What is the minimum number of workstations needed

Assignment Help Operation Management
Reference no: EM13226252

An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times? (Round your answers to 1 decimal place.) Minimum cycle time minutes Maximum cycle time minutes b. What range of daily output is theoretically possible for the line? (Round your answers to 1 decimal place. Enter the smaller value in the first box and the larger value in the second box.) Range of output to units/day c. What is the minimum number of workstations needed if the maximum output rate is to be sought? (Round your answer to the next whole number.) Minimum number of workstations d. What cycle time will provide an output rate of 125 units per day? (Round your answer to 1 decimal place.) Cycle time min/cycle e. What output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes? Cycle Time Potential Output (1) units (2) units

Reference no: EM13226252

Questions Cloud

Find the magnitude of the phase current in the load : A three-phase generator is Y-connected. It has phase voltages of 277 V. A delta-connected load is attached to the lines coming from the generator. Each phase of the load has an impedance of 9/41
Explain produce the indicated polymeric substrate products : Show step-by-step mechanisms to produce the indicated polymeric substrate products. include an appropriate termination step where needed.
Determine how each corporate culture differ : Determine how each corporate culture differs from the other and analyze ways that each unique culture has benefited by the other's competition.
Discuss a plan of action-personally implement to avoid : Discuss a plan of action that you and your partner would personally implement to avoid the following 4 main failure mechanisms of small businesses
What is the minimum number of workstations needed : Cycle time min/cycle e. What output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes? Cycle Time Potential Output (1) units (2) units
Explain synthesizing 2-choloro-3-methylbutane : Provides as many reasonable ways as possible of synthesizing 2-choloro-3-methylbutane as the major substrate product starting with substrates that contain 3 or more carbon atoms
How much could the firm save annually in ordering : How much could the firm save annually in ordering and carrying costs by using the EOQ?
Explain curved arrow notation for the conversion : provide a specific step by step mechanism ( with curved arrow notation) for the conversion of 4-hydroxybutanal to 4-chloro-1-butanol, and then from 4-chloro-1-butanol to tetrahydrofuran.
Molarity and molality of acetone in this solution : An aqueous solution is prepared by diluting 3.30 mL acetone,(d= 0.789g/mL) with water to a final volume of 75.0 mL. The density of the solution is 0.993 g/mL. What is the molarity and molality of acetone in this solution?

Reviews

Write a Review

Operation Management Questions & Answers

  Discussion on short range plans

Discuss short-range plans; include a brief description of the various types of short-range plans. Give a business example of each type of plan.

  How many kanban card sets are needed

Approximately five vehicles are produced each hour, and management has decided that 20 percent of expected demand should be maintained as safety stock. How many kanban card sets are needed?

  Burrito king would like to know the expected average time

Burrito king would like to know the expected average time in the system, the average line length (in cars) and the average number of cars in the system (both in line and at the window)

  Distinguish between utilization and efficiency

What are the four special considerations for a good capacity decision? Distinguish between utilization and efficiency.

  Computing the composite rating

A location analysis for Temponi Controls, a small manufacturer of parts for high-technology cable systems, has been narrowed down to 4 locations.

  Determine the percentage of idle time

Determine the percentage of idle time that would result if two stations were used and each station was loaded with the worktime shown in Part b(1).

  Create value and sustain competitive advantage

How does each company create value and sustain competitive advantage through business strategy and what measurement guidelines is each company using to verify its strategic effectiveness?

  Identify the activities on the critical path

Charlie Cook (see question 1 above) was able to decide the activity times for constructing his chemical contaminant tracking machine. Identify the activities on the critical path.

  What economic forces affect the industry

What economic forces affect the industry?

  Who is the targeted customer

Describe Shutter fly's business-level strategy. Who is the targeted customer. Which customer needs does the organization satisfy. Explain how does the organization use its competencies to satisfy these needs.

  Discuss how managers could best leverage

discuss how managers could best leverage the Federal Registry's Website

  Determine the 3-sigma upper control limit

The results of inspection of DNA samples taken over the past 10 days are given below. Sample size is 100.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd