What is the impact of leveling within slack

Assignment Help Project Management
Reference no: EM131093108

Question:

Conveyor Belt project; Schedule

Description Resource Duration (days) Preceding Activity
Architectural decision Design 25 -
Hardware specifications Development, design 50 1
Kernel specifications Design 20 1
Utilities specifications Development, design 15 1
Hardware design Design, development 70 2
Disk drivers Assembly, development 100 3
Memory management Development 90 3
operating system documentation Design, documentation 25 3
Routine utilities Development 60 4
Complex utilities Development 80 4
Utilties documentation Documentation, design 20 4
Hardware documentation Documentation, design 30 5
integration first phase Assembly, development 50 6,7,8,9,10,11,12
Prototypes Assembly, development 80 13
serial I/O drivers Development 130 13
System hard/software test Assembly 25 14,15
Order circuit boards Purchasing 5 16
Network interface Development 90 16
shell Development 60 16
Project documentation Documentation, development 50 16
Assemble preproduction models Assembly, development 30 17F-S, lag 50 days
Integrated acceptance testing Assembly, development 60 18,19,20,21

Include the following printouts:

- A Gantt chart.
- A network diagram highlighting the critical path.
- A schedule table reporting. ES, LS, EF, LF, and slack for each activity.

Hint: the project should be completed in 530 days.

Remember: Save your file for future exercises!

Part 2

Remember the old saying, "A project plan is not a schedule until resources are committed." This exercise illustrates this subtle, but very important, difference.

Part A

Using your files from Part 2 input resources and their costs if you have not already done so. All information is found in Tables A2.10 and A2.11.

Prepare a memo that addresses the following questions:

1. Which if any of the resources are overallocated?

2. Assume that the project is time constrained and try to resolve any overallocation problems by leveling within slack. What happens?

3. What is the impact of leveling within slack on the sensitivity of the network? Include a Gantt chart with the schedule table after leveling within slack.

4. Assume the project is resource constrained and resolve any overallocation problems by leveling outside of slack. What happens? What are the managerial implications?

5. What options are available at this point in time?

Include a Gantt chart with the schedule table after leveling outside of slack.

Note: No splitting of activities is allowed.

Note: No partial assignments (e.g., 50 percent). All resources must be assigned 100 percent.

Part B

When you show the resource-constrained network to top management, they are visibly shaken. After some explanation and negotiation they make the following compromise with you:

- The project must be completed no later than February 2, 2012 (530 days).

- You may assign two additional development teams.

- If this does not suffice, you may hire other development teams from the outside. Hire as few external teams as possible because they cost $50 more per hour than your inside development people.

Internal Development

Add as many development units (teams) as needed to stay within the 530 days. If you need more than two internal development units, then hire as few external teams as necessary. Select the cheapest possibility! Change as few activities as possible. It is recommended you keep work packages which require cooperation of several organizational units inside your company. You decide how best to do this.

Hint: Undo leveling prior to adding new resources.

Once you have obtained a schedule that meets the time and resource constraints, prepare a memo that addresses the following questions:

1. What changes did you make and why?

2. How long will the project take?

3. How did these changes affect the sensitivity of the network?

Include a Gantt chart with a schedule table presenting the new schedule.

Part 4

Based on the file created at the end of Part 3, prepare a memo that addresses the following questions:

1. How much will the project cost?

Follow the instructions given in the Overview and Video Tutorials to complete Part 2 of the Conveyor Belt Project in Appendix 2 of the text book:

. Open the Conveyor Belt Project file from the last module.

. Enter the predecessors using the steps given under Data Entry in the overview.

. Save a pdf of the data entry screen.

. Save a pdf of the project schedule table.

. Save a pdf of the network diagram.

. Save a pdf of the Gantt chart.

. Answer all the questions given in Part 2.

Verified Expert

The solution is prepared in MS word Docs, The assignment is about project management where the discussion of Conveyor Belt Project is done. This is verified solution and its answering all the questions mentioned in requirement.

Reference no: EM131093108

Questions Cloud

What is the efficient production of the good : Draw a graph of aggregate demand, indicating the values of the vertical and horizontal intercepts (that is, the value of P at which Q=0, and the value of Q at which P=0). It should be clear to you that this demand is the vertical summation of indi..
Competition is important source of competition for firm : Provide an example of where inter-industry competition is an important source of competition for a firm. Provide an example of where foreign competition is an important source of competition for a firm. Provide an example of where contestable markets..
What would be the consumer surplus of each group : A night-club owner has both student and adult customers. The demand for drinks by a typical student is QS = 18 − 3P. The demand for drinks by a typical adult is QA = 10 − 2P. There are equal numbers of students and adults. The marginal cost of each d..
What is the impact of leveling within slack : What is the impact of leveling within slack on the sensitivity of the network? Include a Gantt chart with the schedule table after leveling within slack - How did these changes affect the sensitivity of the network?
What is the revenue under this price strategy : A university has determined that its students fall into two categories when it comes to room and board demand. University planners call these two types Sleepers and Eaters. Currently, the university offers students the option of selecting just the do..
An unknown liquid reaches level : A container has a vertical tube, whose inner radius is 12.00 mm, connected to it at its side. An unknown liquid reaches level A in the container and level B in the tubeA????1
Discuss how a problem facing the organization impacts : Discuss how a problem facing the organization impacts your organization. Discuss how your topic of choice (a problem facing the organization) impacts your organization.
Determine if fiber content has effect on concrete strength : Analyze these data to determine if fiber content has an effect on concrete strength, and if so, describe that effect

Reviews

Write a Review

Project Management Questions & Answers

  Describe a project you have been involved in at work

Describe a project you have been involved in at work or at home where formal project management was not used. How would the project have been improved if the project management process presented in this unit had been used

  Why are pms so concerned with resource allocation

Given the fact that a project's resources requirements are clearly spelled out in the projects action plan and why are PM's so concerned with resource allocation?

  Determining the best production plan

Based on the above, determine the best production plan that the company should adopt when the sole objective is to minimize costs.

  Define and show formal and informal communication networks

Define and show formal and informal communication networks as well as the three important functions of formal communication networks.

  Merits of different approaches of every project

Before we go into the merits of different approaches we will view the following stages though which every project goes through.

  Scientific analysis of a pqm-relevant topic

This assignment brief gives you guidelines for preparing your report for the first assignment of Project Quality Management (PQM) unit. This assignment is intended to help you: Achieve a deeper level of learning through scientific analysis of a PQM-..

  Investment and performance analysis

Evaluate the usefulness of ROCE

  The wbfk transport company

The WBFK Transport Company operates throughout mainland Australia. The company specialize in fast delivery of pallet-loads of goods from one WBFK depot to another WBFK depot. It does not do pickups at a customers premises nor does it deliver door to ..

  Effective when preparing to begin a project initiation

Project Team Attributes - what are the attributes necessary for a team to be effective when preparing to begin a project initiation?

  Idenitfy an it project

Idenitfy an IT project that failed. Using the IT project risk framework, identify at least four explicit or implicit risks that may have impacted the project. For each of the risks you identify, provide an analysis of the risk, assign one of the Risk..

  Questioni discuss relevance of re-work in project

questioni discuss relevance of re-work in project management and importance of taking it into consideration as

  Using the fixed-order quantity model

Using the fixed-order quantity model, which of the following is the total ordering cost of inventory given an annual demand of 36,000 units

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd