Floor-On, Ltd., operates a line that produces self-adhesive tiles. This line consists of single-machine stations and is almost balanced (i.e., station rates are nearly equal). A manufacturing engineer has estimated the bottleneck rate to be 2200 cases per 16-hour day and the raw process time to be 30 minutes. The line has averaged 1,500 cases per day, and cycle time has averaged 5 hours.
a) What is the estimated average WIP level?
b) How does the performance of the average throughput compare to the practical worst case throughput?
c) What would happen to the throughput of the line if we increased the capacity of bottleneck station and held the WIP at its current level?
d) If after process improvements the ten machines that required ten workers to run them are no longer needed. Instead five workers are now needed what would you do with the remainder of workers not working on that line anymore? (And please don’t fire them)
Describe a situation where a leader's role and responsibility changed as the organization became more diverse?
Assignment On Analyzing Religions, The US culture has a broad spectrum of religious affiliations and religiosity. As a result of interacting with people who share similarities, people seldom evaluate the main premises of other religions.
What were the driving factors for the implementation of the U.S. health care system? Are those issues still part of the process for change?
Process Management is about continuous improvement. Discuss similarities and differences between the Deming Cycle Methodology and the Kaizen approach to process improvement.
If it were necessary to crash to 250 or 240 days, Elucidate how would Hill do so also at illustrate what costs. As noted in the case, suppose that optimistic time estimates can be used as crash times.
When the accountant tried to collect, the vice president objected, asserting that the president exceeded his authority. The accountant filed a lawsuit against the vice president seeking payment. How should the court rule? Discuss fully.
Discuss how employers will explain about the training that will be offered to all employees and how employee job skills will change with the implementation.
Balance the line using the longest task time based on the 1,000 unit forecast, stating which tasks would be done in each workstation.
Select a film or book, fiction or non-fiction, or a current news story. Identify and discuss one or more ethical conflicts the story presents with reference to the moral theories.
What are the weakest parts of the business plan?
responsible for monitoring and controlling strategic plans
Building permits are handled by the general contractor (GC). The firm uses the GC for all of its construction in a region. The GC hires local subcontractors and provides on-site construction supervision.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd