What is the total delay per cycle and delay per vehicle for

Assignment Help Civil Engineering
Reference no: EM13563783

A left-turn movement has a maximum arrival rate of 200 veh/h. The saturation flow of this movement is 1400 veh/h. For this approach, the yellow time is 4 seconds, all red time is 2 seconds and total lost time is 3 seconds. The cycle lenght is 120 seconds. What minimum displayed green time must be provided to ensure to ensure that the queue in each cycle clears, and what is the total delay per cycle and delay per vehicle for this green time?(Assuming D/D/1 queuing)

Reference no: EM13563783

Questions Cloud

Design a cyclone that has a collection efficiency between 80 : Design a cyclone that has a collection efficiency between 80% and 85% (use parcticle size distribution given below). you must assume a dpc of 4.2 microns,an inlet gas velocity of 25 m/s and a K of 15.The unit must handle 20,000 cfm of contaminated ..
Determine the tank depth and diameter to produce an overflow : Design a circular radial-flow clarifier for a town with a projected population of 45,000. Assume that the wastewater flow is 400 L/capita-day. Size the system for a 2-hr
Compute the force fa on the roller and the x- and y-componen : Three point loads 10,000, 7500 and 9000 kN act in line 5m apart near the surface of a soil mass. Calculate the vertical stress at a depth of 4m vertically below the centre (7500kN) load.
What is the minimum required temperture of the boiler : A coal fired steam power plant is to be designed for the purpose of generating electrical power for a city with a population of 60,000 residents. Based on an order-of-magnitude analysis
What is the total delay per cycle and delay per vehicle for : A left-turn movement has a maximum arrival rate of 200 veh/h. The saturation flow of this movement is 1400 veh/h. For this approach, the yellow time is 4 seconds, all red time is 2 seconds and total lost time is 3 seconds.
Determine the period and frequency of the motion : A 75-lb block is supported by the spring arrangement shown. The block is moved vertically downward from its equilibrium position and released. Knowing that the amplitude of the resulting motion is 2 in.,
Determine the normal capacity of the highway : Determine the normal capacity of the highway, the capacity of the highway upstream of the work zone, and the capacity within or in the vicinity of the work zone.
Find the minimum speed at which the train could pass over : Steam locomotives require water at such rates that the storage tank behind the locomotive was refilled at 100 mile interverals. one technique used was to place a long tank between the rails and the water the water would be scooped up as the locomotiv..
Determine the longest wait of any vehicle : An incident occurs on a freeway that has a capacity in the northbound direction, before the incident, of 4000 veh/h and a constant flow of 2900 veh/h during the morning commute.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Erive an expression for the change in pond depth

An object of density P_a, volume V_a, and weight W_a is thrown from a rowboat floating on the surface of a small pond and sinks to the bottom.

  What is partial pressure of each gass componet at 25 degrees

A 1-m^3 volume tank contains a mixture of 18.32 moles of oxygen, 16.40 moles of Nitrogen, and 6.15 moles of carbondioxide. What is the partial pressure of each gass componet at 25 degrees

  What is the force between the bar and block d

Block D sits freely on the homogeneous bar and experiences a gravitational force of 50N. Homogeneous bar AB experiences a gravitational force of 25 N. What is the force between the bar and block D?

  What is the concentration in ppm at the downstream reach

Five million gallons per day (mgd) of a conservative substance,with concentration of 10 mg/L is released into a stream having anupstream flow of 10.0 mgd and a substance concentration of 3 mg/L.Assume complete mixing.

  How to draw the expected water table profile along the line

Compute the water table profile drawn in part B. Provide a detailed description of your methodology, and limit your solution to include only 4 image wells. Plot the profile, and provide drawdown amounts at X = -400 m, -200 m, -100 m, 100 m, 200 m,..

  Do you believe it is plausible that the blocks do not meet

Do you believe it is plausible that the blocks do not meet the specification, or are you convinced that the blocks meet specification? Explain your reasoning.

  Find the amount of work in foot-pounds required

A trough is 5 feet long and 1 foot high. The vertical cross-section of the trough parallel to an end is shaped like the graph of y=x6 from x=?1 to x=1 . The trough is full of water. Find the amount of work in foot-pounds required

  Determine the force p that must be applied toi the cylinder

The tube is attached at B to a rigid plate that is itself attached at C to the bottom of an aluminum cylinder (E= 72 GPa) with a cross-sectional area of 250 mm^2.

  Percent elongation and percent reduction in area

Also, at the failure cross sections the diameters are found to be 0.731 in., 0.645 in., and 0.587 in., respectively. Determine the percent elongation and percent reduction in area of each specimen.

  Show the combined state of stress on the surface

Determine the maximum shearing stress and any coexisting normalstress on the element and show these on a correctly orientedelement.

  Determine the power required as a function of time

A train of total mass equal to 500 Megagrams starts from rest and accelerates uniformly to a speed of 90 km/h in 50 s. After reaching this speed, the train travels with a constant velocity.

  Determine the magnitude and directional sense

The railway crossing gate consists of the 100 kg gate arm having a center of mass at Ga and the 250 kg counterweight having a center of mass at Gw. Determine the magnitude and directional sense of the resultant moment produced by the weights about po..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd