What is the optimum number of vending machines

Assignment Help Other Engineering
Reference no: EM131475404

Q1. A specialty software development firm is planning to offer one of four new software products and wishes to maximize profit, minimize risk, and increase market share. If a weight of 65% is assigned to profit potential, 20% to profitability risk, and 15% to market share, identify the product that would be best for the firm to introduce.

New product

Profit potential ($)

Profit risk ($)

Market share

SW1

80k

40k

High

SW2

120k

30k

Low

SW3

160k

60k

Medium

SW4

120k

40k

Medium

Q2. The following payoff matrix indicates the expected profits associated with three decision options and three states of nature:

 

State of nature

S1

S2

S3

 

Option

T1

30

50

60

T2

40

60

20

T3

60

20

40

Select the decision option that should be selected for i) the maximin rule, ii) the maximax rule, iii) the Laplace rule, iv) the Hurwicz rule with α=0.25.

Q3. An item of energy-efficient equipment can be installed for $20,000, and which is expected to have a salvage value of $5,000 after 20 years, is expected to save $8,000 in energy costs per year.
i) What is the rate of return if the equipment is in operation for 20 years?
ii) For what lifetime will the equipment give a return of 10% ?

Q4. A manufacturing plant has the capacity to assemble 500,000 units per year. At present it is operating at 75% of capacity. The annual income is $500,000. The annual fixed cost is $150,000 and the variable cost $0.40 per unit assembled.
i) What is the annual profit or loss of the centre?
ii) At what volume of output does the centre break even?
iii) What will be the profit or loss at 70%, 80% and 90% of capacity on the basis of constant income per unit and constant variable cost per unit?

Q5. A used automobile can be purchased by a student to provide transportation to and from university for $10,000 as-is (i.e. without warranty). First year maintenance cost is expected to be $400 and the maintenance costs will increase by $100 per year thereafter. Operation costs for the automobile will be
$2,000 for every year the automobile is used and its salvage value decreases by 15% per year.
i) What is the economic life of the vehicle without considering the varying value of money over time?
ii) What is the economic life of the vehicle if the rate of interest is 5%?

Q6. A component manufacturer has a demand of 160 units per week. No shortages are allowed. It costs $250 to initiate manufacturing to produce at a rate of 500 units per week. The unit production cost is $40. The holding cost is $0.25 per unit. Determine
i) the minimum cost production quantity,
ii) the minimum cost procurement level if production lead time is 12 weeks.

Q7. Customers arrive at a rate of 180 per hour at either of two vending machines, each of which can service 240 customers per hour. Assuming a Poisson distribution for arrivals and an exponential distribution for the service time, determine the expected waiting time per customer. Recalculate if one of the vending machines is broken and cannot be used.

Q8. In Question 7 above, if the cost of operating a vending machine over its lifetime is $100 per day, and the cost of having customers waiting for service is 50 cents per minute, what is the optimum number of vending machines?

Q9. A survey taken over 20 days showed the number of defective cars on a highway as per Table I, below. A sample of 150 cars was taken during each day. Construct a c-chart for the data. Is there any assignable cause of variation during this period?

Day

Defective cars

Day

Defective cars

1

12

11

9

2

15

12

7

3

13

13

13

4

7

14

10

5

14

15

6

6

17

16

18

7

8

17

15

8

21

18

5

9

12

19

14

10

14

20

12

Q10. Eight maintenance activities, their normal durations in weeks, and the crew sizes for the normal conditions are as follows:

Activity

Duration (weeks)

Crew size

AC

4

6

BC

6

8

BE

3

3

CD

2

3

CE

4

2

DF

6

4

EF

5

5

FG

4

8

i) Represent the maintenance project in the form of an activity-event network.
ii) Identify the critical path and find the minimum time for project completion.
iii) Extra crew members can be used to expedite activities BC, DF and EF at a cost given below:

Extra crew

Weeks saved

Crash cost per week

1

1

$100

2

2

$125

3

2

$150

4

3

$200

If there is a penalty cost of $1,200 per week beyond the minimum maintenance time of 16 weeks, then recommend the minimum-cost schedule.

Reference no: EM131475404

Questions Cloud

Were any of those issues surprising : Describe what you learned from some of the feedback your writing specialist provided as explanations.
Discuss which stages of organizational growth presents : Write a one to two page paper in which you discuss which of the first four stages of organizational growth presents the greatest single challenge and why.
What is the difference between push and pop : What is the difference between PUSH and POP operations in the stack?
What are all of the elements of a contract : The lease stated that she was able to drive the car 10,000 miles per year, anything in excess of 10,000 miles would be charged at 25 cents a mile.
What is the optimum number of vending machines : ENGG450 - Systems Design and Engineering What is the rate of return if the equipment is in operation for 20 years and For what lifetime will the equipment give a return of 10% ?
Article regarding multicultural teams : Share a current event article regarding multicultural teams. Write a brief summary, and explain why you felt the article was relevant.
Explore the eeoc website to learn more about organization : Explore the EEOC website to learn more about the organization. A description of the compliance issue that led to lawsuit and its ramifications for organization.
Vertical and horizontal linkages : Diagram via an organizational chart Vertical and Horizontal Linkages in your current or previous organization
Differentiate program counter and a memory address register : What is the difference between a program counter and a memory address register?

Reviews

Write a Review

Other Engineering Questions & Answers

  Characterization technology for nanomaterials

Calculate the reciprocal lattice of the body-centred cubic and Show that the reciprocal of the face-centred cubic (fcc) structure is itself a bcc structure.

  Calculate the gasoline savings

How much gasoline do vehicles with the following fuel efficiencies consume in one year? Calculate the gasoline savings, in gallons per year, created by the following two options. Show all your work, and draw boxes around your answers.

  Design and modelling of adsorption chromatography

Design and modelling of adsorption chromatography based on isotherm data

  Application of mechatronics engineering

Write an essay on Application of Mechatronics Engineering

  Growth chracteristics of the organism

To examine the relationship between fermenter design and operating conditions, oxygen transfer capability and microbial growth.

  Block diagram, system performance and responses

Questions based on Block Diagram, System Performance and Responses.

  Explain the difference in a technical performance measure

good understanding of Mil-Std-499 and Mil-Std-499A

  Electrode impedances

How did this procedure affect the signal observed from the electrode and the electrode impedances?

  Write a report on environmental companies

Write a report on environmental companies

  Scanning electron microscopy

Prepare a schematic diagram below of the major parts of the SEM

  Design a pumping and piping system

creating the pumping and piping system to supply cool water to the condenser

  A repulsive potential energy should be a positive one

Using the data provided on the webvista site in the file marked vdw.txt, try to develop a mathematical equation for the vdW potential we discussed in class, U(x), that best fits the data

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd