A tank operated as a CFSTR used to remove benzene from a flow stream is 1500 m3 in size. The flow rate in and out of the tank is 8 m3/day. If the influent benzene concentration of 265 ug/L and the effluent concentration is 12 ug/L, what is the first order decay coefficient in day-1.

Reference no: EM13317892

Questions Cloud

Determine point of application from the base of wall : he top of the soil is level with the top of the wall, and the soil carries a uniformly distributed load of 500 psf. Calculate the total active earth force of the wall per linear foot and determine its point of application
Determine the waters speed in the wider pipe : Water flowing in a horizontal pipe is at a pressure of 1.55 105 Pa at a point where its cross-sectional area is 6.00 m2. Find the water's speed in the wider pipe
Estimate cross sectional dimension of bar under strain : A 1000 in diameter solid steel (p= 0.303) bar is 10.0 ft long. Under a tensile load. (a) Estimate the lateral strain experienced by the bar (b) Estimate the cross sectional dimension of the bar when under strain
Estimate the net outward force on a passengers eardrum : An airplane takes off at sea level and climbs to a height of 480 m. Estimate the net outward force on a passenger's eardrum assuming the density of air is approximately constant
What is the first order decay coefficient in day-1 : A tank operated as a CFSTR used to remove benzene from a flow stream is 1500 m3 in size. The flow rate in and out of the tank is 8 m3/day. If the influent benzene concentration of 265 ug/L and the effluent concentration is 12 ug/L
Prepare the cad drawings : Need to prepare the CAD drawings
How much work is done by the tension in the cable : A rescue helicopter lifts a 60 kg person straight up by means of a cable. The person has an upward acceleration of 0.70 m/s2, How much work is done by the tension in the cable
Determine what is the volume of the lake in cubic feet : Nitrification, the conversion of ammonia to nitrate (NH3 -> NO3-) occurs in the lake according to first - order kinetics. One stream feeds the lake and one stream empties the lake with the flow rate in both being 8 cfs
What is the flow speed in the narrower section : An ideal fluid flows at 12 m/s in a horizontal pipe. If the pipe narrows to half its original radius, what is the flow speed in the narrower section

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine what is the change in the wires total resistance

You have two wires connected end to end. Wire 1 is copper and wire 2 is made using a special carbon conductor. Wire 1 has a resistance of 0.215 ohms/ft and is 500 ft long. Wire 2 has a resistance of 0.141 ohms/ft and is 700 ft long.

  Determine soil bearing pressure with settlement limitation

The soil below the footings consists of a medium grain sand (SP) and water is located at a depth of 5 feet below the ground surface. The preliminary structural plan calls for a 10 foot wide footing located at a depth of 5 feet which must support a..

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  What temperature change is required to return the specimen

The elastic modulus is 40 GPa, the yield stress is 150 MPa, the ultimate stress is 525 MPa, and the ultimate strain is 0.38 (mm/mm). Perform the following tasks for this material.  compute the tangent modulus between yield stress and ultimate stres..

  Find probability that specimen will contain detectable level

The article "Leachate from Land Disposal Residential Construction Waste" (authored by W.J. Weber, Y.-C Jang, T.G. Townsend, and S. Laux, Journal of Environmental Engineering, 128(3): 237 - 245, 2002) presents a study on contamination

  Determine the landing speed of the airplane if it travels

A 32000 lb airplane lands on an aircraft carrier and is caught by an arresting cable. The cable is inextensible and is paid out at A and B from mechanisms located below deck and consisting of pistons moving in long oil-filled cylinders.

  Calculate each atmospheric condition and note the trend

Find the change in volume of 16.15 lb of water at ordinary atmospheric pressure for three conditions: Calculate each condition and note the trend.

  What assumptions can you make regarding the system

The flow is assumed to be laminar and the film thickness, H, constant. Using a coordinate system located on the plate at the surface of the pool, complete the following: a. Dram and sketch the system. Include coordinate system in your sketch.

  Maximum deflection of the beam

Determine the deflection of the right end of the pointer and the maximum deflection of the beam.

  Construct a v-t graph and an a-t graph at time interval t

A particle begins from s=0 and is traveling along a straight path at a velocity of v=(t^2-4t+3) m/s, where t is in seconds. Construct a v-t graph and an a-t graph at the time interval t=0 to t=4 s.

  Calculate the surface area of the clay particles

The surface area of clay particles can be determined by measuring the number of adsorbate molecules it takes to form a monolayer. The adsorbate molecules used for these measurements are usually N2 gas, therefore partial pressure "P" is used instea..

  What is the elevation difference between high point and pvt

An equal-tangent crest vertical curve has a 50 mi/h design speed. The initial grade is +3%. The high point is at station 33+37.43 and the PVT is at station 37+18.26. What is the elevation difference between the high point and the PVT

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd