What is the tensile force on the weld per foot

Assignment Help Civil Engineering
Reference no: EM13545636

a.) Determine the maximum shear stress in a rectangular beam 6 in. wide and 8 in. deep produced by a shear force of 38,400 lb.

b.) For the same section and shear force conditions of part (a) above. Determine the shear stress 3 inches above the neutral axis in the beam.

(c)Determine the bending moment in a rectangular beam 2 in. wide and 4 in. deep, if the maximum bending stress is 20,000 psi.

(D)Due to a leak in Pump Station 1,the Alaska pipeline is shut down briefly.The pipe line is half full.Assume the pipe is welded horizontally at its midpoint.What is the tensile force on the weld per foot? Assume Ø=40”and ?oil=53.55lb/ft3.

Reference no: EM13545636

Questions Cloud

The mass center of the unbalanced disk of weight w is locate : The mass center of the unbalanced disk of weight W is located at G, which is a distance of R/2 from the center for the disk. In the equilibrium postition
What will be the discharge through the pipe : A pump having the characteristics given in figure 14.9 ( N=2133.5 rpm, n=35.6 rps, D=37.1 cm) pumps water at 25 degree C from a reservoir at an elevation of 366 m to a reservoir at an elevation
Find the operating points (q) for one pump : The pump curve for a given pump is represented by hp,pump=20 (1-(Q/100)^2) where hp,pump is the head provided by the pump in feet and Q is the discharge in gpm.
What is the minimum radius that can be cleared : A two lane hwy with 12' lanes is to be reconstructed to a design speed of 50 mph. Due to right of way restrictions, the largest distance that can be cleared from the edge of the road is 10'. What is the min. radius?
What is the tensile force on the weld per foot : Due to a leak in Pump Station 1,the Alaska pipeline is shut down briefly.The pipe line is half full.Assume the pipe is welded horizontally at its midpoint.What is the tensile force on the weld per foot? Assume Ø=40”and ?oil=53.55lb/ft3.
The average return period of the median value : The probability that, for a 2-year period, the peak flow rate will equal or exceed the median value in the second year, but not in the first year?
What happens after the memory is full : Assuming approximately 19,296 data points can be held in memory, with a 21X Datalogger (CR23X Micrologger), capturing battery voltage; panel temperature
Compute the maximum fiber stress : An S 12x40.8 of A36 steel in a building is supported as a simple beam having a span equal to 17ft 6in. and carries a uniform load equal to 1.60 klf, which includes the weight of the beam over the entire span.
What is the probability that the probability if the flow : You are provided that a 33-year record of peak annual flow rates was subjected to a frequency analysis. You are interested in the median value. Thus, for part (a), what is the probability that the probability if the flow rate exceeds the median value..

Reviews

Write a Review

Civil Engineering Questions & Answers

  What will the volume of the sample be for the water content

a saturated 100 cm^3 clay sample has a natural water content of 30 percent. it is found that the shrinkage limit occurs when the water content is 19 percent. if the specific gravity of soil solids is 2.70

  Calculate the acceleration in meters per second squared and

Calculate the acceleration in meters per secondsquared and compare to the value of the gravitational accelerationnear the Earth's surface (9.8 m/s^2)

  Discuss the design of a temporary earth support system

Construction dewatering plays are very large role in the todays construction arena. Discuss the role water conditions plays in the planning and design of a temporary earth support system.

  Explain is the flow field compressible or incompressible

Consider the flow field where angular velocity w is equal to 2pi rad/s ( a physical frequency of 1 Hz). Is this flow field compressible or incompressible

  Determine kinetic energy after the stream has slowed down

A section view of a dam shown and water is stored at an elevation of 6 m above the base. the water flows through the dam in a concreate opening 2m high and 3 m wide. there are no losses or friction.

  Determine the maximum force the hand can apply

assume that the whole twisting moment is taken by the bone. If the humerus can withstand a shear stress Tmax=70.0 MPa, determine the maximum force the hand can apply without fracturing the humerus. The length of the forearm is 360 mm.

  Determine the maximum shearing stress in each shaft

Knowing that G = 11.2 x10^6 psi, determine the maximum shearing stress in each shaft when a torque of T of magnitude 420kip*ft is applied to the flange indicated. And the torque T is applied to flange B.

  Determine the required value for m

A 1 meter diameter cylindrical mass, M, is connected to a 2 meter wide rectangular gate. The gate is to open when the water level, h, drops below 2.5 meters. Determine the required value for M. Neglect friction at the gate hinge and pulley.

  Calculate the plume centerline temperature at 6 m height

A pump in a large industrial hall containing 30 liters gasoline breaks down, causing the gasoline to spill into a 3 m2 sump surrounding the pump. The liquid pool is ignited by sparks. Assume the combustion to be 70% effective and the heat loss due..

  Calculate the diameter of this pipe

Using the Hazen-Williams approach (seecoefficient table below), find the headloss of water flowingthrough 1,000-ft of 6-ft diameter concrete pipe at a flow rate (Q)of 80 ft3/sec

  How long in hours will it take to reduce the concentration

One way to treat amd is to treat the metals in a holding pond. The first order rate constant is 10/day. The concentration in the water must be below 5 ppm. How long in hours will it take to reduce the concentration from 250 ppm to 5 ppm

  Estimate the size of a uniform horizontal welded-steel pipe

Estimate the size of a uniform, horizontal welded-steel pipe installed to carry 14.0 ft^3/sec of water 20 degreesC. The allowable pressure loss resulting from friction is 17ft/mi of pipe length.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd