Reference no: EM1361635
We observe a closed system for 30 minutes, during which 1600 tasks are completed, from 12 terminals. Each terminal (source of tasks) has a think time of 12s between receiving the response to one task, and submitting the next task. The system has a CPU and two disks, one is fast, the other is slow. The fast disk can deliver a block in 1/2 of the time that the slow disk would take. During the observation period, 32000 accesses occur at the fast disk, and 12000 accesses at the slow disk. During the observation period, the CPU is busy for 1080s, the fast disk is busy for 400s, and the slow disk is busy for 600s.
a) What is the response time for jobs in the observed system?
b) As a function of N, the number of terminals, what are the high-load bounds for throughput and response time?
c) As a function of N, what are the low-load bounds for throughput and response time?
d) How many terminals can we support, while keeping the response time below 3 s?
e) Suppose we plan to replace the CPU with a CPU whose speed is double (thus the time to execute each job would decrease so it becomes 1/2 of the current time). Estimate the number of terminals we can support, with response time below 3s.
f) Propose a design that can support 45 terminals with response time below 3s.
Where would a third positive charge of the same magnitude
: A curve with a 140 radius on a level road is banked at the correct angle for a speed of 20 . If an automobile rounds this curve at 30 , what is the minimum coefficient of static friction between tires and road needed to prevent skidding.
|
Compute depreciation charge
: Pemberton Corporation bought a machine costing $300,000 that had an estimate useful life of 6-years and residual value of $18,000. The machine is expected to produce 3,525,000 units during its useful life;
|
Illustrate what happens to your tax bill and to your average
: Illustrate what happens to your tax bill and to your average and marginal tax rates if your income rises to $40,000.
|
Show risk management in contracts
: Risk Management in Contracts - What are the different types of contracts and how do they impact risk?
|
What is the response time for jobs in observed system
: We observe a closed system for 30 minutes, during which 1600 tasks are completed, from 12 terminals. Each terminal (source of tasks). What is the response time for jobs in the observed system?
|
Why us health care system is good
: Describe five health issues we might face over the next 20 years, and provide solutions to those problems. List and describe briefly five reasons why, the U.S. health care system is good.
|
Illustrate what happens to the price received by sellers
: Solve for the new equilibrium. Illustrate what happens to the price received by sellers, the price paid by buyers, and the quantity sold.
|
Policy analysis-stakeholder alternatives
: Policy Analysis-Stakeholder Alternatives - How does a policy analyst differentiate between ideal and practical alternatives for a stakeholder
|
Prepare a schedule showing unit and total depletion
: Cleanburn Coal Corporation bought coal-leasing land that contains 800,000 tons of coal for $21,700,000. Soil test through geologist cost $35,250 for the purchased land, but test at other sites that yielded negative results cost $116,250.
|