Suppose your wait time for a shuttle bus in the morning is normally distributed with µ=8 minutes and t1=5 minutes. Due to increased congestion in the afternoon, your wait time for a shuttle bus in the afternoon is normally distributed with µ=10 minutes and t2=8 minutes.

A. If you take the bus each morning and afternoon for a week (Monday through Friday), what is your total expected waiting time? [Hint: Define random variables X1, ..., X10 and use a rule of expected value.)

B. What is the standard deviation of your total weekly waiting time?

C. If individual bus arrival times are independent of other buses, what is the probability that your weekly total bus waiting time is less than 1 hour?

D. What are the expected value and standard deviation of the difference between morning and evening waiting times on any single day?

E. What are the expected value and standard deviation of the difference between total morning waiting time and total evening waiting time for a particular week?

Reference no: EM13317783

Questions Cloud

What are the pros and cons of using plain coding : Explain how a web site could learn something about your browsing habits. Make assumptions (mention the assumptions and justify them). Consider more than one scenario and use examples to support your answer.
Calculate total active earth force of wall per linear foot : A smooth, vertical wall is 25 feet high and retains a cohesionless soil with a unit weight of 115 pcf and an angle of internal friction of 30 degrees. The top of the soil is level with the top of the wall, and the soil carries a uniformly
What is the distance between two converging lenses : What is the distance between two converging lenses, each of ofcal length f and used in combination to become a telescope
Calculate the total active earth force per foot of wall : Calculate the total active earth force per foot of wall and its point of application from the base of the wall. Use Rankine theory. Calculate the total active earth force per foot of wall if the angle of wall friction between backfill and wall is 2..
What is the standard deviation of total weekly waiting time : Suppose your wait time for a shuttle bus in the morning is normally distributed with µ=8 minutes and t1=5 minutes. Due to increased congestion in the afternoon, your wait time for a shuttle bus in the afternoon is normally distributed
Write a breadth-?rst search algorithm : Write an algorithm to classify the edges of a directed graph G into the four categories: tree edge, back edge, forward edge and cross edge (de?ned in De?nition 7.14, pages 342-343).
What is the the net capacitance : if 5 capacitors each of 5 micro F are connected in series with 4 capacitors each of 4 uF capacitances in parallel. what is the the net capacitance
Determine the maximum shear stress in the shaft : The motor A delivers 3000 hp to the shaft at 1500 rev/min, of which 1000 hpis removed by gear B and 2000 hp is removed by gear C. Determine (a) the maximum shear stress in the shaft; and (b) the angle of twist of end D relative to end A.
Calculate rental fee for different types of borrowable media : Assume that there is an abstract class called Vehicle, which has two concrete subclasses, Car and Truck. There is also an interface Loadable, which only Truck implements - calculate a rental fee for different types of borrowable media (e.g. books,..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Designing the tangent vertical curve

Due to a street crossing a roadway, the elevation of the roadway at station 3 +413.760 must be at 129.388 m. Design the curve?

  What is the main difference of prestressed concrete beams

What is the main difference between the calculation of deflections for reinforced and prestressed concrete beams

  Explain how to determine the max height of a brick wall

Assuming a density of 120/ft^3 for masonry brick work, determine the max height of a brick wall if the allowable compressive stress is limited to 150/in^2 and the brick is a) 4" wide b) 6" wide.

  Determine what will be the profit be after 4 years

A $325,000 bond has an interest rate of 8.4% but if the bond experiences an inflation rate of 8.6% what will be the profit be after 4 years

  Determine whether wall has adequate sliding resistance

Whether the wall has adequate sliding resistance and whether the wall is safe against over-turning

  Use strain energy to calculate deflection of bar at point e

A rigid horiztonal bar is suspended from two springs and is subjected to a vertical force of F0 = 158.8 kips. Each spring has a stiffness k = 14.7 kips/inch. If L1 = 11 inches and L2 = 11 inches, use strain energy to calculate the deflection of th..

  Calculate volume of sample that will be used in bod bottle

If a sample for BOD needs to be diluted by a factor of 0.02 , calculate the volume of sample that will be used in the BOD bottle

  Describe the ductility of a reinforced concrete beam

What does under-reinforced mean Which is desirable and why How would your Moment-Curvature plot be affected if the amount of tension steel was doubled How would your Moment-Curvature plot from part a be affected if compression steel was added to the..

  Explain important information about short essay

Important information about Short essay, In managing the uncertainties of ethical issues in engineering, what are some questions that we may ask to limit some of the risk

  What is probability that will cross within first four gaps

The traffic on the one-­way main street shown below may be satisfactorily described by a Poisson process with an average rate of arrival of 8 cars per minute. A driver (indicated by the box) on the side street is waiting to cross the main street.

  Which machine should be chosen using an interest rate

North City must choose between two new snow-removal machines. The SuperBlower has a $70,000 first cost, a 20 year life, and an $8000 salvage value. At the end of 9 years , it will need a major overhaul costing $19,000.

  Determine the net rate of flow of linear momentum

Determine the net rate of flow of linear momentum through the control surface.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd