Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A CAT 834H (rubber tires, high pressure), with an operating weight of 103,849 lbs, is pulled up a road whose slope is +3.0% at a uniform speed. If the average tension in the towing cable is 6,060 lb, what is the rolling resistance of the road? This would be what type of road surface?
Determine the compressive strengths of the following
Determine the minimum height on the wall to which the firefighter can project water from the hose, so that the water strikes the wall horizontally. The speed of the water at the nozzle is Vc=48ft/s.
Find the magnitude and depth of the point of application of the force on the circular gate shown (circular gate at an angle of 60 deg.) if h(distance from top of gate to top of water)=5ft. and D(length of the gate)=4 ft.
A 1045 steel will be heat treated in air at 900 C. What is the carbon concentration at 0.4 mm below the surface after 6 hours
Determine the magnitude of which will cause the reaction at the bearing to be equal to zero. The bearings are in proper alignment and exert only force reactions on the rod. Set = 600 .
a 5 inch inside diameter well is to be placed to a total depth of 60 m in an unconfined sand aquifer. the saturated
Using 1630.56 kN as the ultimate capacity determine the diameter of a drilled shaft pile that would have the same ultimate capacity and depth embedment (11.5 m) using the FHWA method. Neglect shaft resistance. Use a F.S. of 2
a beam is made by bonding a brass core to a steel tube and is subjected to a bending moment as shown. knowing that b
Assume that bonding atoms touch one another, that the angle between adjacent bonds is 109.5, and that each atom internal to the unit cell is positioned a/4 of the distance away from the two nearest cell faces.
The construction of a multi storied building started in January 1989 & was completed in June 1990. The total consolidation settlement of the building was estimated to be 8 cm.
question in structure analysis concrete column with dimension square 300 mm300 mm length 3m and concrete grade c3545.
determine the velocity and acceleration of point C of the belt, (a) immediately before the power is turned off. (b) 9 s later.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd