there are outof-control points. If the process is in-control, the operator and machine can proceed to make good parts. Every hour a sample of 5 will then be taken and plotted on the chart of insure that the process is still in-control. If either machine-operator combination is out-ofcontrol based on the first six samples of 5 parts each, the

 

1352_Rod.png

process will need to be fixed before proceeding. After fixing the process another six samples of 5 parts each will be taken to see if the process is now in control and this is continued until a satisfactory test is completed. The customer has asked that the final control charts used to verify the operator-machine combinations be forwarded to them along with the 60 parts produced by the two machines. They also requested, that control charts be maintained by taking hourly samples and submitted along with future batches of the parts. In addition to statistical process control charts, the customer would like to receive a calculation of the process capability index (Cp and Cpk) to insure that the process is capable of meeting the specification. The data collected from the first six samples of 5 each are shown in Exhibit 2 for operator 1-machine 1 and operator 2-machine 2. These are the samples of 30 each required to insure that both operator-machine

1106_Rod 1.png

processes are in control before proceeding with full production of the 5000 unit order.

Questions

1. Calculate the control charts (UCL, CL, and LCL) for each operator-machine combination separately. Do this for both x-bar (average) and range charts. Draw conclusions from the charts about each operator machine combination.

2. What should be done based on the calculations from question 1?

3. What is the process capability for each operator machine combination?

4. Can you be sure that all the parts produced by in-control processes will meet the specification?

Reference no: EM131910059

Questions Cloud

What is your estimate of its wacc : You would like to estimate the weighted average cost of capital for a new airline business.
Impact of society on individual thoughts : How do sociologists study the impact of society on individual thoughts, feelings, and behavior?
Explain the difference between reinforcement and punishment : Explain the difference between Reinforcement and Punishment in Operant Conditioning.
How additional revenue would ride have to generate per year : How much additional revenue would the ride have to generate per year to make it an attractive investment?
What should be done based on the calculations : Calculate the control charts (UCL, CL, and LCL) for each operator-machine combination separately. Do this for both x-bar (average) and range charts.
What is the effective interest rate : A man has a simple discount note for $6,600, at an ordinary bank discount rate of 8.84%, for 60 days. What is the effective interest rate?
Identify potential threats to reduce the independence threat : Identify potential threats to independence & recommend safeguards to reduce the independence threat
Determine how to maximize your cash on hand three years : You can invest at most $5000 in any one of plans A. B. or C. Determine how to maximize your cash on hand three years from now.
Prepare a sample daily expense sheet : SITXFIN003 Manage finances within a budget - SIT60316 Advanced Diploma of Hospitality Management - Prepare a sample daily expense sheet

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd