What is the duration of the entire rainfall event

Assignment Help Civil Engineering
Reference no: EM131268753 , Length: 6

Surface and Sub-surface Hydrology

Q1) Consider the rainfall event having 5-min cumulative rainfall record given below:

a) What is the duration of the entire rainfall event and the corresponding total rainfall amount?

b) Find the rainfall depth hyetograph (in tabular form) with 10-min time interval for the storm event.

c) Find the maximum 10-min and 20-min average rainfall intensities (in mm/hr) for the storm event.

Time (min)

Cumulative rainfall (mm)

0

0

5

7

10

14

15

23

20

34

25

45

30

58

35

70

40

81

45

91

50

100

55

110

60

119

65

125

70

131

75

136

80

140

85

140

Q2) An experimental rectangular plot of 10 km x 12 km has five rain guage stations as shown in the figure below. The storm rainfall and coordinates of the stations are given in the table. Based on the position of the five rain gauges, construct the Thiessen polygon for them and estimate the mean annual rainfall that falls on the plot.

Station

(x,y)

Mean annual rainfall (cm)

A

(1, 3)

128

B

(8, 11)

114

C

(3, 10)

136

D

(5, 8)

144

E

(7, 5)

109

Q3) Consider a 2-hr storm event with a total rainfall amount of 80 mm. the measured direct runoff volume produced by the storm is 40 mm.

a) Determine the decay constant k in Horton's infiltration model knowing that the initial and ultimate infiltration rates are 30 mm/hr and 2 mm/hr, respectively.

b) Use the Horton equation developed in Part (a) to determine the excess rainfall intensity (mm/hr) hyetograph for the following storm event.

Time (min)

0-10

10-20

20-30

Incremental rainfall depth (mm)

5

20

10

Q4) Consider the following storm event given below for a small catchment of 120 hectares. For baseflow of 0.05 m3/s:
a) Compute the volume of direct runoff (in mm),

b) Assuming initial losses (abstraction) are 5 mm, determine the value of the Φ-index (in mm/hr)

c) The corresponding effective rainfall intensity hyetograph (in mm/hr)

Time (min)

Cumulative rainfall (mm)

Discharge (m3/s)

0

0

0.05

5

5 (initial loss)

0.05

10

20

0.25

15

35

0.65

20

45

0.35

25

 

0.15

30

 

0.05

Q5) Obtain a Unit Hydrograph for a basin of 273.6 km2 of area using the rainfall and streamflow data tabulated below. Assume baseflow to be 150 m3/s.

Time (h)

Rainfall (cm)

Observed Hydrograph (m3/s)

0

0

150

1

0.25

150

2

2.75

350

3

2.75

800

4

0.25

1200

5

 

1100

6

 

650

7

 

400

8

 

300

9

 

200

10

 

150

11

 

140

Q6) The following table contains the records of rainfall and runoff data of a particular storm event for a watershed with drainage area of 8.4 km2:

a) Determine the maximum rainfall intensity for durations of 30 min, 60 min, and 120 min.

b) Determine the percentage of total rainfall that is abstracted (lost) and does not contribute to runoff.

Time Of day

Cumulative rainfall (mm)

Instantaneous Runoff (m3/s)

4:00

0

0.0

4:30

30

0.3

5:00

80

4.2

5:30

90

11.3

6:00

95

13.0

6:30

127

34.0

7:00

130

45.3

7:30

132

21.2

8:00

 

9.3

8:30

 

4.8

9:00

 

2.5

9:30

 

1.4

10:00

 

0.8

10:30

 

0.0

Total

 

148.1

Q7) The parameters for Horton's equation are f0 = 3.0 in/h, fc = 0.5 in/h, and K = 4.0 h-1. Determine the infiltration rate and cumulative infiltration at 0.25-hr increments up to 4 hr from the beginning of infiltration. Assume continuous ponding.

Q8) Using the 1-hr unit hydrograph shown below, determine the direct runoff hydrograph for a 3-hr storm in which 1 in of excess rainfall occurred in the first hour, 2 in the second hour, and 0.5 in the third hour.

What is the area of the watershed in mi2?

Time period

Unit hydrograph (cfs)

0

0

1

100

2

300

3

500

4

700

5

400

6

200

7

100

8

0

Q9) A 600-hectare farm land receives annual rainfall of 2500 mm. There is a river flowing through the farm land with inflow rate of 5 m3/s and outflow of 4 m3/s. The annual water storage in the farm land system increases by 2.5 x 106 m3. Assuming there is no groundwater flow, then based on the system hydrologic budget equation, determine the annual evapotranspiration amount (in m3). [ Note: 1 hectare = 10,000 m2 ]

Q10) For the basin shown below, use (a) the Average method, b) The Thiessen method, and c) The Isohyetal method to estimate the average rainfall (in mm) on the basin.

331_Figure.jpg

Reference no: EM131268753

Questions Cloud

If the price is increased will revenue increase or decrease : The price demand equation for hamburgers at a fast-food restaurant is X+400P=3,000.- Currently, the price of a hamburger is $3.00. If the price is increased by 10%, will revenue increase or decrease?
Computers and troubleshoot problems : Discuss the following and remember we're learning how to work on computers and troubleshoot problems. We are the computer experts. There's no one for us to call, we are the ones people call! Don't rest until you have a thorough paragraph that show..
It security and policies : The introduction to ISO 27002:2005 includes this statement: "This International Standard may be regarded as a starting point for developing organization-specific guidelines. Not all of the controls and guidance in this code of practice may be appl..
Identify and describe key stakeholders and the factors : Identify and describe key stakeholders and the factors that must be considered when analyzing your project's environmental problem. mine if other stakeholder groups should be included and describe them.
What is the duration of the entire rainfall event : WATER RESOURCES MASTER PROGRAM - What is the duration of the entire rainfall event and the corresponding total rainfall amount and Find the rainfall depth hyetograph (in tabular form) with 10-min time interval for the storm event.
If the price is decreased will revenue increase or decrease : The price demand equation for an order of fries at a fast-food restaurant is x+1,000p=2,500.- If the price is decreased by 10%, will revenue increase or decrease?
How important is creativity to cisco''s success : Why did John Chambers see cross-divisional teams and collaboration as the solution to Cisco's problems?
Will revenue increase or decrease : If the current price of an order of fries is $1.29, will a 10% price decrease cause revenue to increase or decrease?- will revenue increase or decrease?
What are the elements of the risk-assessment paradigm : What are the elements of the risk-assessment paradigm? How can these elements be applied in a workplace setting in which an emergency responder is addressing a large spill of trichloroethylene?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd