What is the total cost of the garage conversion project

Assignment Help Managerial Accounting
Reference no: EM133533028

Case Study: Denise, a 60-year-old woman residing in Hobart,Glenorchy, in a new house with a double garage, seeks tocapitalise on the housing crisis by converting her garage into one of the three options: (1) a bedroom; (2) abedroom with ensuite bathroom; (3) a bedroom, ensuite bathroom and kitchenette for UTAS students.Converting a double garage into student accommodation is a significant project, with costs that can varydepending on factors such as the size of the garage, the extent of the renovation, and materials used.There are also several accounting implications that must be considered, such as financing the conversion,determining what rent to charge, and ensuring that the conversion meets all building and safetyregulations. Denise consulted with professionals and based on her plan, here is a detailed breakdown ofthe estimated costs she might incur: Initial Consultation and Design that cost anywhere from $500 to $3,000, depending on the extent of the project. Structural Alterations: converting the garage into a living space will require extensive structural alterations, such as installing walls, insulation, and electrical and plumbing systems. The cost of these can vary significantly, based on the specific requirements of the project, but typically range from $20,000 to$50,000.Windows and Doors: windows and doors must be installed to meet building codes and create a comfortable living space. The cost of windows and doors can vary, depending on size and quality, but typically ranges from $3,000 to $10,000.Flooring: Denise will need to install a new flooring system to make the garage a liveable space. The cost of this can vary based on the type of flooring she chooses, but typically ranges from $5,000 to $10,000.Kitchen and Bathroom: If she plans to include a kitchen and bathroom, the cost can increase significantly. Kitchen appliances, cabinets, and countertops can cost between $10,000 and $20,000, while a basic bathroom installation can range from $5,000 to $10,000.Permits and Fees: Depending on her location, Denise may need to obtain permits from local authorities, which can cost at least $1,000.A separate electrical panel:The estimated cost to install a separate electrical panel for converting a double garage into living space is typically around $800 to $2,500.Insulation:The cost of adding insulation ranges from $1,400 to $4,000.She currently has $25,000 in her bank account and is open to obtaining a bank loan if necessary.

Questions:

  • What government grants or financial support might be available to help fund the project, and how can these be accessed? And does that available regardless the type of the rental?
  • What is the total cost of the garage conversion project, including any costs associated with obtaining a council permit based on the three options: (1) a bedroom; (2) a bedroom with ensuite bathroom; (3) a bedroom, ensuite bathroom and kitchenette.?
  • Will Denise need to borrow money from the bank, and if so, how much? What is the current interest rate on a loan for home improvements?
  • Is there a specific annual cost associated with running the accommodation, which Denise needs to consider?
  • How much rent could she charge for this type of accommodation, in the current market, and what is her potential income from the accommodation?
  • What is the break-even point for the projects?
  • What is the payback period for the garage conversion projects?
  • Assuming Denise has expressed her desire to recover the conversion costs within three years, what is the minimum rent she needs to charge her tenants to accomplish this goal? Is it feasible to achieve this target in the current, competitive, rental environment?
  • What is the net present value (NPV) of the projects?

Reference no: EM133533028

Questions Cloud

Context of atrican american cross-cultural experiences : Think about cultural relativism in the context of atrican american cross-cultural experiences.
What would the city of rockville estimated costs : What would the city of Rockville's estimated costs be if its trucks drove 500,000 miles in year 7?
Mention the communication errors in the message : What is the main problem that the supervisor is trying to solve? Mention the communication errors in the message.
Provide actions that someone in middle adulthood increase : Provide at least two actions that someone in middle adulthood could increase or maintain their quality of life in the midst of these challenges.
What is the total cost of the garage conversion project : What government grants or financial support might be available to help fund the project, and how can these be accessed? And does that available regardless
Construction management principles - building failure : BLCN29001 Construction Technology, Central Queensland University - current and new products and services and their technical specific requirements to manage
Briefly summarize the major point you plan to cover in paper : In the Introduction of your paper: (i) State the purpose of your paper. (ii) Briefly summarize the major points you plan to cover in your paper.
What was the division sales revenue for the quarter : What was the division's sales revenue for the quarter? What was the division's net operating income for the quarter?
How many units of each product should cane produce : assume that the raw material available for production is limited to 162,000 pounds. How many units of each product should Cane produce to maximize its profits?

Reviews

Write a Review

Managerial Accounting Questions & Answers

  Manage budgets and financial plans

Explain the budgeting process and its importance to a business, identifying the components of different budgets, forecast estimates for inclusion in the budgets.

  Prepare a retained earnings statement

Prepare a retained earnings statement for the year and Prepare a stockholders' equity section of given case.

  Prepare a master budget for the three-month period

Prepare a master budget for the three-month period.

  Construct the companys direct labor budget

Construct the company's direct labor budget for the upcoming fiscal year, assuming that the direct labor workforce is adjusted each quarter to match the number of hours required to produce the forecasted number of units produced.

  Evaluate the predetermined overhead rate

Evaluate the Predetermined Overhead Rate

  Determine the company''s bid

Determine the company's bid if activity-based costing is used and the bid is based upon full manufacturing cost plus 30 percent.

  Compute the pool rates for the different activities

Complete the schedule to compute the pool rates for the different activities.

  Prepare Company financial statements

Prepare Company financial statements

  Prepare an analysis of terracycles

This individual assignment is based on the TerraCycle Inc.

  Discuss the ethical issues

Discuss the ethical issues

  Political resources in emerging markets

Calculate the GDP in Income Approach  and Expenditure Approach

  Management accounting - ehsan electronics company

A new plant accountant suggested that the company may be able to assign support costs to products more accurately by using an activity based costing system that relies on a separate rate for each manufacturing activity that causes support costs.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd