What is the largest rectangular interior room that can be

Assignment Help Civil Engineering
Reference no: EM13540150

Matt is building a stand made out of mud bricks ( ultimatecompressive strength approximately 100 psi and density 250lbs/cubit foot) in the shape of a tent (triangular sides, verticalfront and back). The footprint of the building is 60ft x 60 ft. Thetriangle building height is 60ft. What is the largest rectangularinterior room that can be built (length x width x height). Assume that length = width and the minimum height is 10 ft and that thefront and rear of the room is flush with the front and rear of thebuilding. (people will be standing inside the room).

Reference no: EM13540150

Questions Cloud

A cantilever beam is additionally supported using : A cantilever beam is additionally supported using two tierods. Both rods attach to the end of the beam. One rod comes off at 45 degrees and attaches
Determine the ratio of the weight of the solid shaft : Two shafts are made of the same material and are of equal lengths.one of them is solid and another one is hollow. the ratio ofinside and outside diameters for hollow shaft is 0.65. They are subjected to the same torque and same maximum shearstress. D..
Compare this path line with the streamline through the same : Consider a velocity field V = axiˆ + by(1+ ct) ˆj , where a=b=2 sec-1, and c=0.4sec-1. For the particle that passes through the point (x,y)=(1,1) at the instant t=0, plot the pathline during the interval from t=0 to 1.5 sec.
Determine the magnitude and direction of the shear stress : Crude oil, with specific gravity SG=0.85 and viscosityμ = 2.15×10−3 lbf sec/ft2, flows steadily down a surfaceinclined θ = 30 degrees below the horizontal in a film ofthickness h=0.125 in. The velocity profile is given by u =ρg/μ(hy − y2/2)sinθ
What is the largest rectangular interior room that can be : Matt is building a stand made out of mud bricks ( ultimatecompressive strength approximately 100 psi and density 250lbs/cubit foot) in the shape of a tent
What do they estimate thhe acceleration due to gravity to be : In an experiment to estimate the acceleration due to gravity,a student drops a ball at a distance of 1m above the floor. His labpartner measures the time it takes to fall and obtains an estimateof 0.46s.
How long does it take to reach an altitude of 3000m : Missiles designed for defense against ballistic missiles haveattained accelerations in excess of 100g's or 100 times theacceleration due to gravity. Suppose that the missile
How many hours should it take an articulated wheel loader : How many hours should it take an articulated wheel loader equipped with a 4 yd bucket to load 3000 cu yd of gravel from a stockpike into rail cars
What will be the discharge : A concrete sewer pipe 1m in diameter is laid so it has a drop in elevation of 30cm per 300m of length. If sewage (assume the properties are the same as those of water) flows at a depth of 50cm in the pipe, what will be the discharge?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd