What is the minimum deflection of the spring

Assignment Help Project Management
Reference no: EM131410218

A Pachinko machine launches a ball of mass m=0.03kg vertically through a loop of radius r=0.5m with vertical rise h=1m. The spring launcher is pulled down a distance of x=0.1 m. The spring constant is k= 100N/m

What is the minimum deflection of the spring, x, needed to clear the loop

Reference no: EM131410218

Questions Cloud

What is the shortest time project can be completed within : It costs €1,000 to reduce the duration of an activity by 1. If there is €12,000 available to reduce the duration, what is the shortest time the project can be completed within? What are the minimum resources needed by the revised schedule?
What is the acceleration of the counter weight : In an Incline Plane experiment, a cart has a mass of 496 grams and the weight has an unknown mass; the incline angle is 8.12°, and the cart accelerates up the track at 3.22 m/s2. What is the acceleration of the counter weight?
Initial value of the convertible energy for collision : A 7.45 g bullet is fired at a 4.0 kg wooden block hanging from a very light string. The bullet strikesthe stationary block at 360 m/s, and lodges in the wood. The bullet/block combination then swings upward to aheight h above its initial position.
Describe how you have compiled a list of suppliers : Describe how you have compiled a list of suppliers. What methodology did you use? What are the challenges you have encountered while trying to find potential suppliers?
What is the minimum deflection of the spring : A Pachinko machine launches a ball of mass m=0.03kg vertically through a loop of radius r=0.5m with vertical rise h=1m. The spring launcher is pulled down a distance of x=0.1 m. The spring constant is k= 100N/m. What is the minimum deflection of t..
What is the kinetic energy of the main part : (a) What is the total mechanical energy of the roller coaster/earth system at the 40m hilltop? (b) What is the kinetic energy of the roller coaster at the 5m dip? (c) What is the kinetic energy of the main part of the roller coaster at the 30m crest ..
Which has the lowest total cost of production : The factory will have an annual production capacity of 10,000 steel utensils and in the initial years, it will operate at 75%efficiency. Find the best location option, Which has the lowest total cost of production.
Calculate optimum quantities of products slack : Formulate the linear programming problem calculate optimum quantities of products slacks and total profit and also conduct sensitivity analysis accordingly using simplest method?
What are some negative consequences of false memories : What is the main point of the article?What do we know about memory and false memories from studies that use the "lost in the mall" procedure, according to Loftus?Why do we need studies that attempt to plant implausible or impossible memories?Loftus m..

Reviews

Write a Review

Project Management Questions & Answers

  What is the operating cash flow for project

Evaluate the operating cash flow for a project - What is the operating cash flow for this project

  Which is the better investment

If both the bond and the continuous income stream earn 3.75%, compounded continuously, which is the better investment?

  Earned value management

Project managers often use Earned Value Management (EVM) if they want to compare the status of their projects to their project plans. Using the same project from Assignment 3, develop a project scenario to explain the amount of work that you have ..

  What would you use to determine if project was successful

A project to bake a cake would measure what and what would you use to determine if the project was successful

  Critical analysis of the structure and content of the pmp

The first part is the body of the assignment and is a 'critical analysis' of your chosen PMP. It will contain a description of the project and a critical analysis of the structure and content of the PMP, fully supported by reference to relevant proje..

  What is the average waiting time in line

What is the average waiting time in line? What is the average number of customers in the system?

  Difference between solicited and unsolicited proposals

Are proposals internal or external documents? What is the difference between solicited and unsolicited proposals?

  Purchase an existing system or build a custom system

Would you recommend that your company purchase an existing system or build a custom system? Would you recommend your company use end-user development or outsource the new system?

  Plot the demand with a graph

Plot the demand with a graph that also shows average requirements. Conduct your analysis for January through August.

  What is the single most important task for users on a system

What is the single most important task for users on a systems development project? Do you agree? Why or why not? Why must requirements emerge as a result of a conversation between users and IT professionals?

  How many workers will be needed to man the line

If demand for televisions is reduced to 100 sets per 40-hour week, how many workers will be needed to man the line? Re-balance the line and re-calculate its efficiency.

  What statistical assumptions have you implicitly adopted

If you use the standard deviation as a measure of the variability in a sample, what statistical assumptions have you implicitly adopted?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd