Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A distance of 200 ft must be taped in a manner to ensure a standard deviation smaller than ± 0.03 ft. What must be the standard deviation per 100 ft tape length to achieve the desired precision?
What is the salt usage for each regeneration if the system regenerated every 10 days? What size resin tanks (diameter, height) would be required for a duplex system with no redundancy?
A fluid flowing in a pipe 30cm in diameter has a uniform velocity of 4m/s. The pressure at the center of the pipe is 40KPa, and the elevation of the pipe's centerline above an assumed datum is 4.5m. Compute the total energy per unit weight of the ..
Assume you are observing traffic in a single lane of a highway at a specific location. you measure the average headway and average spacing of passing vehicles as 3 seconds and 150 ft, respectively. calculate the flow, average speed, and density of..
Determine the slenderness ratio of a 5 m column with built in ends if its cross- section is (a) circular with a radius of 40mm and (b) 50 mm square. Use the concept of effective length.
A 2000-lb wheel load is to be supported by aggregate over soil with a maximum bearing pressure of 1000 lb/sqft. What depth of aggregate is needed if the angle theta is 40 degrees?
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
calculate the ratio of area to volume for unit cube a unit sphere in inscribed inside the cube, and as write cylinder inscribed inside the cube.
You are a Project Manager on site where work for 3K.m. long Tunnel has been undertaken. The site is remote and takes about 2 days travel to nearest town. Supervisors, Technicians & Skilled Workers are engaged in dangerous / hazardous work.
Explain how the desert air can contain much more h 2 o vapor in the air than the pole, and still a lower humidity than the pole? what causes the difference between dry and moist lapse rate?
The velocity along a pathline is given by V (m/s) = s^2 x t^(1/2) where s is in meters and t is in seconds. The radius of curvature is 0.5 m. Evaluate the acceleration along and normal to the path at s = 2m and t = 0.5 seconds.
Determine the cycle time for a single engine scraper rated at 21 cy heaped that is used to haul material from a pit to a fill 900 ft away under severe conditions. The average haul speed will be 14 mph and the average return speed will be 20 mph.
The volume of fill required is 2500 cubic meters. Find the volume of soil that must be excavated from the borrow pit to furnish the required volume of fill. (in cubic meters).
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd