Reference no: EM13213843
Question 1:
A firm is issuing a two-year debt in the amount of $200,000. The current market value of the assets is $300,000. The risk-free rate is 6 per cent, and the standard deviation of the rate of change in the underlying assets of the borrower is 10 per cent. Using Merton's model, determine the following:
a. The current market value of the loan, and
b. The risk premium to be charged on the loan.
Question 2:
Suppose that each of two investments has a 4% chance of loss of $ 10 million, a 2% chance that of loss of $1 million, and a 94% chance of profit of $1 million. They are independent of each other.
a. What is the VaR for one of the investments when the confidence level is 95%?
b. What is the expected shortfall when the confidence level is 95%?
c. What is the VaR for a portfolio consisting of the two investments when the confidence level is 95%?
d. What is the expected shortfall of for a portfolio consisting of the two investments when the confidence level is 95%?
Briefly describe how a lake with a limestone bed
: Briefly explain how a lake with a limestone bed is more resistant to pH changes than a lake with a granite bed
|
How different graphs help account for the long-term increase
: An alternate means of depicting the individual labor supply decision is via a graph with hours of market work (Hw) on the horizontal axis and the market wage rate (W) as well as the shadow or home wage (W*) on the vertical axis.
|
Explain the formula metallic and nonmetallic elements
: Construct a table that shows the relationship among the group number, valence electrons lost or gained and the formula metallic
|
Explain chemical equation for the release of hydroxide ions
: Complete the chemical equation that show the release of hydroxide ions as each of the following bases dissolves in water:
|
What is the var for a portfolio consisting
: What is the expected shortfall when the confidence level is 95% and what is the VaR for a portfolio consisting of the two investments when the confidence level is 95%?
|
Calculate the net present value and rate of return
: Calculate the Net Present Value and Rate of Return for the Project: Initial Cost: $100,000.00 Expected annual benefits: $20,000 Expected economic life: 10 Expected salvage: $10,000 Minimum Attractive Rate of Return: 12%
|
Compute the heat release of the compound reacted
: Calculate the heat release in KJ/g of the compound reacted w/ oxygen. The standard enthalpy of formation of C6H6 is 49.04 KJ/mol.
|
Determine what will the cost function be
: Now consider the production of Good Y. Unlike manufacturing Good Y, in this case, humans and robots are complements. The production function for Y is given by Y=f(H,R)=min(H,R). Again, the wage for humans is $15/hour
|
Define an unknown metal hypochlorite salt
: An unknown metal hypochlorite salt, M(ClO)2, is subjected to analysis by iodometric titration: the salt is dissolved in dilute sulfuric acid, treated with excess aqueous KI,and then titrated with Na2S2O3. The unknown metal ion(M2+)
|