An equal tangent sag vertical curve has an initial grade of -2.5%. we know that the final grade is upward and elevation of the curve low point is 270 ft at the station of 141+00. Elevation of the PVT is 274ft and the design speed is 35 mph. What is the elevation and station of the PVC and PVI?

Reference no: EM132416398

Questions Cloud

What is the percent difference in the air speed for flights : (a) What is the percent difference in the air speed for Flights 333 and 444? This excludes the transfer time in St. Louis.
How many cubic yards of soil must be excavated : Question 1: How many cubic yards of soil must be excavated from the borrow pit?
What is the discharge load in lb-day : A municipal treatment plant has a discharge flow of 36MGD and an effluent BOD concentration of 14mg/l. What is the discharge load in lb/day?
Determine the upward force the water will exert on the duct : Determine the upward force the water will exert on the duct.Take the densities of air and water to be 1.3 kg/m3and 1000 kg/m3, respectively.
What is the elevation and station of the pvc and pvi : An equal tangent sag vertical curve has an initial grade of -2.5%. we know that the final grade is upward and elevation of the curve low point is 270 ft
Determine the excess pore pressure at the centre : Assuming consolidation is one-dimensional determine the excess pore pressure at the centre of the layer when 70% of its final settlement has occurred.
Design of low-rise buildings main : A commercial low-rise building is to be designed based on the architectural plans shown in drawings XXX/YYY/2016/001 to XXX/YYY/2016/004.
Construction of a finite field : Define a primitive RS code over the finite field in the previous part which can correct two errors and Construction of a finite field.
Compute the rate of heat transfer through the roof : a) Compute the rate of heat transfer through the roof if it has an R-value of 3.1 m2-C/W.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Compute reaction components that hinge a and roller b

The blue plane supporting the roller lis parallel to the xy plane. Force P=600N loads the plate at C. Compute the reaction components that hinge A and roller B exert on the triangular plate.

  Modefication of hydraulic lift to operate electrically

Prepare a bachelor thesis about the modification of (WG 300/2000) hydraulic lift to operate electrically - Explain the possible methods

  What is the maximum superimposed load

After the concrete cures and reaches its full strength, what is the maximum superimposed load (psf) that the floor can support

  What is mx the moment of force at point o about x-axis

Using an 9.34 in long wrench, the bolt has now been unscrewed a length of 1.10 in. The force of F={-52.7i +7.00j +6.00k} lb is still applied to the wrench at point B.

  Find the total work and the heat transfer from the ambient

The partition ruptures, and the nitrogen comes to a uniform state at 100?C. Assuming the surroundings are at 25?C, find the actual heat transfer and the irreversibility in the process.

  How high will water rise between plates due to the action

Two vertical, parallel, clean, glass plates are spaced a distance of 2.3 mm apart. If the plates are placed in water how high will the water rise between the plates (in mm) due to capillary action

  Calculate the deflection of the column you must choose the

Calculate the deflection of the column. You must choose the number of steel rods n, and the rod diameter. Exact location of roads does not need to be specified. You must also chose a thickness of the wrap.

  How long would figure soil will take to reach contamination

The local engineer concludes that, since the oil must have been destroyed by the soil microorganisms at a rate of 20 mg/kg each year, in one more year the site will be free of all contamination. a. Is this a good assumption

  Cash flow analysis for the entire project duration

Develop role descriptions and responsibilities with your own team of 3 to4 within your own team. That is to find out what needs to be done in a project selected

  Compute the true static height

A Kennedy half dollar has a mass of 1.150 X 10-2 Kg. The coins is a mixture of silver and cooper, and in water weights 0.1011 N. What is the mass of the silver?

  What order and class of leveling does this represent

The relative error of the difference in elevation between two benchmarks directly connected in a level circuit and located 90 km apart is ±0.009 m. What order and class of leveling does this represent?

  Determine the size of the largest hole for the iron atoms

Show that, for the fcc unit cell, the radius r of the largest hole is given by r = 0.414R . Determine the size of the largest hole for the iron atoms in the fcc structure.

Free Assignment Quote