What is the total delay per cycle and delay per vehicle for

Assignment Help Civil Engineering
Reference no: EM13563783

A left-turn movement has a maximum arrival rate of 200 veh/h. The saturation flow of this movement is 1400 veh/h. For this approach, the yellow time is 4 seconds, all red time is 2 seconds and total lost time is 3 seconds. The cycle lenght is 120 seconds. What minimum displayed green time must be provided to ensure to ensure that the queue in each cycle clears, and what is the total delay per cycle and delay per vehicle for this green time?(Assuming D/D/1 queuing)

Reference no: EM13563783

Questions Cloud

Design a cyclone that has a collection efficiency between 80 : Design a cyclone that has a collection efficiency between 80% and 85% (use parcticle size distribution given below). you must assume a dpc of 4.2 microns,an inlet gas velocity of 25 m/s and a K of 15.The unit must handle 20,000 cfm of contaminated ..
Determine the tank depth and diameter to produce an overflow : Design a circular radial-flow clarifier for a town with a projected population of 45,000. Assume that the wastewater flow is 400 L/capita-day. Size the system for a 2-hr
Compute the force fa on the roller and the x- and y-componen : Three point loads 10,000, 7500 and 9000 kN act in line 5m apart near the surface of a soil mass. Calculate the vertical stress at a depth of 4m vertically below the centre (7500kN) load.
What is the minimum required temperture of the boiler : A coal fired steam power plant is to be designed for the purpose of generating electrical power for a city with a population of 60,000 residents. Based on an order-of-magnitude analysis
What is the total delay per cycle and delay per vehicle for : A left-turn movement has a maximum arrival rate of 200 veh/h. The saturation flow of this movement is 1400 veh/h. For this approach, the yellow time is 4 seconds, all red time is 2 seconds and total lost time is 3 seconds.
Determine the period and frequency of the motion : A 75-lb block is supported by the spring arrangement shown. The block is moved vertically downward from its equilibrium position and released. Knowing that the amplitude of the resulting motion is 2 in.,
Determine the normal capacity of the highway : Determine the normal capacity of the highway, the capacity of the highway upstream of the work zone, and the capacity within or in the vicinity of the work zone.
Find the minimum speed at which the train could pass over : Steam locomotives require water at such rates that the storage tank behind the locomotive was refilled at 100 mile interverals. one technique used was to place a long tank between the rails and the water the water would be scooped up as the locomotiv..
Determine the longest wait of any vehicle : An incident occurs on a freeway that has a capacity in the northbound direction, before the incident, of 4000 veh/h and a constant flow of 2900 veh/h during the morning commute.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd