Reference no: EM13956949
The Bartram-Pulley Company (BPC) must decide between two mutually exclusive
investment Projects. Each project costs $6,750 and has an expected life of 3 years. Annual net cash flows from each project begin 1 year after the initial investment is made and have the following probability distribution:
Project A Project B
____________________________________________________________________
Probability Net Cash Flow Probabilty Net Cash Flow
____________________________________________________________________
0.2 $6,000 0.2 $0
0.6 6,750 0.6 $6,750
0.2 7.500 0.2 18,000
BPC has decided to evaluate the riskier project at a 12% rate and theless risky project at a 10% rate.
a. What is the expected value for the annual net cash flows from each project? What is the coefficient of variation?
b. What is the risk-adjusted NPV of each project?
c. If it were known that Project B was negatively correlated with other cash flows of the firm whereas Project A was positively correlated, how would this knowledge affect the decision? If Project B's cash flows were negatively correlated with gross domestic product would that influence your assessment of its risk?
Global summary of cvs pharmacy
: Write a Global summary of CVS Pharmacy
|
Calculate magnitude of the force r supported by pin
: The simple 2 kg pendulum is released from rest in the horizontal position. As it reaches the bottom (vertical) position the cord wraps around the smooth fixed pin at A and continues in the smaller arc in the vertical plane. Calculate the magnitude..
|
What qualitative factors should be considered
: What will be the effect on company prot related to accepting the Northwood Industries job? What qualitative factors should be considered in the decision whether to accept the job ornot?
|
Different values possible for the random variable
: Assume that the box contains balls numbered from 1 through 22, and that 3 are selected. A random variable x is defined as 3 times the number of odd balls selected, plus 4 times the number of even. How many different values are possible for the ran..
|
What is the risk-adjusted npv of each project
: If it were known that Project B was negatively correlated with other cash flows of the firm whereas Project A was positively correlated, how would this knowledge affect the decision?
|
Define international political economy
: 1. Define International Political Economy IN YOUR OWN WORDS. Why is it so important to understand what it is? Can we understand economics without politics? Can we understand politics without economics? 2. What are 3 important issues in the DEVELOPED..
|
Maximum number of tybars
: It is conjectured that the maximum number of Tybars that could be sustained on the planet is 312,500. How many years from the date of introduction of the herd will it take for the number of Tybars to reach that number?
|
Determine the weighted-average unit contribution margin
: How did participating in discussions help your understanding of the subject matter? Is anything still unclear that could be clarified - What approaches could have yielded additional valuable information?
|
Calculate the effective address time
: Calculate the effective address time if average page fault service time of 20 millisec and a memory access time of 80ns. Let us assume the probability of a page fault 10%
|