Reference no: EM131882013
Problem: SANTA CRUZ BICYCLES
Bicycle enthusiasts not only love the ride their bikes provide, but they also are often willing to pay for newer technology especially when it will increase their speed or comfort. Innovating new technologies for bikes is only half the battle for bike manufacturers. Designing the process to manufacture the bikes is often the more daunting challenge. Consider the case of Santa Cruz Bicycles. It digitally designs and builds mountain bikes and tests them under the most extreme conditions to bring the best possible product to their customers. A few years back, the company designed and patented the Virtual Pivot Point (VPP) suspension system, a means to absorb the shocks that mountain bikers encounter when on the rough terrain of the off-road ride. One feature of the new design allowed the rear wheel to bounce 10 inches without hitting the frame or seat, providing shock absorption without feeling like the rider was sitting on a coiled spring. The first few prototypes did not work well; in one case, the VPP joint's upper link snapped after a quick jump. The experience was motivation for a complete overhaul of the design and engineering process to find a way to go from design to prototype faster.
The 25-person company adopted a similar system used by large, global manufacturers: product life cycle management (PLM) software. The research and development team had been using computer-aided-design (CAD) software, but it took 7 months to develop a new design, and if the design failed, starting over was the only solution. This was not only a drain on the company's time but also on finances. The design team found a PLM system that helped them analyze and model capabilities in a much more robust manner. The team uses simulation capabilities to watch the impact of the new designs on rough mountain terrain. The software tracks all the variables the designers and engineers need so they can quickly and easily make adjustments to the design. The new system allows them to run a simulation in a few minutes, which is a very large improvement over their previous design software, which took 7 hours to run a simulation. The software was just one component of the new process design. The company also hired a new master frame builder to build and test prototypes in-house and they invested in a van-size machine that can fabricate intricate parts for their prototypes, a process they used to outsource. The result was a significant decrease in their design-to-prototype process. What used to average about 28 months from start of design to shipping of the new bike now takes 12 to 14 months.
Discussion Questions
1. What, in your opinion, was the key factor in Santa Cruz Bicycles' successful process redesign? Why was that factor the key?
2. What outside factors had to come together for Santa Cruz Bicycles to be able to make the changes they did?
3. Why is this story more about change management that software implementation?
Examining the decentralized architecture
: What, in your opinion, is the difference between a decentralized architecture and a centralized architecture? What is an example of a business decision.
|
What is the sr of the resulting portfolio
: The stock and bond portfolios have a correlation of .55 and TB or risk free rate is 2%. What is the SR of the resulting portfolio?
|
Analyze the dreamliner program
: Why did Boeing adopt the radical change approach for designing and developing the 787 Dreamliner? What were the risks? In your opinion, was it a good move?
|
What percentage of your money must you invest in the T-bill
: If you desire to form a portfolio with an expected rate of return of 0.11, what percentage of your money must you invest in the T-bill and P?
|
What outside factors come together for Santa Cruz Bicycles
: Bicycle enthusiasts not only love the ride their bikes provide, but they also are often willing to pay for newer technology especially when it will increase.
|
What is the SR for the portfolio
: What is the SR for the portfolio P? What is the change in SR if the coefficient of correlation is changed to -0.20? Assume TB rate is 5%.
|
What will be the dollar values of your positions
: You are considering investing $1,000 in a complete portfolio. What will be the dollar values of your positions in X, Y, and Treasury bills,
|
How does the system enable Tesco to increase the value
: Tesco, the U.K. retail grocery chain, used their CRM system to generate annual incremental sales of £100 million. Using a frequent-shopper card.
|
Explain customer relationship management process
: What might an integrated supply chain look like for a financial services company such as an insurance provider or a bank?
|