What length l of splice plate is needed

Assignment Help Civil Engineering
Reference no: EM13210544

two strips of a plastics material are bonded together as shown. The average shearing stress in the glue must be limited to 1000 kpa. what length L of splice plate is needed if the axial load carried by the joint is 55 kN and the width (W) is 315 mm?

Reference no: EM13210544

Questions Cloud

Harvey wasserman-the robber barons : Write paper on article: American Perspectives - Harvey Wasserman, “The Robber Barons”
What is the astronomic azimuth of the line : The magnetic north azimuth of a line is 128 degrees 27' while the magnetic declination is 3 degrees 30'E. What is the astronomic azimuth of the line (in decimal degrees)?
What is the length of the partial wavelength : What is the length of the partial wavelength for electromagnetic energy with a frequency of 15 MHz and a phase shift of 263 degrees (in meters)?
Use the bernoulli equation : Use the Bernoulli equation to describe how this manometer can be used to measure the flow rate through the meter.
What length l of splice plate is needed : two strips of a plastics material are bonded together as shown. The average shearing stress in the glue must be limited to 1000 kpa. what length L of splice plate is needed if the axial load carried by the joint is 55 kN and the width (W) is 315 m..
Determine the quality of the initial state : A two-phase liquid-vapor mixture of water is initially at a pressure of 10 bars. If on heating at fixed volume, the critical point is attained, determine the quality of the initial state.
Project to develop themselves professionally : Learning how to get a high performing team will require a lot of effort by the project manager. As a Project Manager, how would you balance your efforts to get the project done with your efforts to help team members use their work on the project to d..
Risks can occur any time in the project life cycle : We all know that there will be risks can occur any time in the project life cycle.
Metternich claimed after napoleans defeat : Metternich claimed after napoleans defeat that

Reviews

Write a Review

Civil Engineering Questions & Answers

  Length of contracted rectangular weir

A trapezoidal canal 6m wide at the bottom and having a side slope of 1V:2H carries water with a mean velocity of 1.0m/s to a depth of 60cm. What length of contracted rectangular weir 1.0m high should be placed at the middle of the canal to make th..

  Depict a decision tree

The mine's operating costs were projected at $900,000 per year including $400,000 of fixed costs and $500,000 of variable costs. Ms. Peru thought these forecasts accurate.

  Atual discharge of a water pipeline

If the elevation difference between the water surfaces is y = 25 + x/11 metres, what minimum pipeline diameter will be required to convey the design discharge? Once your design is complete, determine the actual discharge. The value of x equals 23.

  What is the total bod loading per day

The factory will use a 4 ft deep on-site lagoon to stabilize the waste with a loading rate of 20 lb BOD/acre-day. Part a) What is the total BOD loading per day?

  Four-lane freeway problem

A four-lane freeway (two lanes in each direction) is on mountainous terrain with 11-ft lanes, a 5-ft right-side shoulder, interchange spacing of one every 10 miles, and a 60-mi/h base free-flow speed.

  Rate of diameter increasing of a balloon

A balloon is being inflated at the rate of 15m^3/min. At what rate is the diameter increasing after 5 min? Assume that the diameter is zero at time zero.

  Find out velocity head expressed in atmospheres

What is the velocity head expressed in atmospheres for a rapid filter operated at a surface loading rate of 475 m/d when the local porosity is 0.40?

  Define soda ash and quicklime

Soda Ash and QuickLime, A lime-soda softening plant treats a flow of 150 MGD, and the water has 86mg/l Ca2+, 35 mg/L Mg2+, 299 mg/L HCO3- and 6mg/l CO2.

  Working of real estate salesperson

You are a real estate salesperson working for Good Earth, Realtors, Inc. You receive 50 percent of all commissions received by the firm (net of MLS fees) for which you were either the listing agent or the selling agent.

  Principal stresses and calculate the max shear stress

At a section in a beam the tensile stress due to bending is 70 N/mm 2 and there is a shear stress of 25 N/mm 2 . Determine from first principles, the magnitude and direction of the principal stresses and calculate the max shear stress.

  Sketch a streamline pathline and streakline

Sketch a streamline, pathline, and streakline, For a given flow the velocity from time t=0 to t=5s was u=2 m/s, v=0. Then from t=5s to t=10s the velocity was u=+3 m/s, v=-4 m/s. A dye streak was started at t=0

  Angular acceleration of the spool

determine the angular acceleration of the spool and the acceleration of the trailer. The wheels have negligible mass and are free to rotate.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd