Case Study - Avion Inc.

Susan Dey and Bill Mifflin, procurement managers at Avion Inc., sat across from each other and reviewed a troubling performance report concerning a key supplier, Foster Technologies. The report detailed the deteriorating performance of Foster Technologies in the areas of material quality and on-time delivery.

Susan I do not believe what I am seeing. This supplier was clearly a star when we performed our supplier visits before awarding the contract for the new Amrod product line.

Bill I am not pleased. I was on the team that performed the audit and site visit. Foster's management was so smooth-they indicated they could meet all our requirements. I feel like this supplier has misled us.

Susan : Didn't you look at their processes and quality systems?

Bill : Sure we did. Everything checked out fine. Now every other shipment has some problem, and the delays are hurting our ability to get our product to our customers. What really struck us about this supplier was how innovative they were. Foster's biggest drawback was their size-they lacked some depth at key manufacturing engineering positions. Maybe that is why they are having problems. It could be that someone has left the company.

Susan: We are going to have to address these problems quickly.

Bill: I will tell you what I am going to recommend. We should begin immediately to look for another supplier. I never was a fan of these single-source contracts. They leave us open to too much risk.

Susan: But will that take a long time?

Bill: Sure. We will have to perform another supplier search with team visits. New tooling could really cost, too. This could take months.

Susan: Has anyone talked with the supplier about these problems?

Bill:

Case Study details: This case study supports the CLO2 & 4 and should be analyzed and your responses written and submitted online. Please provide a two-page summary of your response to the questions listed at the end of this case study. Your submission format should be double-spaced, font size 12 and include a cover page. If any additional resources are used, please attach a reference page.

Case Study - Avion Inc.

Susan Dey and Bill Mifflin, procurement managers at Avion Inc., sat across from each other and reviewed a troubling performance report concerning a key supplier, Foster Technologies. The report detailed the deteriorating performance of Foster Technologies in the areas of material quality and on-time delivery.

Susan I do not believe what I am seeing. This supplier was clearly a star when we performed our supplier visits before awarding the contract for the new Amrod product line.

Bill I am not pleased. I was on the team that performed the audit and site visit. Foster's management was so smooth-they indicated they could meet all our requirements. I feel like this supplier has misled us.

Susan : Didn't you look at their processes and quality systems?

Bill : Sure we did. Everything checked out fine. Now every other shipment has some problem, and the delays are hurting our ability to get our product to our customers. What really struck us about this supplier was how innovative they were. Foster's biggest drawback was their size-they lacked some depth at key manufacturing engineering positions. Maybe that is why they are having problems. It could be that someone has left the company.

Susan: We are going to have to address these problems quickly.

Bill: I will tell you what I am going to recommend. We should begin immediately to look for another supplier. I never was a fan of these single-source contracts. They leave us open to too much risk.

Susan: But will that take a long time?

Bill: Sure. We will have to perform another supplier search with team visits. New tooling could really cost, too. This could take months.

Susan: Has anyone talked with the supplier about these problems?

Bill: Kevin went over personally today and talked with the production manager. He did not have much time to explain, but he indicated on the phone that Foster's production manager said we should accept responsibility for a good part of the problems that are occurring!

Susan: Why should we? I think they are just trying to shift the blame for their poor performance.

At this point, Kevin O'Donnell, another procurement manager, entered the room.

Bill: Kevin, glad you are here. We were just discussing how Foster is trying to blame us for their problems. I think we should dump them fast!

Kevin: Yeah, well, I have got news for you two. I think Foster's production manager is correct. I think I would be frustrated with us, too!

Susan: What are you talking about?

Kevin: I spent a good part of the day over at Foster and learned some interesting things. For example, do either of you remember what we told Foster the monthly volume requirements for the product would be?

Bill remember exactly. The volumes were projected to be 2,500 units a month. So what is the problem?

Kevin: We need to talk with our production group more often. The monthly volumes are now over 4,000 units a month! In addition, not only that, our production group now wants material within 10 days of a material release rather than two weeks. We have also been changing the final material release quantities right up to the last minute before delivery.

Bill: Uh oh. I remember on our site visit that the most their production system could handle was 3,500 units a month. In addition, a two-week lead-time was about as low as they could go.

Susan: But why did they not inform us that these changes were causing problems? They still have some explaining to do.

Kevin: Apparently, they tried. What did your team tell this supplier about communicating with us after you finished negotiating the contract?

Bill: We said that any operational problems or issues have to go through our materials management people. The team was responsible for evaluating and selecting the supplier, and then negotiating the agreement.

Kevin: Foster's production manager produced a log detailing seven memos and letters outlining the impact of our production and scheduling changes on their operation. He also called us several times with no response. Each of these inquiries received little attention on the part of our materials group. I am not sure how fond Foster is of us as a customer. I think they are anxious for this contract to wind down so they can dump us!

Susan: What do we do now?

Question 1: What parts of the supply chain are most closely involved with the situation in this case? What is the responsibility of each part in order to maintain a smooth flow of material?

Question 2: What initially appears to be the problem? What really is the problem(s) in this case?

Question 3: How easy is it to switch suppliers? What could complicate a firm's ability to switch to a new supplier?

Reference no: EM133526693

Questions Cloud

What do transportation and logistics leaders have : What do Transportation and Logistics leaders have to do to prepare for the future of freight transportation especially motor carriers
Is there a consistent approach by different departments : Choose up to three of these characteristics you would prioritize as the most important and explain why. The use of real-life examples is helpful if you can
Physical changes are being impacted during middle adulthood : Many physical changes are being impacted during middle adulthood. Of course, some changes may be biased due to your sex.
How does descartes argue that the external world exists : Why does Descartes think that the statement "I think so I am" is clearly and distinctly true in his Meditation II?
What parts of the supply chain are most closely involved : What parts of the supply chain are most closely involved with the situation in this case? What is the responsibility of each part in order to maintain a smooth
Is this a case of eugenics : Is this a case of eugenics? "Eugenics" is defined as the hereditary improvement of the human race controlled by selective breeding.
Identify at least two supply chain risks faced : Identify at least two supply chain risks faced by the organization Identify examples, if any, of supply chain disruptions experienced by the organization
Concept of emerging adulthood : Identify two societal trends that led Jeffrey Arnett to create the concept of Emerging Adulthood and describe how they prolonged the journey to adulthood.
Why is suicide the one truly serious philosophical problem : "But one day the 'why' arises and everything begins in that weariness tinged with amazement. 'Begins' - this is important." What does this quote mean?

Reviews

Write a Review

Supply Chain Management Questions & Answers

  Supply chain network design for cwc

This assignment explain the supply chain management process of cwc. What is the current annual supply chain cost?

  Criteria when making new location decisions

Identify a number of the typical criteria used when making new location decisions

  Draw the project network

Determine the mean critical path for Brent's job search process. What is the variance of the project duration?

  Compare and contrast economic - market, and relevancy

Please compare and contrast economic, market, and relevancy value.

  Brushing up on inventory control

Health system in Pennsylvania

  Supply chain strategy

Supply chain strategy

  What is the economic order quantity for fans in units

Nittany Fans of Lewistown, Pennsylvania, is a distributor of industrial fans used in plants, warehouses, and other industrial facilities.

  What factors reduce the capacity of the organization

What factors reduce the capacity of the organization to get its objectives?

  What is the total annual cost

What is the total annual cost

  Supply chain management questions

Briefly define the following two supply chain metrics: (i) inventory turnover ratio and (ii) supply chain velocity.

  Explain the supply chain management concept

Explain the supply chain management concept, Differentiate between public and private sector organisations in terms of their supply chain objectives and strategies

  How warehouses can add value in the supply chain

How warehouses can add value in the supply chain

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd