Reference no: EM131258661
Chromium contamination is a problem at a number of hazardous-waste sites. At one site local concentrations of chromium reached 60,000 mg chro-mium/kg soil and 19,000 mg/L chromium in the water.
(a) Assuming that the aqueous chromium reached equilibrium with the adsorbed chromium, determine a sorption coefficient (in L/kg) for the soil at the site.
(b) At a site 200 ft downgradient, the aqueous chromium concentration was mea. sured to be 1,000 mg/L. Compute the sorbed concentration in equilib-rium with this aqueous concentration using the equilibrium constant determined in part (a).
(c) In order to treat the contaminated groundwater at this site, a three-step process is used. First, the water is pumped out of the ground and the pH is then reduced from 3.5 to 2.3. Next the chro-mium is chemically reduced from hexavalent Cr(VI) to trivalent Cr(III). Finally, the chromium is removed from the water by raising the pH, causing Cr(OH)3(s) No to precipitate. The equilibrium expression for this final reaction is

If the pH of the water is raised to 8.5, what is the equilibrium concentration of the chromium(III) in mole/L?
(d) What weight (in pounds) of precipitate is formed if groundwater containing 19,000 mg/L chromium is treated as described in part (c) and the volume of the precipitation tank is 6,000 gal?
Examine the supply chain used by your chosen company
: Examine the supply chain used by your chosen company.· Illustrate the importance of packaging by putting together the "perfect package" for the product/service chosen in this project.· Differentiate between the demand side and the supply side of m..
|
Labelled indifference curve diagram
: Provide a labelled Indifference Curve diagram and supplementary calculations to illustrate and quantify the Income and Substitution Effects for this wage increase. Calculate and show Bundles "A", "B" and "C", the slopes and intercepts for the Budg..
|
How specifically you plan to either leverage insight present
: From the first e-Activity, share an insight that you learned about yourself related to management readiness. Indicate how specifically you plan to either leverage the insight at present or act on it in the future. Provide support for your rational..
|
Identify some of the problems faced by a company
: Using sources from the Internet, identify some of the problems faced by a company of your choosing as it moves toward, or operates as, a virtual organization.
|
What is the equilibrium concentration of the chromium
: Chromium contamination is a problem at a number of hazardous-waste sites. At one site local concentrations of chromium reached 60,000 mg chro-mium/kg soil and 19,000 mg/L chromium in the water.
|
What is bakers percent of assets committed to inventory
: What is Baker's inventory turnover? - What is Baker's percent of assets committed to inventory? - How does Baker's performance compare to the industry leaders?
|
Evaluate the function at a range of x values
: Write a function file, that accepts values of x as inputs and outputs the value of y when the input is passed through the following function. Evaluate the function at a range of x values from 0 to 1 with 143 elements.
|
Propose two applications of knowledge that you have learned
: Rate the three (3) most important concepts that you learned in this course in order of importance (one (1) being the most important; three (3), the least). Provide a rationale for your ratings. Propose two (2) applications of knowledge that you ha..
|
Maximize total returns on loans
: To maximize total returns on loans made by the bank, P, state the objective function using A and B to represent the two companies, respectively.
|