What is the total volume of runoff

Assignment Help Civil Engineering
Reference no: EM13560386

It rains 3.0 in. on a 20.0 acre watershed. What is the volume of rainfall excess if 30% of the watershed area is a lake and infiltration on the soil is estimated at 1.0 in? What is the total volume of runoff? Express your answer in cubic feet. Assume that the lake level is low and does not contribute to rainfall excess. Hint: Lakes are treated as initial abstraction.

Reference no: EM13560386

Questions Cloud

Determine the displacement of the beam at each end : A rigid beam (AB), 12 feet in length, with a point load of 9 kips (4 feet from A) is resting on two short steel rods (AC & BD). Diameter of Rod AC is 1 inch, Rod BD diameter is 2 inches. Assuming no buckling in rods, Determine the displacement of the..
What are the strategic aims of the company : What are the strategic aims of the company?
Explaining what corporate social responsibility : Explaining what Corporate Social Responsibility
Determine the minimum horizontal force necessary for 200 lb : Determine the minimum horizontal force necessary for 200 lb man to scale crevice (using his feet and back). The coefficient of static friction between his shoes and his back against the wall is 0.4.
What is the total volume of runoff : It rains 3.0 in. on a 20.0 acre watershed. What is the volume of rainfall excess if 30% of the watershed area is a lake and infiltration on the soil is estimated at 1.0 in? What is the total volume of runoff? Express your answer in cubic feet.
Fully explore the perspectives on forecasting : Fully explore the perspectives on forecasting
Determine the coliform concentration of the discharge : Backriver wastewater treatment plant must disinfect its effluent before discharging the wasterwater onto Backriver. The plant has plug flow reactor of length 1800m which treats the wastewater biologically by first order reaction
Identify and explain the strong points of the managers : Identify and explain the strong points of the managers.
Calculate the net present value of each option based : Calculate the net present value of each option based on a discount rate of 5%/year. (Hint: draw a cash flow diagram for each of the two options.)

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine what is the design speed of the curve

An equal tangent vertical curve connects a -2% and a +3% grade. The low point of the curve is at elevation 297.88 ft. If the PVI is at elevation 295 ft, what is the design speed of the curve

  Explain how to determine the power input to the pump

Water enters the pump of a steam power plant as saturated liquid at 20 kPa at a rate of 45 kg/s and exits at 6 MPa. Neglecting the changes in kinetic and potential energies and assuming the process to be reversible

  Which measurement contributes to large amount of error

Which measurement contributes to large amount of error? how would you improve on these measurements if you repeated this lab exercise?

  How many gallons would be required to last same time as gas

A water treatment plant effluent is to be disinfected with chlorine from ton cylinders of compressed gas. The plant is 5 million gallons per day. There are a total of 10 useable cylinders in the plant.

  What is level of service of compound-grade freeway segment

The directional hourly traffic flow is 2000 vehicles with 5% large trucks and buses (no recreational vehicles). The total ramp density for this freeway segment is 2.33 ramps per mile. If peak hour factor is .90

  Calculate the total active earth force per foot of wall

Calculate the total active earth force per foot of wall and its point of application from the base of the wall. Use Rankine theory. Calculate the total active earth force per foot of wall if the angle of wall friction between backfill and wall is 2..

  The reservoir is connected to a round tube

As shown, a load of mass 10 kg is situated on a piston of diameter D1 = 140 mm. The piston rides on a reservoir of oil of depth h1 = 42 mm and specific gravity S = 0.8.

  Freeway capacity and los

A four-lane freeway (two lanes in each direction) is on mountainous terrain with 11ft lanes, a 5ft right-side shoulder, interchange spacing of one every 10 miles, and a 60mph base free-flow speed.

  What volume of leachate is being added to the river each day

A landfill is located 500 km from a river whose surface elevation is 40 m lower than the ground elevation at the landfill. After several years it is discovered that leachate from the landfill, with a COD of 1300 mg/L, is leaking into the river.

  How many yards of borrow will be required to complete

An embarkment will be constructed with the soil compacted to 95 percent of the max dry density. the borrow material, is deposited at a uniform density of 75 percent of the max dry density. the roadway embankment will require 75,000 cubic yards of fil..

  Determine the time it takes to achieve an angular velocity

The flywheel rotates with an angular velocity of omega = (4*theta^(1/2)) , where theta is in radians. Determine the time it takes to achieve an angular velocity of omega = 190 rad/s . When t = 0, theta = 1 rad .

  Ten kilograms of saturated liquid calculate the work done

Ten kilograms of saturated liquid water at 5 bar is heated in a piston-cylinder assembly at constant pressure until temperature reaches 400 degrees C.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd